BUILDING 107 Building 107 TEVSC seminar 9 December
BUILDING 107 Building 107 TE-VSC seminar 9 December 2011
BUILDING 107 Building 107 Update N. KOS for the 107 project team Building 107 u Introduction u Project team u Location u Design status u Planning TE-VSC seminar 9 December 2011
BUILDING 107 Betty Magnin Rui de Oliveira Leonel Ferreira Marina Malabaila Cristiana Colloca Juan Gomez Michel Obrecht James Vernal Pierre Strubin Nico Kos Building 107 CERN team for building 107 TE/MPE TE/VSC DGS/SEE EN/EL EN/CV GS/SE TE/HDO TE/VSC Future user Safety link person Electrical expert HVAC expert (Heating, Ventilation, Air-Cond. ) Civil eng. expert, deputy project leader Project leader (until September 2011) Project leader (from September 2011) TE-VSC seminar 9 December 2011
Location on the Meyrin site BUILDING 107 Existing building 174 will be demolished during the first months of 2012 Building 107 TE-VSC seminar 9 December 2011
BUILDING 107 Aerial view of 107 TE-MPE (printed circuit boards, electronic modules) TE-VSC (surface finishing) Building 107 TE-VSC seminar >> further detail from Leonel 9 December 2011
Design Status BUILDING 107 Design started in April 2011 and is carried out in 3 phases by an external consultant (Royal Haskoning) on contract S 147/TE: § • • • § Building 107 Phase 1 - Preliminary design, indicating the main design choices, has been completed. Phase 2 - Tender design, with sufficient detail to tender for the construction contract, is ongoing and should be finished by February 2012. Phase 3 – Construction design, with all required detail for the construction, will be finished by early April 2012. Royal Haskoning will subsequently supervise the construction of the building from July 2012 until November 2013. TE-VSC seminar 9 December 2011
BUILDING 107 § § § Design novelties Parking on the roof to partially compensate the loss of parking places. Electrical transformer on the roof to reduce the footprint of the building (and for aesthetic reasons). Not a novelty at CERN but worth mentioning: Part of the roof surface is pre-equipped with anchoring points for solar panels (on the request of CERN’s Mr. Energy, H. Burckhart). Building 107 TE-VSC seminar 9 December 2011
BUILDING 107 Design issues As a general rule, CERN applies the most stringent of Swiss and French legislation. (e. g. emissions to conform to a mix of French and Swiss values) Consultant has difficulty with the large amount of rules and regulations CERN supplies and installs certain items Building 107 TE-VSC seminar 9 December 2011
CERN supplied items BUILDING 107 Supplied and installed by contractor (following negotiation with the concerned CERN services): § § § Supplied and installed by CERN: § § § Building 107 Lift IT cabling Electrical transformers and HV connection to 15 k. V sub-station Overhead cranes Fire detectors Fiberoptic cable and star points Programming of HVAC PLC’s TE-VSC seminar 9 December 2011
HVAC impression BUILDING 107 Separate extraction systems: - Building 107 TE-VSC seminar acid/alkaline/chrome cyanide solvents ozone 9 December 2011
BUILDING 107 Planning Based on discussions with all potential general contracting firms (6) and sub -contractors for the surface finishing equipment (2), the completion on 30 November 2013 seems feasible. Building 107 TE-VSC seminar 9 December 2011
Construction site BUILDING 107 Building 107 July 2012 until November 2013 TE-VSC seminar 9 December 2011
BUILDING 107 Conclusion u Design is subject to very stringent legislation (CERN+CH+FR). u Invitation to tender for construction in February 2012. u A number of general contractors (6) and sub-contractors for the surface finishing equipment (2) have been qualified for the invitation to tender. u Construction is scheduled to start in July 2012. u Completion on 30 November 2013 appears feasible. Building 107 TE-VSC seminar 9 December 2011
- Slides: 13