BOSS Major Milestones 2004 06 30 BOSS vertical
BOSS Major Milestones • 2004 -06 -30 BOSS vertical slices – Port Muon recon algorithm (EMC desirable) to the new framework. • 2004 -12 -30 BOSS alpha release – integration with BOOST simulation – Running the reconstruction chain for MDC, TOF, EMC and MC can be achieved in the BOSS Gaudi framework. – EDM for both Raw Data and reconstructed data deployed. Completion of fully functional Event Data I/O. • 2005 -10 -30 BOSS betta release – Simulation and reconstruction chain functions reasonably well and can successfully process several thousand events. – Common physics analysis tools and utilities available. – Physics study in BOSS can start. • 2006 -12 -30 BOSS production release
Status Summary 2005/5/29 Module Name Status MDC Fast track Trk-Eff 99 %, x 160 um, z 4 mm , p 10 Me. V Trk-Eff 99 % , p 6 Me. V , x 140 m, z 0 2 mm Ev. Time MDC-Track-1 MDC-Track-2 Trk-Eff 95 %, p. T 5. 8 Me. V d. E/dx PID Trk-Ext Klmfit TOF Rec. Trk-Eff 100 % , T 83 ps, EMC Rec. Trk-Eff 100 % , E 2%, . 007 rad, . 008 rad Mu. C Rec. Trk-Eff 99 % : Design, programming & testing : Passed the MC data testing : Performance checking and Par. Optimization stage
- Slides: 11