LQ Status • Winding tooling complete. » All winding parts in IB 3 or

LQ Status • Winding tooling complete. » All winding parts in IB 3 or inspection • Curing tooling used is from LHCIR quad program. Preassembly of first LQ practice coil parts. LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 2

LQ Status • Cured coil roll over table is operational. (LHCIR quad tooling) 4

LQ Status • Cured coil roll over table is operational. (LHCIR quad tooling) 4 m dipole coil being extracted from curing mold LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega roll-over station 2 m dipole coil 3

LQ Status • Reaction tooling is being fabricated and is a single cavity, laminated

LQ Status • Reaction tooling is being fabricated and is a single cavity, laminated fixture that can be used for both reaction and epoxy impregnation. LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 4

LQ Status • Splice tooling design is complete and being fabricated. LARP Collab. Meeting

LQ Status • Splice tooling design is complete and being fabricated. LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 5

LQ Status • Reaction fixture roll over tooling in procurement. LARP Collab. Meeting –

LQ Status • Reaction fixture roll over tooling in procurement. LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 6

LQ Status • Feasibility of coil handling and subassembly handling is demonstrated with the

LQ Status • Feasibility of coil handling and subassembly handling is demonstrated with the LM, long dipole mirror: » coils, 2 m and 4 m » mirror magnets, 2 m and 4 m LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 7

2 m Dipole Cured Coil LQ Status 4 m Dipole Potted Coil • Coil

2 m Dipole Cured Coil LQ Status 4 m Dipole Potted Coil • Coil and subassembly handling 4 m Dipole Potted Coil LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 4 m Dipole Potted Coil LQ & LM Status & Plan for FY 08 – Fred Nobrega 8

4 m Dipole Potted Coil LM 02 Clamped Assy LARP Collab. Meeting – SLAC,

4 m Dipole Potted Coil LM 02 Clamped Assy LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 9

LQ Plan for FY 08 • Produce coils, produce coils, and produce coils! •

LQ Plan for FY 08 • Produce coils, produce coils, and produce coils! • Design & procure instrumentation traces. • Procure long lead magnet parts during the 1 st half of year. • Procure remaining LQ magnet parts in 2 nd half of year as money becomes available. • Prepare for magnet assembly in FY 09. LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 10

FY 08 LQ Schedule (as of Oct. 11) LARP Collab. Meeting – SLAC, Oct.

FY 08 LQ Schedule (as of Oct. 11) LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 11

LQ Conclusions • The tooling length scale up for the LQ is nearly complete.

LQ Conclusions • The tooling length scale up for the LQ is nearly complete. • Practice winding to begin within the next week. • Long generic tooling used for the LHC quadrupoles is in place for the LQ practice coils in IB 3. • Valuable experience from moving LM dipole coils and subassemblies can be tapped into for LQ. LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 12

LM Status • 2 m LM 01 PIT mirror: v Successfully tested to short

LM Status • 2 m LM 01 PIT mirror: v Successfully tested to short sample limit (next page) • 4 m LM 02 RRP mirror: v Clamps installed last week v Shell welding this week v Send to VMTF by end Oct. • Long magnet infrastructure: v 100% complete. Dipole Mirror Cross Section Schematic LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 13

LM 01, 2 m PIT Mirror Dipole Quench History Short Sample Limit By Emanuela

LM 01, 2 m PIT Mirror Dipole Quench History Short Sample Limit By Emanuela Barzi 2. 2 K LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 14

LM 02 Reaction Tooling Experience LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007

LM 02 Reaction Tooling Experience LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 15

LM 02 Reaction Tooling Experience LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007

LM 02 Reaction Tooling Experience LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 16

LM 02 Reaction Tooling Experience • • Data used to gain confidence in Ansys

LM 02 Reaction Tooling Experience • • Data used to gain confidence in Ansys analysis Magnet test will provide additional information on coil strain LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 17

LM plans • Test 4 m mirror dipole magnet by end of Oct. •

LM plans • Test 4 m mirror dipole magnet by end of Oct. • Investigate maximum coil strain. • Determine cause of reaction tooling bow after heat treatment. » Does it cause degradation? • Determine impact of tooling bow on LQ coils. LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 18

LM Conclusions • The scale up of the 1 m dipole mirrors to 2

LM Conclusions • The scale up of the 1 m dipole mirrors to 2 m using PIT strand was successfully demonstrated. • The 4 m (RRP) mirror magnet is about to be tested and will provide valuable information on coil degradation due to deflection. • Feasibility of coil handling and subassembly handling is demonstrated with the long dipole mirror. LARP Collab. Meeting – SLAC, Oct. 17 -19, 2007 LQ & LM Status & Plan for FY 08 – Fred Nobrega 19