BGC Integration with HEL Giannis Papazoglou Gerhard Schneider
BGC Integration with HEL Giannis Papazoglou, Gerhard Schneider logo area CERN, Geneva, October 2020
BGC Space Reservation BGC space reservation logo area Giannis Papazoglou, BGC - Gas injection Integration 2
Space constraints D = 84 + 25 mm bakeout reservation D = 84 mm 815 mm B 2 D = 84 mm 420 mm B 1 200 mm Transpo rtation Volume 720 mm 250 mm 1091 mm QLR D = 650 mm logo area Giannis Papazoglou, BGC – HEL Integration 3
HEL Test stand BGC logo area Giannis Papazoglou, BGC - Gas injection Integration 4
Current design clashing B 2 B 1 QRL logo area Giannis Papazoglou, BGC – HEL Integration 5
Concept 1 187 mm Modified Gas injection 410 mm QLR logo area 305 mm B 1 B 2 Giannis Papazoglou, BGC - Gas injection Integration 6
Issues logo area Giannis Papazoglou, BGC – HEL Integration 7
Conclusions § Assembly: the most critical point is how are we going to assemble it is not possible! § Camera system needs to be redesigned because it clashes. § Gas dump system seems to work well! § Gas injection: a lot of work needs to be done to fit it here especially if we need to move it closer to the IP. § Spacers positions: to be modified for better fit. logo area Giannis Papazoglou, BGC - Gas injection Integration 8
Thank you logo area Giannis Papazoglou, BGC - Gas injection Integration 9
- Slides: 9