BG CONSULTING ENGINEERS PRESENTATION TO CERN 15 10
BG CONSULTING ENGINEERS PRESENTATION TO CERN | 15. 10. 2020 PIERRE EPARS | PHILIPPE PONS | NIMA NILIPOUR | JÉRÉMY VOIRON www. bg-21. com BG Consulting Engineers A 222. 21/Voje INGENIOUS SOLUTIONS 11/03/2021 1
SUMMARY § § § § § General overview Our values Our strategic areas Offices Networked thinking Projects around the world Market development History Our projects BG Consulting Engineers A 222. 21/Voje 11/03/2021 2
GENERAL OVERVIEW § Founded in Switzerland in 1954 § Turnover 96. 9 MCHF in 2019 § 22 offices in Switzerland, France, Italy, Portugal and Algeria § Employee-owned § Projects around the world § Multidisciplinary project teams § Innovative solutions § Recognised engineering and consulting services in the areas of: § § Infrastructure Environment Building construction Energy BG Consulting Engineers A 222. 21/Voje 11/03/2021 3
OUR VALUES § § Creativity Reliability Team spirit Social and environmental awareness BG Consulting Engineers A 222. 21/Voje 11/03/2021 4
CHALLENGES OF THE FUTURE Population Living space Resources Environment Housing space Infrastructure Energy Mobility BG Consulting Engineers A 222. 21/Voje 11/03/2021 5
OUR FOUR STRATEGIC SECTORS Infrastructure Energy Environment BG Consulting Engineers A 222. 21/Voje Buildings 11/03/2021 6
SUPPORT THROUGHOUT THE LIFE CYCLE A BROAD RANGE OF SERVICES – A SINGLE POINT OF CONTACT As a multidisciplinary consulting firm, BG can assist its clients in defining their requirements, through design and construction to commissioning and operation of each project. BG Consulting Engineers A 222. 21/Voje 11/03/2021 7
OFFICES BG Consulting Engineers A 222. 21/Voje 11/03/2021 8
QUALIFIED EMPLOYEES – THE STRENGTH OF BG § Average number of employees in 2019: 640 § 367 employees in the French-speaking part of Switzerland § 89 employees in the German-speaking part of Switzerland § 184 employees in France § 60% engineers § 7% trainees § § § 30 nationalities 28% women Average age: 40 years BG Consulting Engineers A 222. 21/Voje 11/03/2021 9
PROJECTS AROUND THE WORLD BG Consulting Engineers A 222. 21/Voje 11/03/2021 10
THE BG GROUP IN SWITZERLAND BG Consulting Engineers A 222. 21/Voje 11/03/2021 11
MARKET SEGMENTATION 4. 30% French part of Switzerland 34. 23% 48. 15% German part of Switzerland France Others 13. 31% 2017 BG Consulting Engineers A 222. 21/Voje 11/03/2021 12
TURNOVER 2019 Turnover in M EUR Turnover in M CHF 100 90 80 70 60 50 40 30 20 10 0 79. 8 84. 6 83. 6 85. 7 87. 2 90. 3 89. 9 93. 5 91. 2 96. 9 59. 4 44. 2 50. 4 20062007200820092010201120122013201420152016201720182019 BG Consulting Engineers A 222. 21/Voje 100 90 80 70 60 50 40 30 20 10 0 60. 6 65. 3 71. 4 72. 6 75. 2 81. 7 85 82. 9 85. 2 86. 5 53. 2 29. 5 33. 6 38. 2 20062007200820092010201120122013201420152016201720182019 11/03/2021 13
Number of employees 1954 – 2019: DEVELOPMENT OF THE COMPANY 11/03/2021 BG Consulting Engineers A 222. 21/Voje 14 15
ORGANIZATION CHART BG Consulting Engineers A 222. 21/Voje 11/03/2021 15
EXECUTIVE BOARD Pierre Epars, CEO Roselyne Loeb, DRH Philippe Pons, Directeur Infrastructures & Transport (DI) Anne-Claire Pliska, Directrice du Développement et de l'Innovation BG Consulting Engineers A 222. 21/Voje Henriette Haas-Brutus, CFO / COO Gilles Pirat, Directeur Bâtiment & Energie (DB) Alexis Pourprix, Directeur du domaine Eau & Environnement (DE) Sylvain Riss, Directeur Numérique et BIM 11/03/2021 16
BOARD OF DIRECTORS Daniel Crausaz Alain Guttmann, Chairman BG Consulting Engineers A 222. 21/Voje Martin Wickenhäuser Nicolas Rist 11/03/2021 17
OUR PROJECTS BG Consulting Engineers A 222. 21/Voje 11/03/2021 18
LOETSCHBERG BASE TUNNEL (CH) § § Construction of an alpine rail link § A provisional phase of the works was commissioned in 2007 with the works only being partially completed § On behalf of the BLS railway company, a group of engineering firms, including BG, developed the scheme design in order to calculate the completion costs. The consortium is also in charge of the studies, the construction management and supervision of the future development of the tunnel. BG was involved at every step: § Design and construction management of civil engineering works and railway equipment § Project management BG Consulting Engineers A 222. 21/Voje 11/03/2021 Client: BLS Alp. Transit AG Time frame: 1998 – in progress 19
©TELT LYON – TURIN (F/IT) § BG has been involved in the Lyon–Turin Transalpine high-speed railway venture since the very beginning. § After having managed and coordinated for nearly 10 years the studies for the elaboration of a Reference Project finalized for the entire international section, BG, with its partners from the GEIE ALLTI consortium, is in charge of the project management of the base tunnel between the foot of the Villarodin-Bourget/Modane ramp and Italy. § The mandate covers project studies, the production of company consultation documents, assistance with the works contract and the management of the works and their acceptance. BG Consulting Engineers A 222. 21/Voje 11/03/2021 Client: Tunnel Euralpin Lyon-Turin (TELT) Time frame: 2009 – in progress 20
Saint-Denis Pleyel © Société du Grand Paris - Agence Kengo Kuma & associates 2 GRAND PARIS EXPRESS (F) Many tunnel boring machines are simultaneously excavating below the Paris suburbs installing 200 km of new driverless metro lines. BG covers: § General assistance to the project owner of lines 15 South, 16 and 17: project management, optimization and coordination, administrative management § Assistance to the geotechnical project owner for lines 14 South and a section of line 15 South Client: Société du Grand Paris Time frame: 2013 – 2030 BG Consulting Engineers A 222. 21/Voje 11/03/2021 21
GRAND PARIS EXPRESS (F) § Spoil Management § Geological and geotechnical analysis § Spoil management of polluted materials § Production of models of materials management § Multi-criteria analysis | optimizing transport Client: Société du Grand Paris Time frame: 2014 -2015 BG Consulting Engineers A 222. 21/Voje 11/03/2021 22
NANT DE DRANCE (CH) § Construction of a 900 -MW underground pumpedstorage scheme between the Emosson and Vieux-Emosson reservoirs § BG's role in the project: § § § Tender phase § Fire safety concept and HVAC (Heating, ventilation and air conditioning) § Assistance for the geological investigations Detail design of the main caverns (excavation, support system and powerhouse concrete structure) Client: Nant de Drance SA Time frame: 2008 – 2020 Site supervision and as-built drawings BG Consulting Engineers A 222. 21/Voje 11/03/2021 23
© CEVA: CORNAVIN – EAUXVIVES – ANNEMASSE (CH/F) § CEVA is a 16. 5 -km rail line (including 6. 5 km underground) that aims to connect the French and Swiss railway links. § There are seven stations and open-air or underground stops along the route. Heating, ventilation and air condition, sanitary and electrical equipment as well as fire ventilation for these was handled by BG. § As part of a consortium, BG constructed also a 2 km tunnel section, including a two-track tunnel, a cut-and-cover tunnel and a new underground station (Carouge-Bachet). BG Consulting Engineers A 222. 21/Voje 11/03/2021 24 Client: DCTI État de Genève/ CFF Project studies: 2003 – 2011 Time frame: 2012 – 2019
GENEVA-CORNAVIN MAIN TRAIN STATION (CH) § § Capacity increase/expansion of the station The project aims to enable the: § Continuation of rail operations throughout with a limited surface level impact while including provisions for future extensions The mission of BG includes: § Preliminary studies of the entire project to extend the Geneva railway node, § lead of the JV for architectural studies, civil engineering, BIM Coordination, HVAC and site supervision in the central sector BG Consulting Engineers A 222. 21/Voje 11/03/2021 Client: CFF Time frame: 2017 -2030 25
© CEVA GENEVA EASTERN BYPASS | LAKE GENEVA CROSSING (CH) § According to alternative 3 (c), the project provides for a 2 x 2 lane motorway with the Chêne-Bougeries tunnel, the Frontenex tunnel, and the immersed tunnel, which crosses the lake between Belle Fontaine and Le Vengeron § Preliminary studies: Method & Civil Engineering, safety and impact studies) of the immersed tube tunnel solution § Ventilation: estimation of ventilation requirements, ventilation system and construction provisions § Safety concept, constructional provisions, emergency access, traffic management concept BG Consulting Engineers A 222. 21/Voje 11/03/2021 26 Client: DCTI État de Genève Project studies: 2009 – 2010
© CEVA NETTUN PROJECT NEW TECHNOLOGIES FOR TUNNELING AND UNDERGROUND WORKS § Risk Assessment & Monte-Carlo Method § Management of construction time and cost effectiveness by implementation of the DAT software § Decision support tools formatted specifically for tunnel projects § Justification for recognition work § Choice of realization methods § Budgetary choices (provision for risks) BG Consulting Engineers A 222. 21/Voje 11/03/2021 27
© CEVA CERN LHC POINT 1 (CH) CERN HL-LHC POINT 1 (CH) FRANÇOIS LAIGLE (EDF CIH) § LHC Point 1 | Design Phase § HL-LHC Point 1 | Design Phase § Geological and Geotechnical Expert § Design of the UX 15 Cavern | ATLAS § Design of the USA 15 Cavern § Numerous Publications BG Consulting Engineers A 222. 21/Voje 11/03/2021 Client: CERN Time frame: 1999 – 2001 Time frame: 2016 – 2018 28
© CEVA CERN LHC POINT 1 (CH) EMMANUEL RIGAUD (BEC TRAVAUX SOUTERRAINS | PERFOREX) § LHC Lot 2 | Construction Phase § Construction Site Manager § Expert Engineer § Completion of Shafts and underground Caverns of LHC Lot 2 Client: CERN Time frame: 1999 – 2001 BG Consulting Engineers A 222. 21/Voje 11/03/2021 29
© CEVA CERN LHC POINT 1 (CH) HERVÉ DÉTRAZ (BG CONSULTING ENGINEERS) § LHC Point 1 | Construction Phase § Geological and Geotechnical Engineer § Geological monitoring of UX 15 Cavern | ATLAS Cavern § Geological monitoring of USA 15 Cavern Client: IMPLENIA Time frame: 1999 – 2001 BG Consulting Engineers A 222. 21/Voje 11/03/2021 30
© CEVA CERN HL-LHC POINT 1 (CH) JÉRÉMY VOIRON (SETEC CH) § HL-LHC Point 1 | Construction Phase § HL-LHC Point 1 | Design Phase § Geological and Geotechnical Engineer § Management of expected polluted materials § Technical referent in charge of the management of numerous optimizations § Design of the US/UW 17 Cavern, and connexions with adjacent tunnels and shaft § Establishment of the specifications § Establishment of the Geotechnical Baseline Report (GBR) BG Consulting Engineers A 222. 21/Voje 11/03/2021 31 Client: CERN Time frame: 2016 – 2020
BIM – BUILDING INFORMATION MODELLING A CORE COMPETENCE OF BG BG Consulting Engineers A 222. 21/Voje 11/03/2021 32