Barrel Orsay The barrel design is done in
Barrel @ Orsay The barrel design is done in close collaboration with Giessen, GSI, Protvino and KVI groups Thanks to the Bochum and Helmotz institute Mainz Unité mixte de recherche CNRS-IN 2 P 3 Université Paris-Sud 11 91406 Orsay cedex Tél. : +33 1 69 15 73 40 Fax : +33 1 69 15 64 70 http: //ipnweb. in 2 p 3. fr Rosier Ph. – IPNO – Detector Dpt. – 12/01/2012 1/8 ORSAY - PA NDA meeting
Crystal production From the definition of the barrel crystals @ IPN Orsay in january 2008, Crystals mass production started for 1994 / 11360 crystals and now it is on stand-by Pre-mounting of one row of a slice to check the good arrangement Rosier Ph. – IPNO – Detector Dpt. – 12/01/2012 2/8 ORSAY - PA NDA meeting
Read-out with front-end electronics The APFEL asic is now correctly integrate in order to minimize the heat load on the crystals Rosier Ph. – IPNO – Detector Dpt. – 12/01/2012 3/8 ORSAY - PA NDA meeting
Alveoles production @ protvino and measured @ Orsay FIRST ALVEOLES PRODUCED before summer by Protvino => 3 D measuring performed with Protvino and Orsay => results under discussion Rosier Ph. – IPNO – Detector Dpt. – 12/01/2012 4/8 ORSAY - PA NDA meeting
Gluing test with Dow corning 3145 (CMS glue) Loading test to measure the breaking force Use of the Giessen facility for optical transmission test under irradiation test Test @ -30°C @ Orsay to be performed Rosier Ph. – IPNO – Detector Dpt. – 12/01/2012 5/8 ORSAY - PA NDA meeting
120 crystals prototype to be mounted in autumn 2012 Rosier Ph. – IPNO – Detector Dpt. – 12/01/2012 6/8 ORSAY - PA NDA meeting
Cooling for the EMC barrel In 2010 -2011 – definition of a cooling proposal In 2012, test of the pressure drop over a long distance (40 m) Writing of machinery specifications to contact an industrial and get a quote for a cooling demonstrator made in 2013 -2014 ? Rosier Ph. – IPNO – Detector Dpt. – 12/01/2012 7/8 ORSAY - PA NDA meeting
Next jobs for 2012 -2013 towards 2014 … Studies on the light injection in front of crystals for calibration Cooling machinery Detailed CAD for the support beam, barrel support and services (only TDR shapes) Barrel assembly procedure Two goals for 2014 : 1 - Provide a cooling machine for Juelich test 2 - Build a slice prototype as the first set of the barrel mass production. Rosier Ph. – IPNO – Detector Dpt. – 12/01/2012 8/8 ORSAY - PA NDA meeting