B 904 Status 2009 08 18 B 904
B 904 Status 2009 -08 -18 • B 904 – Debug and repair area for Hardware – Testing area for hardware & firmware – Testing area for Software – Certification area for ALL upgrades • Status of B 904 – Off chamber board storage - OK – Repair station – Materials for shipping tobe-repaired boards • ESSC mtg on Future Use of B 904 – Wednesday • Prior to the meeting please make sure that the planned rack configuration of in particular the Integration racks (E 1 A 01 to E 1 A 15) is entered before the meeting if at all possible. One should assume that a well sized DAQ system is installed and possible to use. The goal of the exercise is to determine exactly how large the daq system need to be in terms of number of active FEDs, etc. in order to make a consistent plan, including resources, for the refurbishment of the facility. The assignment of racks is proposed to change slightly: Every rack (subsystem) should house a TTC crate and an FRL crate. You can find an example of what I have in mind in rack E 1 A 05. • • See more about B 904 and Cosmic Test Stand from the web pages CMS Web > Muon. Wiki. Home > Muon. CSC > CSCCosmic. Slice https: //twiki. cern. ch/twiki/bin/view/CMS/CSCCosmic. Slice 1/30/2022 B 904 Status Report by Fred B. 1
CTS Status 2009 -08 -18 • • Status of CTS – All Hardware Installed – Gas and HV working – All computers working except – • NFS installed • update on emuslice 12: – PCrate VME driver installed and tested: communication with PCrate OK – CAEN driver installed: not tested – TTC software installed: not tested – All online software installed – except • DAQ, DQM, TF – not tested after move to NFS Future – Work on B 904 with Pt 5 highest priority through end of CRAFT – Sept – End of CRAFT – put B 904 commissioning to highest priority 1/30/2022 B 904 Status Report by Fred B. 2
- Slides: 2