Availability April May Run 14 last week availability
Availability April- May Run 14 last week availability 89% previous week 80% 168 24 144 120 14 15 11 23 2 14 20 12 16 1 168 20 14 14 9 13 120 14 8 31 12 15 8 10 18 17 13 10 10 96 72 115 109 123 111 24 HOURS 144 20 8 96 48 14 72 119 48 113 101 118 24 0 0 FY 14 -week 27: 28: 29: 30: FY 14 -week 31: 32: 33:
INTEGRATED FAILURES (GREATER THAN ONE HOUR) BY SYSTEM -- MAY 2014 Human Error MD – current too high trained a Dx magnet ES&FD_At. R Warc 20 & wp 2 cooling faults Rf_RHIC Could not turn on Landau cavities Quench Protection Y 9 -QPSW – shorted capacitor PPS_RHIC 2 x Y abort kicker pre-fire 0. 018 0. 016 0. 014 0. 012 0. 01 0. 008 0. 006 0. 004 0. 002 0 < m su hr 1 R S_ PP HIC G_ AC IC RH i r pe s Ex nt e m o r nt Co d. R H ls ll IC a. H e. B Ic c en e Qu rot h. P cct en e Qu ect h. D Hct _R PS IC HI _R Rf C D &F ES t. R _A G _A PS S an m r Hu rro E 0 4/ 0 2 5/ 0 9/ 0 5/ 0 1 6/ 1 5/ 4/ 1 3/ 2 2 4/ 1 0/ to 2 4/ 1 0 to 2 4/ 5/ 0 to 2 0 5/ 0 to 6/ 1 5/ 0 1 3/ 2 5/ 4/ 1 0/ 2 1 4/ 1 7/ 1 4/ 1
Run 14 availability 100% 90% 80% 70% 60% 50% 05/20/14/2 to 05/27/14/1 05/13/14/2 to 05/20/14/1 05/06/14/2 to 05/13/14/1 04/29/14/2 to 05/06/14/1 04/22/14 to 04/29/14/1 04/15/14 to 04/22/14/1 04/08/14/2 to 04/15/14/1 04/01/14/2 to 04/08/14/1 03/25/14/2 to 04/01/14/1 03/18/14/2 to 03/25/14/1 03/11/14/2 to 03/18/14/1 03/04/14/2 to 03/11/14/1 02/25/14/2 to 03/04/14/1 02/18/14/2 to 02/25/14/1 02/11/14/2 to 02/18/14/1 02/04/14/2 to 02/11/14/1 01/28/14/2 to 02/04/14/1 40%
- Slides: 3