ATLAS Setting the Scene Fred ATLAS Hardware Calibration
ATLAS: Setting the Scene Fred
ATLAS Hardware Calibration Production Assembly Ray Mag Field Steve S» Reception Testing Jo Alignment Paul M Installation Testing Paul B»
SCT Endcap Module Alignments From Survey Data • Extensive survey data available for SCT endcap modules and discs Module data Disc data
SCT Endcap Module Alignments From Survey Data • Combined the survey data to produce module-on-disc alignments • Results to be used to improve performance of track reconstruction
ATLAS Hardware Calibration Trigger Production Assembly Ray Mag Field L 1/HLT Steve S» Thorsten» Alignment Paul M Top Trigger Thorsten Simon» Un-Ki» , Fred Monitoring Joe» , Paul M Mike/Chris James» Couplings Reception Testing Jo Installation Testing Paul B» Physics Ph. Ds Sarah (Irina) ((Pilko)) Top Christian» Simon, Jenna Paul B SM Networks Steve S, Jiri James Richard» Diffractive FP 420 Mob
• Attempting to understand the ATLAS software by plotting things from the top group’s common ntuples. • Used the default LVL 1 trigger information to look for electrons by plotting the number of ecal ROIs for each event.
• Then made further requirements: 1. The ROI had E > 20 Ge. V. 2. The energy in the surrounding ecal trigger towers is < 3 Ge. V. 3. The energy in the hdcal core and isolation trigger towers is <2 Ge. V. • • 2 and 3 ensure that the ROI represents an isolated particle. The results compare well with the number of electrons from truth.
ATLAS s. LHC s. SCT • 2015: End of life of inner detector Increase in luminosity (x 10) s. LHC So. I • 2007: Start of 3 -year R&D for SCT Radiation hard detector Thermal/Mech engineering Integrated cooling Opto-electronics Readout (x 10 channels) 22 SY/year £ 650 k/year • 2009: s. LHC decision Trigger upgrade proposal • 2010: Start of 5 -year build & install SCT 65 SY/year (Manchester 2 -3/year) £ 27 M overall Manchester on No fte’s Proposal Dec 2006 Manchester R&D 2007 -09 Prod/Install 2010 -2015
ATLAS s. LHC s. SCT Pixel B-Layer So. I Steve W Cinzia Manchester on No fte’s Proposal Dec 2006 Manchester R&D 2007 -09 Prod/Install 2010 -2015 3 D silicon Replace? 2012 Upgrade 2015 FP 420