Assessing Trade Development Needs and Integrating them into

  • Slides: 14
Download presentation
Assessing Trade Development Needs and Integrating them into the Design of Development Strategies: Experiences

Assessing Trade Development Needs and Integrating them into the Design of Development Strategies: Experiences from East and Southern Africa Symposium on Evaluation Identifying Indicators for Monitoring Aid for Trade WTO, Geneva 15 -16 September 2008 Mark Pearson RTFP Programme Director

Poverty Alleviation through Economic Growth Domestic Fiscal Policies Market Access: -DFQFMA for LDCs -Improved

Poverty Alleviation through Economic Growth Domestic Fiscal Policies Market Access: -DFQFMA for LDCs -Improved Rules of Origin -Preference Margins -etc Increased levels of Trade Financial Policies Removal of Production and Competitive Constraints: -Aid for Trade -Foreign Direct Investment -Regulatory Environment -etc

Aid for Trade Policy and Regulation § Trade facilitation and regulation § TA/CB §

Aid for Trade Policy and Regulation § Trade facilitation and regulation § TA/CB § RTAs/FTAs/CU Building Productive Capacity §Expansion of productive base §Level of investment Trade Development § Trade Facilitation § Investment Promotion § Trade Financing, … Trade Related Adjustment § changes in structure of trade Trade Related Infrastructure § transit/transport §Energy §ICT

What to Monitor and Evaluate at the Programme or Project Level? Sequencing: It is

What to Monitor and Evaluate at the Programme or Project Level? Sequencing: It is not enough to monitor spending, or rates of return or efficiency gains on individual projects – there is a need to monitor the sequencing of interventions.

Lack of rolling stock and poor management on TAZARA delays in transport – One

Lack of rolling stock and poor management on TAZARA delays in transport – One train load of copper cathods is valued at about US$10. 5 m (50 tonnes per wagon, US$7, 000/t, 30 wagons in a train). Lost income at 8% pa interest is about US$16, 000/week/train.

Container terminal congestion at Dar es Salaam. Improved efficiencies on the road/rail transport network

Container terminal congestion at Dar es Salaam. Improved efficiencies on the road/rail transport network will add to this bottleneck

SENA line from Moatize (estimated deposit of 2. 4 billion tonnes of coal) to

SENA line from Moatize (estimated deposit of 2. 4 billion tonnes of coal) to Beira upgraded to transport coal but Beira port needs dredging and line into Malawi not repaired

Improving customs procedures at Kasumbalesa ON ITS OWN will not reduce transport times and

Improving customs procedures at Kasumbalesa ON ITS OWN will not reduce transport times and costs to an from Kolwezi – approximately 100 loaded trucks a day go south and 300 loaded trucks a day go north.

The absolute Importance of Correct Sequencing Start of journey Toll Bridge US$3 m One-Stop

The absolute Importance of Correct Sequencing Start of journey Toll Bridge US$3 m One-Stop Border Post – buildings, computers, etc US$10 m Ring Road – US$1 m/km OSBP Road rehabilitation – 50 mm surface overlay – US$750, 000/km Road construction – US$1 m/km Port Upgrade – Dredging, New container terminal, management system. – US$30 m Trade Facilitation and Trade Regulation Measures

The absolute Importance of Correct Sequencing Start of journey Toll Bridge US$3 m One-Stop

The absolute Importance of Correct Sequencing Start of journey Toll Bridge US$3 m One-Stop Border Post – buildings, computers, etc US$10 m Ring Road – US$1 m/km OSBP Road rehabilitation – 50 mm surface overlay – US$750, 000/km ROAD NOT FIXED – NO WAY TO PORT Port Upgrade – Dredging, New container terminal, management system. – US$30 m Trade Facilitation and Trade Regulation Measures

What to Monitor and Evaluate at the Programme or Project Level? Inter-Relations: What effects

What to Monitor and Evaluate at the Programme or Project Level? Inter-Relations: What effects improvements in one sector have on another – for example, deregulation of the road sector without an effective regulatory environment and equivalent deregulation on the railways will not lead to more efficient transport and transit networks in the medium to longer term. The regional axle load limit is one of the highest in the world (56 t for 7 axle rig) and overloading makes road transporters more competitive and profitable. Road transport accounts for almost all transport – even bulk transport of concentrates, fuel, sulphuric acid, etc.

Programme-level Monitoring and Evaluation Aid Amounts disbursed by Af. T category by Donor by

Programme-level Monitoring and Evaluation Aid Amounts disbursed by Af. T category by Donor by procedure (are Effectiveness there adequate regional mechanisms in place for disbursement? ) Trade Policy and Regulation - Effects of trade facilitation and trade regulation measures on reduced journey times and transport prices - Level of increases in TA/CB - Increases in implementation of FTAs, RTAs, customs unions. Trade Measuring changes in investment promotion, trade financing, Development export business support services, institutional support to exporters. Building Productive Capacity - Changes in the productive base of the economy – broadening of production. - Levels of investment Trade Related Infrastructure - Sequencing of trade related infrastructure interventions - Rates of return on investments in transit/transport corridor infrastructure upgrades, energy infrastructure, ICT, etc Trade Related Adjustment - Changes in the structure of trade – measurement of diversification - Changes in levels of Trade in Services

Way Forward: - Identification of projects and programmes that are necessary to make the

Way Forward: - Identification of projects and programmes that are necessary to make the N-S corridor more efficient with the aim of reducing costs and so allowing producers to be more efficient. - Calculate costs of projects and returns on investment. - Prepare a funding strategy for each project and programme (ring-fence using SPVs) so that they can be implemented in a sequenced manner. - Hold a “Aid for Trade” session in first quarter of 2009 to get funding of each project/programme. - Roll out to other corridors.

Thank You Regional Trade Facilitation Programme (DFID) PO Box 317 Persequor Park Pretoria 0020