ASAS Thematic Network II First Workshop Savoy Hotel

  • Slides: 10
Download presentation
ASAS Thematic Network II First Workshop Savoy Hotel, Malmö

ASAS Thematic Network II First Workshop Savoy Hotel, Malmö

Summary of discussions • • Progress DG TREN message Key issues Next workshop

Summary of discussions • • Progress DG TREN message Key issues Next workshop

Progress • Standards • Major manufacturers • Simulations, trials & demonstrations

Progress • Standards • Major manufacturers • Simulations, trials & demonstrations

DG TREN message • EC remains committed to ASAS • Position ASAS into SESAME

DG TREN message • EC remains committed to ASAS • Position ASAS into SESAME Master plan. • Need to show benefit to achieve implementation – area for focus?

Key issues (1) • ASAS is not stand alone - an integrated part of

Key issues (1) • ASAS is not stand alone - an integrated part of the ATM system • The RFG process feeding into RTCA/EUROCAE and then into ICAO is happening • Work from NUP & other programmes needs to be updated to reflect RFG outputs • Validation: an integrated ATM element. • SESAME should take into account RFG outputs.

Key issues (2) • An ADS-B-OUT rich environment therefore: - NRA in Scandinavia, Ireland,

Key issues (2) • An ADS-B-OUT rich environment therefore: - NRA in Scandinavia, Ireland, Spain-Canaries and Mediterranean region should be operational as soon as possible. - ADS-B-IN in Pacific, in Atlantic - TMA • Cost benefit studies should be used to drive common equipage • Working towards implementation decision making

Key issues (3) • Coherence needs to be achieved between the Airbus/Boeing common view

Key issues (3) • Coherence needs to be achieved between the Airbus/Boeing common view & road map, and current ASAS work • ATSAW: Situation Awareness is not an end in itself, the information must be directed at specific tasks • Keep it simple AND make it work for the human operators • Packages 2 & 3 coordinated research programme now!!

Workshop report development • • • TN 2 first report draft Available to attendees

Workshop report development • • • TN 2 first report draft Available to attendees 14 th October Attendee comments by 28 th October Final report 18 th November Available with slides on www. asas-tn. org

Date of next workshop Roma, 3 -5 April 2006

Date of next workshop Roma, 3 -5 April 2006

Thank you • • • European Commission LFV Aerotech. Telub The ASAS TN 2

Thank you • • • European Commission LFV Aerotech. Telub The ASAS TN 2 Team The Savoy hotel