ARLINGTON WATER UTILITIES CAPITAL PROGRAM UPDATE Brad Franklin
ARLINGTON WATER UTILITIES CAPITAL PROGRAM UPDATE Brad Franklin, P. E. Arlington Water Utilities Assistant Director
ARLINGTON WATER CIP GOALS § Maximize useful life of assets § Intelligent spending (Actionable Data) § Efficient spending § Avoid major unplanned repairs
TREATMENT INFRASTRUCTURE STATUS § Treatment Capacity 172. 5 MGD § Projected Build-Out Peak Demand 133. 4 MGD § 2011 Drought Peak Day 115 MGD § Infrastructure Age - Average 30 Years
TREATMENT CIP § § § No plant expansions needed Focus is Rehabilitation and Optimization Third-Party Water Sales Initiative DWG Interconnect – Activated 2016 q Bethesda – Activation Late 2018 q Kennedale – Council Presentation April 2018 q ü q Estimated Activation 2018 Pantego Emergency Interconnect/Water Sale Contract – Council Presentation April 2018
WATER UTILITIES 3 YEAR CIP 3 Year Total = $214 M $ 90 $ 80 Water Treatment 3 YR = $130 M millions $ 70 $ 60 $ 50 $73 $ 40 $ 30 $ 20 $29 $27 $ 10 $2018 2019 2020 Pipeline 3 YR = $66 M Other
PB WATER TREATMENT PLANT 75 MGD – LAKE ARLINGTON RECYLC E BASINS ADMIN FLOC/SE D BASINS CLEARWE LL NORTH PLANT FILTERS OZONE LAB CHEMIC AL
PB WATER TREATMENT PLANT 75 MGD LAB Electrical FLOC/SE D BASINS FILTERS ADMIN OZONE Pump Station NORTH PLANT Clearwells Chemical Recycle Basin • HDR Engineering • Scoping/Fee Phase • Cost = $73 M
JK WATER TREATMENT PLANT 97. 5 MGD – TRWD PIPELINE
JK WATER TREATMENT PLANT 97. 5 MGD Lab & Maintenance Facility • Request For Qualifications • Cost = $10 M LAB & MAINTENANCE
JK WATER TREATMENT PLANT 97. 5 MGD Chemical Improvements • Request For Qualifications • Cost = $8 M LAB & MAINTENANCE
LAKE ARLINGTON RAW WATER PUMP STATION 60” RW to TRA WTP 60” RW to COA WTP
LAKE ARLINGTON RAW WATER PUMP STATION • Joint project with TRA • Upgrade/Rehab • Design RFQ 2018/2019 • Cost = $23 M 60” RW to TRA WTP 60” RW to COA WTP
PIPELINE INFRASTRUCTURE STATUS § § § Arlington Water System q 1, 400 miles q 6 -inch to 54 -inch in diameter Arlington Sanitary Sewer System q 1, 200 miles q 6 -inch to 72 -inch Infrastructure Age - 28 Years
PIPELINE CIP § § Masterplan results - Minimal Capacity Issues Age rarely correlates with condition Failure of large mains bring about large consequences Focus is Rehabilitation and Optimization
WATER UTILITIES 3 YEAR CIP 3 Year Total = $214 M $ 90 $12 $ 80 Water Treatment 3 YR = $130 M millions $ 70 $ 60 $ 50 $27 Pipeline 3 YR = $66 M $27 $ 40 Other $ 30 $ 20 $ 10 $2018 2019 2020
What you don’t know can hurt you
2015 SANITARY SEWER FAILURE § § § Installed in 1983 66 -inch RCP Sanitary Sewer Repair Cost $138, 000
SANITARY SEWER CONDITION ASSESSMENT § § Multi-Sensor Inspection Platforms HD CCTV Camera Laser Ring Profiler Sonar 2 D Laser Profiler Sonar HD CCTV Camera
SANITARY SEWER CONDITION ASSESSMENT § § § 47 miles inspected 24 -inch to 72 -inch 2 projects fast tracked to design
2015 WATER MAIN FAILURE § § § Installed in 1982 42 -inch C 301 Water Main Repair Cost $718, 000
WATER MAIN CONDITION ASSESSMENT
WATER MAIN CONDITION ASSESSMENT § § Water Research Foundation/EPA Study on PCCP (2012) q 96% of pipes are in good condition (no wire breaks) q Distressed pipe can still have a low risk of rupture for decades Arlington’s results consistent with study findings q 4 projects - 6. 9 miles inspected q 24 -inch to 60 -inch C 301 & C 303 q 1. 7% segments with wire breaks
WATER MAIN REPLACEMENT § 588 miles of “Asbestos Cement” pipe (42%) § 90% of main breaks occur on “AC” pipe § Overtime Costs are approximately $400 k/year § Current replacement rate is 8 miles/year § How to accelerate replacement without cost impact
WATER MAIN PIPE BURSTING § § Reduced construction time and customer disruption Independent of roadway replacement schedule Utilizes existing alignment – right-of-way preserved Reduced costs
WATER MAIN PIPE BURSTING Day 1 Installation HDPE Main Day 2 Restoration and cleanup
WATER MAIN PIPE BURSTING § § 3 rd party contractor q 20, 000 linear feet/year q Dual bid – open cut ($160/ft) vs. pipe bursting($128/ft) q $680 k cost savings/year In-house pipe replacement q Year 1 – 20, 000 linear feet q In-house cost ($56/ft) q $2. 1 M or $1. 4 M cost savings/year
RFQ / BIDDING OPPORTUNITIES § Engineering Services Annual RFQ (Nov/Dec) q Special RFQ q § RFQ/Bidding Information Supplier Portal Registration q Web: www. arlingtontx. gov/finance/purchasing q Email: purch@arlingtontx. gov q