ARGOS SYSTEM PRESENTATION CNES Responses to CLS User

  • Slides: 18
Download presentation
ARGOS SYSTEM PRESENTATION - CNES • Responses to CLS User survey • Synthesis of

ARGOS SYSTEM PRESENTATION - CNES • Responses to CLS User survey • Synthesis of NOAA User consultation • Anticipated Argos-4 needs • ARGOS-3 : • * System Heritage • * Commissioning • ARGOS-4 System : Preliminary Overview DBCP Workshop October 2006 ARGOS-4 CNES

RESPONSES TO CLS USER SURVEY DBCP Workshop October 2006 ARGOS-4 CNES

RESPONSES TO CLS USER SURVEY DBCP Workshop October 2006 ARGOS-4 CNES

SURVEY CONTEXT 1604 surveyed customers DBCP Workshop October 2006 238 replies Replies per application

SURVEY CONTEXT 1604 surveyed customers DBCP Workshop October 2006 238 replies Replies per application ARGOS-4 CNES

USER SATISFACTION Biologists Argos services GLOBAL Meteo/Ocean DBCP Workshop October 2006 Client support ARGOS-4

USER SATISFACTION Biologists Argos services GLOBAL Meteo/Ocean DBCP Workshop October 2006 Client support ARGOS-4 CNES

ARGOS SYSTEM METEO / OCEAN (1/2) Global Main users DBCP Workshop October 2006 Main

ARGOS SYSTEM METEO / OCEAN (1/2) Global Main users DBCP Workshop October 2006 Main users ARGOS-4 CNES

SYNTHESIS OF NOAA USER CONSULTATION DBCP Workshop October 2006 ARGOS-4 CNES

SYNTHESIS OF NOAA USER CONSULTATION DBCP Workshop October 2006 ARGOS-4 CNES

QUESTIONNAIRE • Argos DCS study report was issued on december 7, 2005 • Questionnaire

QUESTIONNAIRE • Argos DCS study report was issued on december 7, 2005 • Questionnaire was issued to 33 people • 20 responses received : – – – 5 ocean 11 biologists 4 DCP manufacturers DBCP Workshop October 2006 • • Distribution and Coverage • Link Reliability • Throughput • Geolocation • Portability • Future Tradeoffs § How many DCPs? Where? § § § How often transmit/receive to each DCP? Latency requirements? Direct read-out? § § Importance for transmit Importance for receive § How much data on each transmit / receive? Timeliness § § Use of Doppler geolocation Use of GPS § § Antenna size? Volume and mass? ARGOS-4 CNES

CONCLUSIONS • Survey responses indicate that next-generation of Argos DCS should focus on –

CONCLUSIONS • Survey responses indicate that next-generation of Argos DCS should focus on – Improving DCP transmit performance: increased data volumes with reduced size, mass and power – Improve Doppler geolocation to < 150 m with a target of <50 m • • An order-of-magnitude improvement in data volumes and cost would make Argos DCS attractive to a new class of users Argos system is not adapted to applications generating large amount of data per hour DBCP Workshop October 2006 ARGOS-4 CNES

ANTICIPATED ARGOS-4 NEEDS DBCP Workshop October 2006 ARGOS-4 CNES

ANTICIPATED ARGOS-4 NEEDS DBCP Workshop October 2006 ARGOS-4 CNES

NUMBER OF ACTIVE PLATFORMS IN THE SYSTEM Average growth > 12% per year DBCP

NUMBER OF ACTIVE PLATFORMS IN THE SYSTEM Average growth > 12% per year DBCP Workshop October 2006 ARGOS-4 CNES

NEED FOR ADDITIONAL CAPACITY Need for more than 15 Erlang capacity DBCP Workshop October

NEED FOR ADDITIONAL CAPACITY Need for more than 15 Erlang capacity DBCP Workshop October 2006 ARGOS-4 CNES

ARGOS USER NEEDS FOR ARGOS 4 • KEEP COMPATIBILITY WITH ARGOS-2 & ARGOS-3 PMTs

ARGOS USER NEEDS FOR ARGOS 4 • KEEP COMPATIBILITY WITH ARGOS-2 & ARGOS-3 PMTs • INCREASE AUTONOMY & REDUCE SIZE - Tx power drain decrease: factor 2 - Rx power drain : constant for increased capacity - Size & weight decrease : factor 2 • INCREASE DCP DENSITY: - Doubled number of platforms among which 25% are @ 4800 bps - Increase data volume transmission per pass : up to 100 kb per pass • IMPROVE LOCATION : 50 to 150 m • BETTER TIME RESPONSE : Average < 30 min • INCREASE DOWNLINK DATA VOLUME : > 1, 2 kbps DBCP Workshop October 2006 ARGOS-4 CNES

SATELLITE TRANSITION SCHEDULE DBCP Workshop October 2006 ARGOS-4 CNES

SATELLITE TRANSITION SCHEDULE DBCP Workshop October 2006 ARGOS-4 CNES

ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW (1/10) • BASIC SYSTEM CONSTELLATION - Reference constellation: NOAA-K, L,

ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW (1/10) • BASIC SYSTEM CONSTELLATION - Reference constellation: NOAA-K, L, M & N NPOESS-C 1, C 2 and METOP (3 main guaranteed orbits) * at equator Average time response (min) Maximum Hole per day (hours*) 55 2. 5 < MH < 4. 7 66 2. 9 <MH <3. 7 DBCP Workshop October 2006 ARGOS-4 CNES

ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW (2/10) • IMPROVEMENT IDEAS - Satellite orbit control NPOESS-C 1,

ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW (2/10) • IMPROVEMENT IDEAS - Satellite orbit control NPOESS-C 1, C 2 and METOP + 1 equatorial orbit satellite * at equator Average time response (min) Maximum Hole perday day(hours*) (hours) per 55 2. 5 < MH < 4. 7 66 2. 9 <MH <3. 7 30 1. 6 < MH < 1. 7 DBCP Workshop October 2006 ARGOS-4 CNES

ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW (3/10) • IMPROVEMENT IDEAS - Satellite orbit control NPOESS-C 1,

ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW (3/10) • IMPROVEMENT IDEAS - Satellite orbit control NPOESS-C 1, C 2 and METOP + 2 equatorial orbit satellites * at equator Average time response (min) Maximum Hole per day (hours*) 55 2. 5 < MH < 4. 7 66 2. 9 <MH <3. 7 30 1. 6 < MH < 1. 7 14 0. 7 < MH < 0. 8 DBCP Workshop October 2006 ARGOS-4 CNES

ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW ARGOS 3 Data throughput • STD + NG/400 bps: low

ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW ARGOS 3 Data throughput • STD + NG/400 bps: low power Tx • HD/4800 bps: 10 msgs - 50 kbits per pass Tx power: 5 W ARGOS 4 Data throughput Capacity: • STD + NG/400 bps: low power Tx • 12 processing units (3 HD) • HD/4800 bps: 30 msgs -140 kbits per pass • 110 k. Hz frequency bandwidth Tx power: 3 W Two-way link (400 bps) DBCP Workshop October 2006 Capacity: • 40 processing units (10 HD) • 400 k. Hz frequency bandwidth (TBC) • Processor speed x 30 Two-way link (3 x 400 bps TBC) ARGOS-4 CNES

ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW • ARGOS-4 PLANNING (TBC): - System study until spring of

ARGOS-4 SYSTEM: PRELIMINARY OVERVIEW • ARGOS-4 PLANNING (TBC): - System study until spring of 2007 Phase A study: until end of 2007 Phase B: beginning of 2008 First Flight Model provided in 2011 DBCP Workshop October 2006 ARGOS-4 CNES