API Standard 64 – Diverter Equipment Systems 2020 Winter Conference Update Chair: Marco Romero

API Standard 64 – Diverter Equipment Systems 2020 Winter Conference Update Chair: Marco Romero (marco. romero@dnvgl. com) Vice Chair: David Wallace (david. wallace@bhge. com) 1

Status of Document • RP 64 Diverter Equipment & Operations is withdrawn • S

Status of Document • RP 64 Diverter Equipment & Operations is withdrawn • S 64 3 rd Edition is published August 2017 • No monogram program • S 64 Errata 1 date of issue March 2018 • Removed fire testing requirements from flow selectors and actuators. • S 64 Addendum Re-ballot #2 passed on 8/29/2018 • Dec 2018 date of issue • 25 Affirmative to 1 Negative 1220 L Street, NW • Washington, DC 20005 -4070 • www. api. org 2

Addendum Highlights • Load rating evaluations specified • Section 9: Factory Acceptance Testing rewritten

Addendum Highlights • Load rating evaluations specified • Section 9: Factory Acceptance Testing rewritten • Reorganized • Function testing added • Section 12: Field Testing rewritten • Section 13: Testing Schedule added • Table 13 – Subsea/Surface Diverter Testing Schedule 1220 L Street, NW • Washington, DC 20005 -4070 • www. api. org 3

S 64 Path Forward • Q 1 Meeting scheduled • SRRR submitted to determine

S 64 Path Forward • Q 1 Meeting scheduled • SRRR submitted to determine the inclusion of diverter overshot packer, diverter overshot mandrel, and bell nipple system. • Currently awaiting feedback from industry usage through requests for interpretation 1220 L Street, NW • Washington, DC 20005 -4070 • www. api. org 4