API 17 Y Subsea chemical injection system RP
API 17 Y Subsea chemical injection system RP for Design, Testing & Operation Task Group Status June 23, 2015
Goals • Utilized by operating companies, vendors & design contractors • Form basis for design and operation of safe, reliable and fit for purpose chemical injection system • Taking into accounts past experiences
Status • Table of content developed and agreed on • A lead for each section is identified. • A writing group assisting the lead in developing each section has been formed. • A review team for each section is established. • Monthly progress report is conducted.
Task Group Name 1 Farah Saidi 2 Allison Novak 3 4 5 6 7 8 9 10 11 12 Andrew Grace Company BP Murphy Oil Intec. Sea Ann Davis Nalco-Champion Bob Long US water Service 13 14 15 Name Company Marcelo Ligeiro Petrobras Monte Goodner Muge Demiroglo 16 Roy Chan Christopher J Curran Ferhat M Erdal Cameron CVX Jake Hennig Oceaneering Jason Strouse Wood Group John Allen Karthik Annadorai BP BP BP 17 Sally Thomas David R. Simpson W Industries Intec. Sea Gates 18 19 Spiridon Ionescu Tomm Hermansen 20 Tom Lyons Conoco Philips Intec. Sea Oceaneering WGK 21 Tom Rogala Hunting-International 22 Wendell Love Emerson 23 Christy Lan BSEE
Proposed TOC 1. 2. 3. 4. Scope Normative References Terms, Definitions, Acronyms, and Symbols System Definitions & Requirements I. General II. Concept Development III. General Requirements IV. Functional Requirements V. Design Requirements VI. System Ownership 5. 6. Interfaces i. General ii. Engineering Disciplines Interface iii. Interface to Host Facility iv. Interface to Subsea Equipment v. Interface to Downhole Equipment vi. Interface to Workover Control System vii. Interface to Subsea Control and Monitoring Devices Surface Equipment i. General ii. General Requirements iii. Functional Requirements iv. Design Requirements
Proposed TOC 7. Subsea Equipment i. General ii. General Requirements iii. Functional Requirements iv. Design Requirements 8. Materials and fabrication i. General ii. Materials iii. Fabrication 9. Testing i. General ii. Qualification Testing iii. Factory Acceptance Tests (FATs) iv. Documentation 10. Commissioning, Startup & Decommissioning i. Installation ii. Commissioning iii. Startup iv. Operation v. Decommissioning 11. Maintenance, Field Modifications & Life Extension 12. Chemical Management i. Performance Verification ii. Surveillance iii. Control iv. Data archiving 13. Marking, Packaging, Storage and Shipping - i. Marking ii. Packaging iii. Storage and Shipping • Annex A Operation guidelines • Annex B Lesson learned/best practice
Lead/Assist/Review Team Section Title 1 2 3 Scope Normative References Terms, Definitions, Acronyms, and Symbols Writing Lead Assist Review Comments Develop later 4 System Definitions & Requirements F. Erdel ? S. Thomas, S. Ionescu Need members to assist in this section. 5 Interfaces R. Chan F. Erdel D. Simpson, S. Ionescu A. Novak for section 5. 4 6 Surface Equipment W. Love S. Thomas 7 Subsea Equipment A. Grace 8 Materials and fabrication A. Grace G. Monte, Bob Long, Bill Schneck J. Hennig, R. Chan, T. Rogala, W. Love D. Simpson, A. Novak, S. Ionescu J. Strouse, H. Hermansen, T. Lyons, T Rogala D. Simpson 9 Testing A. Grace J. Strouse, H. Hermansen, T Rogala D. Simpson, A. Novak 10 Commissioning, Startup & Decommissioning K. Annadorai F. Erdel D. Simpson 11 Maintenance, Field Modifications & Life Extension K. Annadorai C. Curran, J. Allen, J. Strouse S. Thomas 12 Chemical Management ? ? ? M. Demiroglu Paul is no longer avaialble. Need a new leader 13 Marking, Packaging, Storage and Shipping Develop later A. Davis, T. Lyons
- Slides: 7