API 16 WL January 2020 Well Intervention Well

  • Slides: 5
Download presentation
API 16 WL January 2020 Well Intervention Well Control SC 16 Task Group –

API 16 WL January 2020 Well Intervention Well Control SC 16 Task Group – 5 Chairman – Alex Sas-Jaworsky PE Vice-Chairman – James Mc. Allister (16 WL) Secretary – Christopher Walker (16 WL) 2020 API E&P Winter Conference Update 1

API 16 WL January 2020 API RP 16 WL “Wireline Wellhead Pressure Control Equipment

API 16 WL January 2020 API RP 16 WL “Wireline Wellhead Pressure Control Equipment and Systems” API Recommended Practice 16 WL to Provide Industry Guidance on the Preparation, Rig-Up, Implementation, and Operation of Pressure Control Equipment Used in “Cased Wellbore” Wireline Well Intervention Applications. 1220 L Street, NW • Washington, DC 20005 -4070 • www. api. org 2

API 16 WL January 2020 2019 RP 16 WL Development Activities SRRR Approved August

API 16 WL January 2020 2019 RP 16 WL Development Activities SRRR Approved August 5, 2019 Assembled team of 73 individuals representing • 9 Operators • 4 Wireline Service Providers • 5 Pressure Control Equipment Providers • 4 Equipment and Wireline Manufacturers • 5 Engineering Consultants 1220 L Street, NW • Washington, DC 20005 -4070 • www. api. org 3

API 16 WL January 2020 RP 16 WL Continuing Activities SC 16 TG-5 Created

API 16 WL January 2020 RP 16 WL Continuing Activities SC 16 TG-5 Created WL Leadership Team • Developed Strawman RP 16 WL Document Structure Based on RP 16 ST • Identified Required Sections and Established Tentative Scope of Deliverables for Each • RP 16 WL Work Group to Also Interface With API SC 6 and SC 8 (TG-4) and Related SC 16 TG’s to Ensure That Standards are Consistent • 1220 L Street, NW • Washington, DC 20005 -4070 • www. api. org 4

API 16 WL January 2020 RP 16 WL Continuing Activities Membership Assigned to Targeted

API 16 WL January 2020 RP 16 WL Continuing Activities Membership Assigned to Targeted Work Groups to Develop the Following Sections: Ø Wireline Pressure Control Equipment (PCE) Ø Wireline Job Planning Requirements Ø PCE Performance Expectations & Readiness Ø Job Descriptions, Roles, and Responsibilities Ø Wireline PCE & Support Equipment Rig Up Ø Guidelines for Pressure Control Operations 1220 L Street, NW • Washington, DC 20005 -4070 • www. api. org 5