Anglo French Collaboration Retreat Station de Biologique de
Anglo French Collaboration Retreat Station de Biologique de Roscoff 25 – 27 October 2010
43 Delegates ( 19 French & 24 English) 14 Companies (7 French & 7 English) 19 Academics (from 5 Institutions) 2 Presentation, 2 Sound-bites 1 Poster Session, 5 Group Working Sessions 67 Ideas in an Hour And…………………. 6 Projects!! (and 1 Gorilla)
WHY?
Here is Edward Bear, coming downstairs now, bump, bump on the back of his head, behind Christopher Robin. It is, as far as he knows, the only way of coming downstairs, but sometimes he feels that there really is another way, if only he could stop bumping for a moment and think of it. And then he feels that perhaps there isn't. Je vous présente Eduoard, qui à l'instant descend les escaliers, tac, sur sa tête, derrière Jean-Christophe. C'est, d'autant qu'il s'en souvienne, la seule manière de descendre les escaliers, bien qu'il ait parfois l'impression qu'il y a une autre manière, si il pouvait arrêter de faire tacoter pour bien y réfléchir. Et ensuite, il lui semble qu'il n'y a.
Time to Collaborate = 9 – 12 Months Activity time to develop Collaboration = 18 – 20 Hours
Collaboration Retreat 48 HOURS 10 COLLABORATIVE PROJECTS in MARINE RENEWABLE ENERGY
There are enviable test facilities Supergen Marine Academic Research Network New and Renewable Energy Centre (Na. REC) Qineti. Q European Marine Energy Centre (EMEC) Wave Hub PRIMa. RE
Ideas Objectives Actions Outputs Outcomes
A Hundred (75) Ideas in an Hour Start: 18. 30 Finish: 20. 00 Duration: 90 minutes
Ideas Objectives Materials & Technology • Effectiveness / Efficiency / Energy Yield of Technology • Anti Fouling • Methods / Protocols for Material & Design (Composites) Oceanographic & Environmental Measurement • Energy Sector Best Practice Sharing • Cooperative Study of Wave / Tide Action • Development of Standard Methods of Measurement Actions Environmental Studies • Algae as Biomass Fuel Source • Impact Assessment & Detection Systems • Impact Assessment Standards & Legislation Devlpmt. Outputs Mooring, Cables & Reliability • Foundations, Infrastructure, Safety & Maintenance • Cables & Grid based Technology • Moorings • Control System Design Outcomes DIDN’T WE DO WELL!
43 Delegates ( 19 French & 24 English) 14 Companies (7 French & 7 English) 19 Academics (from 5 Institutions) 2 Presentation, 2 Sound-bites 1 Poster Session, 5 Group Working Sessions 67 Ideas in an Hour And…………………. 6 Projects!! (and 1 Gorilla)
- Slides: 11