All Experimenters Meeting October 06 2014 Photo by
All Experimenters’ Meeting October 06, 2014 Photo by Greg Vogel
2014 Shutdown • Four full weeks into the shutdown – Still on schedule plus or minus a day
Wilson Hall Outages Low Impact • Friday, October 10 th – Power to Wilson Hall (Entire site except Main Injector, Muon Campus, and Village) – From 0700 -0730 – MSS off KRSS backfeed
Wilson Hall Power Outages • Saturday, October 18 th – Sunday, October 19 th – – Power outage to Wilson Hall 0700 – 1600 Sunday Wilson Hall closed except authorized personnel Remote Operations Center West (ROC West) available • Saturday, November 8 st – Sunday, November 9 th – – – Rescheduled from Nov. 1 st & 2 nd Power outage to Wilson Hall 0700 – 1600 Sunday Wilson Hall closed except authorized personnel Remote Operations Center West (ROC West) available • Friday, November 28 th – Saturday, November 29 th – – – Rescheduled from Oct. 20 th & 21 st Power outage to Wilson Hall 0700 – 1600 Sunday Wilson Hall closed except authorized personnel Remote Operations Center West (ROC West) available
ICW & PM work • Inspection & Cleaning of Casey’s Pond Intake Sump – Tuesday, October 14 th • Requires ICW flow between 4500 and 5000 GPM • Currently between 5500 and 6000 GPM • Will take a reading on Monday, October 13 th • ICW Valve repairs – Various areas affected – MINOS/LAr. TF/BNB/MTA(partial) Completed – Still to come • FCC, Meson Detector Building, Lab A & B • Electrical PM’s – Feeder 43: Oct. 25 th • Transfer Gallery, Switchyard
Schedules and Links: • Schedule can be accessed from the Operations Home Page – - Schedules -> Operations Schedule • Direct link to schedule – - http: //www-ad. fnal. gov/ops/schedule. html
- Slides: 6