Air Quality Permitting Air Quality Committee William D. Willets, P. E. Engineering Supervisor DAQ

Air Quality Permitting Air Quality Committee William D. Willets, P. E. Engineering Supervisor DAQ Permitting Section May 7, 2014 1 2/20/2021

Do I need a permit? l Yes – By statute, codified under … –

Do I need a permit? l Yes – By statute, codified under … – Title 15 A NCAC Subchapter 2 Q. 0101 l l (a) No owner or operator shall do any of the following activities … without first applying for and obtaining an air quality permit … Unless you don’t – Exemptions under 15 A NCAC 2 Q. 0102 l Currently undergoing revision for clarification and simplification 2

What kinds of permits are there in NC? l Construction Permits – State pre-construction

What kinds of permits are there in NC? l Construction Permits – State pre-construction – PSD/NSR permits l Operating Permits – State permits – Title V permits l l Developed under the federal 1990 CAAA to consolidate all applicable requirements into a single compliance tool Construction/Operating Permits – “Traditional” combination of the above l Air toxics permits – Not exclusive of other permitting programs 3

What’s in a permit? l Applicable requirements – State enforceable, federally enforceable, both –

What’s in a permit? l Applicable requirements – State enforceable, federally enforceable, both – Construction and operation l Means to demonstrate compliance with applicable requirements – Monitoring, recordkeeping, and reporting requirements l General conditions 4

What can I do without a permit? 2 Q. 0102 activities l Basic earth

What can I do without a permit? 2 Q. 0102 activities l Basic earth work (clearing and grubbing) l NC construction bill l – Notification – Public notice – Fee 5

How do I get a permit? l Procedures in 15 A NCAC 2 Q.

How do I get a permit? l Procedures in 15 A NCAC 2 Q. 0300 and. 0500 – Subchapters designate permitting procedures based on State or Title V processes – PSD/NSR procedures also in 2 D. 0530/. 0531 l l l Permit application submittal Completeness review Engineer review – May include requests for additional information l l Public/EPA participation Final agency action – Issue or deny permit 6

How do I know what kind of permit to get? Construction and operation permit(s)

How do I know what kind of permit to get? Construction and operation permit(s) l Operating permit l Type of facility l Potential to emit regulated air pollutants l 7

Potential to Emit l l l Maximum capacity Physical and operational design Physical or

Potential to Emit l l l Maximum capacity Physical and operational design Physical or operational limitation Air pollution control equipment Restrictions Definable by the permit 8

Major Source Thresholds l PSD – 250 tpy or 100 tpy – Depends on

Major Source Thresholds l PSD – 250 tpy or 100 tpy – Depends on source type – Lower thresholds for modifications l NAA – 100 tpy l Title V – 100 tpy – 10/25 tpy 9

Small Facilities Unrestricted PTE below all major source thresholds l State (2 Q. 0300)

Small Facilities Unrestricted PTE below all major source thresholds l State (2 Q. 0300) construction and operation permit l Administered by Regional Office l 10

Synthetic Minor Facilities Permit restrictions (including control devices) to maintain PTE below all major

Synthetic Minor Facilities Permit restrictions (including control devices) to maintain PTE below all major source thresholds l State (2 Q. 0300) construction and operation permit l Administered by Regional Office l 11

Non-PSD/NSR Major Facilities Title V facilities l Permitted PTE above one or more Title

Non-PSD/NSR Major Facilities Title V facilities l Permitted PTE above one or more Title V major source thresholds l State (2 Q. 0300) construction and operation permit l Title V operation permit (2 Q. 0500) l Administered by Central Office l 12

PSD/NSR Major Facilities Also Title V facilities l Permitted PTE above one or more

PSD/NSR Major Facilities Also Title V facilities l Permitted PTE above one or more PSD/NSR major source thresholds l PSD (2 D. 0530/. 0531) construction permit l State pre-construction permit l Title V operation permit l Administered by Central Office l 13

Permit Modifications Depends on type of permit and scope of modification l Non-Title V

Permit Modifications Depends on type of permit and scope of modification l Non-Title V modifications administered by Regional Office l Title V and PSD/NSR modifications administered by Central Office l 14

Air Toxics Permits Coupled with other permitting programs l Procedures under 2 Q. 0700

Air Toxics Permits Coupled with other permitting programs l Procedures under 2 Q. 0700 l Air toxics rules have recently been revised (effective May 1, 2014) in accordance with State statute l 15

Permitting Section Emerging Issues Revisions to 02 Q. 0102 permitting exemptions l Recent revisions

Permitting Section Emerging Issues Revisions to 02 Q. 0102 permitting exemptions l Recent revisions to Toxic Air Pollutant regulations l Ongoing incorporation of MACTs/GACTs into permits l 16

Questions? 17