AHCAL Integration JRA 3 Status and Outlook Mathias
- Slides: 19
AHCAL Integration (JRA 3). Status and Outlook Mathias Reinecke for the AHCAL developers EUDET annual meeting Geneva, Oct. 19 th – 21 st, 2009
Outline > JRA 3 Hardware Developments at DESY § CALIB, POWER, Flexleads § HBU 0 § DIF 0 and DAQ interface (USB) § Tiles integration ‘old-fashioned overview’ Flexleads > System Commissioning > The Next Generation > Conclusions and Outlook Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 2
Flexleads – SIGNAL and POWER > 20 pieces of each type finished. Flexlead Pre-Bending: > Pre-bending procedure ok. Type: POWER ~22 mm Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 3
Flexleads – SIGNAL and POWER CALIB > About 80 connection cycles up to now - still ok. > Compensate HBU misalignments in distance. > Fulfill AHCAL height requirements. HBU > Tests ok concerning: § Signal allocation § Signal quality § Resistance for power Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 4
CALIB and POWER Modules CALIB module: 11 x 10 cm² POWER module: 12. 5 x 11 cm² ARM 7 µC > 4 Modules of both types finished, in operation. > First tests successful. Sizes and heights: To be adapted to ILC mechanics later. Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 5
HCAL Base Unit (HBU) setup 2 setups in operation 36 cm SPIROC 1 DIF FPGA CALIB Connectors: Signal Power USB / DAQ Flexleads SPIROC 2 CALIB (fibres), ASCR Prague Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 6
Reflector Foil Assembly HBU backside Reflector Foil (assembled in 4 steps) Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 7
Reflector Foil Assembly m m 5 2. Alignment pin Si. PM pins LED Alignment ‘Reflector Foil – HBU’ Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 8
Tile Assembly (the first 18) Assembled tiles ‘ just before soldering’. Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 9
Tile Map Each quadrant can choose between 3 Si. PM bias voltages Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 10
Commissioning – Signal Chain for LED operation “Full Operation Chain” Concept : December 2007 Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 11
LED Pulse shape (measured on HBU) VCALIB (~8. 2 V) TCALIB (40 ns LVDS pulse) LED optical Output (PMT H 9858 -01) Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 12
Commissioning SPIROC 2 output: LEDs firing, 3 events (triggers), 18 tiles assembled Hit Bit (internal channel trigger) Baseline Tiles with LED Light (SPIROC out) 1 event (36 chns) Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 13
Commissioning (status last Friday) SPIROC 2 output: LEDs firing, 2000 events (trig. ), 18 tiles assembled Chn 34: Open SPIROC Input (pedestal) Chn 34: Biased Si. PM, LED active Labview Software extended to multi-cycle data taking => histograms we try to get single peak spectra now to get an idea about global channel gain and noise margin Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 14
Commissioning Slow Control : Read detector’s temperatures, voltages, currents HBU temperature profile VDDA, VDDD and currents Slow-Control: Still under test Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 15
The Next Generation (‘final’ ILC setup concept) Mechanical concept: K. Gadow Not in scale! Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 16
The Next Generation Cassette (=slab) HBU SPIROC Sector Connecting Plate Not in scale!! Central Interface Board with DIF, CALIB and POWER Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 17
The Next Generation HBU SPIROC LED Flexlead + tiny connector Tile with Si. PM Not in scale!! Central Interface Board with DIF, CALIB and POWER Cooling Pipe Reflector Foil Cassette Bottom Plate Height pitch of 20 mm possible: HCAL-W, under invest. Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 18
Conclusions and Outlook > AHCAL prototype delivers first test-data from LED system. > British DAQ (hardware, DIF firmware) still has to be implemented. > Full equipment of HBUs with tiles very soon now. > DESY electron-testbeam preparation: => S. Christen: Labview extension for testbeam => small hardware changes (e. g. ext. trigger) => lab characterization of HBU (incl. LED system) > Redesign concepts of AHCAL modules are prepared now. > A lot of system’s and SPIROC analogue and digital tests ahead. Mathias Reinecke | EUDET annual meeting Geneva | Oct. 19 th, 2009 | Page 19
- Jra kemenag
- Outlook for corporate incentive travel programs
- Nav 2015 outlook integration
- Three dimensions of corporate strategy
- Backwards intergration
- Simultaneous integration meaning
- Mathias virchow
- Montfort malang
- Mathias temot
- Mathias fünfstück
- Mathias temot
- Mathias loris
- Somatiseringstilstand
- Mathias reinecke
- Porr h
- Mathias bienstman
- Mathias coiffard
- Chapter 4 cell theory and cell study
- Mathias fonkam
- Mathias loris