Agenda Points Managements items Integration Interface specifications beam
Agenda Points • Managements items • Integration, Interface specifications + beam pipe • Grounding plans • Documentation – storage control • Preparation for TDR, WBS near term plans
Management • Meetings- can this be more efficient, fewer? • Meeting , review schedule, next meeting • Discussion on CD-1 report.
Weekly Meeting structure • Tuesday tc-meeting 1. 30 – FV/HGR – Management. Brief technical updates. Critical issues – Tc-team • Wednesday 1. 00: integration- FV – Models, beam pipe, specifications (HFT/FGT interface). • Thursday: 1. 00 Hardware HM – Detailed progress on PXL, IST • Friday: 1. 30 Software SM • Wednesday SSD: 11. 00 HM/MLV – Includes contact to Nantes. Bi-weekly
Meetings Document preparation • Interface specification, March 24 Before CD-2 we need design review for baseline design, cost and schedule. It may be advantageous to have some of these split up.
Integration specification • • • Let discuss the proposed format from Leo/Eric. What is overall needed? Identify lead person. Set goals for drafts, completion. I like the scroud+biasing to be documented (not presented), and have a final review.
Grounding plans • Let us present here what has been done some far. • How can this information be gathered in a document. • Gather information, have review with Ciro, Gerard (of documents first) to find problems
Documentation • Adepts for models? How are these tracked? Change control? • How can these be indexed reasonably. • Leo, Jow are setting up a svn server for PXL electric; Specification of these documents. Change control? • Project CD docs will be with KM, FV in final and controlled form. • Other documents reports, detector specification. • Drupal (exclude non star people (ICHP, Nantes. . ) • Web pages; control, backup an issue.
Near term plan • Complete physics response!!