AGATA Detector Group Meeting IKP Cologne March 16

  • Slides: 12
Download presentation
AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Results on Test Cryostats

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Results on Test Cryostats and The AGATA Asym. Triple: Status of Cryostat Production

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Assembly of Cap A

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Assembly of Cap A 003 into Test Cryostat 10032 Cross Talk Test Results by Nigel and/or Bart

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Assembly of Cap A

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Assembly of Cap A 002 into Test Cryostat 10033 FWHM @ 1, 3 Me. V Only row E; Core 2, 15 ke. V

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 History Meeting Cologne Oct.

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 History Meeting Cologne Oct. 20 th, 2005: Discussions and Determining of Measurements of the End Cap e. g. Clearance Cryostat – Cryostat: 0, 50 mm Incl. Tolerance of End Cap: 0. 15 mm Wall Thickness of End Cap: 1. 00 mm Distance End Cap – Capsule Wall: optimized Wall Thickness Capsule: 0, 80 mm Clearance between Capsules: 0. 50 mm Distance Capsule, internal: 0. 40 mm Tolerance Capsule Dimensions: 0. 10 mm

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 November and December 2005

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 November and December 2005 Design of an End Cap Geometry on Basis of these Numbers Workshop IKP Cologne with Catia CAD Programm

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 CTT Design Phase From

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 CTT Design Phase From January 2006 To End of February 2006 Viewer

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Some Details. . .

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Some Details. . .

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 HV Modules and Control

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 HV Modules and Control To be discussed: - final size of modules - assembly to cryostat - cabling - power supply - PT 100 read out - LN 2 read out electronic

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Status of Fabrication Cold

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Status of Fabrication Cold preamp blocks ~ 60 pcs in production Warm preamps available Internal cabling in production Feedthrough plates in production Dewars as shown ordered Cryostat hardware as shown ÞPrepared as good as possible to get ready in time

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Time Schedule Calendar 2006

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Time Schedule Calendar 2006 Jan Feb March April May June July Aug Sept Oct Nov Dez Design Approval Design Finish and Fabrication of Independent Parts Final Assembly Capsule Assembly

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Topics of CTT‘s Concern:

AGATA Detector Group Meeting, IKP Cologne March 16 th, 2006 Topics of CTT‘s Concern: Ø approval of the asym. cryostat design asap Ø Final fixing of the HV control units and their power supply Ø Discussions about frame mounting and cable channels, cable guiding etc.