Advanced Technology Solar Telescope ENCLOSURE Risk Mitigation Le. Ellen Phelps January 2006

Advanced Technology Solar Telescope ENCLOSURE Risk Mitigation Le. Ellen Phelps January 2006

Enclosure Systems Design Review Topics of Discussion • Overview & Charge to Committee (Mark

Enclosure Systems Design Review Topics of Discussion • Overview & Charge to Committee (Mark Warner) • 6 Major Parts of SDR: n n n SRD Flow Down & Error Budgets (Rob Hubbard) Specifications (Le. Ellen Phelps) Reference Designs (Le. Ellen) Lunch n n n • • Performance & Analyses (Le. Ellen) Contracting Approach (Mark) Risk Areas (Le. Ellen) Plans for Future Work (Le. Ellen) AOB Executive Session (closed session for committee members) Feedback from Committee (All Hands) ---------------------------------------------------- Dinner 10/24/2021 January 18, 2006 Overview & Charge to Committee 2

Enclosure Risk Mitigation • Cost • Schedule • Technical • Safety 10/24/2021 January 18,

Enclosure Risk Mitigation • Cost • Schedule • Technical • Safety 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 3

Enclosure Cost Estimate Methods • A specifications and 3 d CAD model were generated

Enclosure Cost Estimate Methods • A specifications and 3 d CAD model were generated in-house which flowed down from SRD • Series of computational fluid dynamics (CFD) and other engineering analyses performed on model to verify performance requirements could be met • Bottom-up $ estimate performed on enclosure model & specs n n Traditional cost-per-pound of steel System components cost estimates Comparison to previous projects Engineering experience • Funded design evaluation studies were commissioned with 2 enclosure vendors/engineering firms to (a) review our conceptual designs and specs; and (b) provide independent cost estimates: n n M 3 Engineering (Tucson, AZ) Vertex. RSI (Richardson, TX) • Updated in March 2005 for inflated material costs, height, and refined thermal designs 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 4

Enclosure Risk Mitigation Thermal System Costs ‘Value Engineering’ Challenge to meet budget target: •

Enclosure Risk Mitigation Thermal System Costs ‘Value Engineering’ Challenge to meet budget target: • Lower $/ft 2 n Identified a lower cost style of plate coil • Reduce Thermal Load/ft 2 n Optimized thermal ground treatment size and design • Reduce Overall ft 2 of Coverage n n Reduced thermal loads when considered with site seeing/wind conditions reduced skin temperature control requirements of Lower Enclosure Optimized Carousel shape to increase area not subject to insolation thereby not covered with plate coil • Reduce costs elsewhere n Simplified plate coil mounting details 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 5

Enclosure Risk Mitigation Enclosure Costs Summary of cost as risk: • The first round

Enclosure Risk Mitigation Enclosure Costs Summary of cost as risk: • The first round of comprehensive cost estimates was in August 2004 with updates in March 2005 • We have continued to develop the specifications • We believe the current specification fits the current budget • Plan to update estimates with input from industry 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 6

Enclosure Risk Mitigation Schedule 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 7

Enclosure Risk Mitigation Schedule 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 7

Enclosure Risk Mitigation Schedule • Enclosure as near critical path • Enclosure, TMA, and

Enclosure Risk Mitigation Schedule • Enclosure as near critical path • Enclosure, TMA, and S&O Building foundations • General construction contingencies 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 8

Enclosure Risk Mitigation Schedule • M 1 early procurement → Site work & Enclosure

Enclosure Risk Mitigation Schedule • M 1 early procurement → Site work & Enclosure as critical path n n Critical path to TMA installation in any case Requires aggressive planning, coordination, and knocking down issues before they become issues (dedicated COTR) 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 9

Enclosure Risk Mitigation Schedule • Enclosure, TMA, and S&O Building foundation design, construction, and

Enclosure Risk Mitigation Schedule • Enclosure, TMA, and S&O Building foundation design, construction, and coordination n n Early start on design during D&D phase (if funds are available) with early input from vendors during construction phase Foundation designs ready for an early construction start 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 10

Enclosure Risk Mitigation Schedule • Environmental, cultural, weather, labor, and safety issues are sure

Enclosure Risk Mitigation Schedule • Environmental, cultural, weather, labor, and safety issues are sure to arise n n A certain amount of contingency is planned for in the schedule Regardless, this requires aggressive coordination and attention (dedicated COTR) 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 11

Enclosure Risk Mitigation Technical Risks • Thermal Performance n n Include easy upgrade paths

Enclosure Risk Mitigation Technical Risks • Thermal Performance n n Include easy upgrade paths for full coverage with plate coil Mat. Lab/Simulink model of controls • Thermal coating system cost, availability, & performance n Work requirements with vendors • Minimize streaming of ground layer up and over (Co. DR recommendation) n Multi-physics model of optimized systems 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 12

Enclosure Risk Mitigation Technical Risks • Potential for vibration transmission between the Enclosure and

Enclosure Risk Mitigation Technical Risks • Potential for vibration transmission between the Enclosure and TMA through the foundations n FE modeling and vibration analysis to study coupling effects using Site soil characteristics • Azimuth cable wrap performance n Multiple vendor input 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 13

Enclosure Risk Mitigation Technical Risks OPEN THE FLOOR FOR DISCUSSION What other technical risk

Enclosure Risk Mitigation Technical Risks OPEN THE FLOOR FOR DISCUSSION What other technical risk areas should we consider? 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 14

Enclosure Risk Mitigation Safety • Contractor Design Phase Safety Contractor safety record as a

Enclosure Risk Mitigation Safety • Contractor Design Phase Safety Contractor safety record as a significant selection factor n Designs meet appropriate codes and standards n Review points to analyze construction methods, operability, maintainability, and accessibility n 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 15

Enclosure Risk Mitigation Safety • Construction Phase Safety n n Safety processes (e. g.

Enclosure Risk Mitigation Safety • Construction Phase Safety n n Safety processes (e. g. Job Task Analysis, etc. ) as fundamental requirement in contract → Uncompromising scrutiny Completion of Enclosure before TMA installation phase • Schedule contingency ‘slack time’ required? n n Weather conditions play heavily into work at height and with crane picks Create a culture that values safety, for example: • Dedicated on Site Safety Officer with the authority to shut down construction • Daily safety briefings 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 16

Enclosure Risk Mitigation Safety • Operation Phase Safety Potential hazards ID’d during design n

Enclosure Risk Mitigation Safety • Operation Phase Safety Potential hazards ID’d during design n n Color schemes and other cues for rotational versus non-rotational components Any confined spaces clearly marked and procedures in place Isolation points for lock-out tag-out procedures easy to identify etc. 10/24/2021 January 18, 2006 Enclosure Risk Mitigation 17