Advanced Technology Solar Telescope ENCLOSURE Future Work Le. Ellen Phelps January 2006

Advanced Technology Solar Telescope ENCLOSURE Future Work Le. Ellen Phelps January 2006

Enclosure Systems Design Review Topics of Discussion • Overview & Charge to Committee (Mark

Enclosure Systems Design Review Topics of Discussion • Overview & Charge to Committee (Mark Warner) • 6 Major Parts of SDR: n n n SRD Flow Down & Error Budgets (Rob Hubbard) Specifications (Le. Ellen Phelps) Reference Designs (Le. Ellen) Lunch n n n • • Performance & Analyses (Le. Ellen) Contracting Approach (Mark) Risk Areas (Le. Ellen) Plans for Future Work (Le. Ellen) AOB Executive Session (closed session for committee members) Feedback from Committee (All Hands) ---------------------------------------------------- Dinner 6/18/2021 January 18, 2006 Overview & Charge to Committee 2

Enclosure Future Work • Multi-physics model of current Enclosure configuration n Feed the results

Enclosure Future Work • Multi-physics model of current Enclosure configuration n Feed the results back in to resize and re-cost the components of the various thermal systems…update AMEL/MECO study • Thermal coating system n Identify (and test? ) commercially available products • Azimuth cable wrap system n Work requirements with Igus and Kabelschlepp…find others 6/18/2021 January 18, 2006 Enclosure Future Work 3

Enclosure Future Work • Design study to determine the extent of the requirement for

Enclosure Future Work • Design study to determine the extent of the requirement for vibration isolation • Internal project discussion: Bring the mechanical equipment (chiller, ice, fans, etc) back into Enclosure scope? 6/18/2021 January 18, 2006 Enclosure Future Work 4

Enclosure Future Work • Complete the Interface Control Documents • Enclosure Control System and

Enclosure Future Work • Complete the Interface Control Documents • Enclosure Control System and Local Interlock Control designs complete for SDR this summer n Include Mat. Lab/Simulink model of thermal controls 6/18/2021 January 18, 2006 Enclosure Future Work 5

Enclosure Future Work • Second round of funded design evaluation studies with vendors/engineering firms

Enclosure Future Work • Second round of funded design evaluation studies with vendors/engineering firms to: n n n 6/18/2021 January 18, 2006 review our system level designs and specs provide updated independent schedule estimates; and provide updated independent cost estimates Enclosure Future Work 6