Advanced Project Management u ISBN: 978 -0 -9582733 -7 -4 Rory Burke u Chapter 13 u Project Execution Phase u u © copyright 2011
Chapter 13 (APM p. 226 -243) u. Project u. Please Execution Phase use these Power. Point Slides In Conjunction with the Instructor’s Chapter Guide u © copyright 2011
(Topic 1) Project Methodology Lifecycle (APM p. 227) u Use Figure 13. 1 (APM p. 227) to Show the Relative Position of the Project Execution Phase with Respect to the other Phases
(Topic 2) Project Management Process (APM p. 228) u Use Figure 13. 2 (APM p. 228) to Show the Project Management Process can be used to Manage the Project Execution Phase
(Topic 2) Project Management Process (APM p. 208)
(Topic 3) Go/No-Go Decision (APM p. 230) u Use Figure 13. 3 (APM p. 116) to Show the Decision-Making Process to Initiate the Project Execution Phase
(Topic 4) Project Build-Method 1 (APM p. 232) u Shows Where the Build-Method is Positioned Within Each Phase u Show How the Build-Method is Interlinked with the Other Build. Methods in the Other Phases
Project Build-Method 2 (APM p. 232) u Location Logistics u Location Resources u Location – Weather Conditions u Location Facilities u Site Establishment
Project Build-Method 3 (APM p. 232) u Material Storage u Equipment u Open Up Work Faces u Working Below u Overcrowding
Project Build-Method 4 (APM p. 232) u Production u Pre-Outfit u Modular u Boxed-In Line Work
Project Build-Method 5 (APM p. 232) u Fast Tracking u Security u Health and Safety u Communication
(Topic 5) Project Execution Strategy 1 (APM p. 238) u Shows Where the Execution Strategy is Positioned Within Each Phase u Show How the Execution Strategy is Interlinked with the Other Execution Strategies in the Other Phases
Project Execution Strategy 2 (APM p. 238) u. Manufacture (In-House): u. In-House Labour u. Quality Control u. Pre-Qualification u. Work Experience u. Disruptive
Project Execution Strategy 3 (APM p. 238) u. Benefits of Outsourcing: u. Best Price u. Resource Overload u. Labour Rate u. Range of Expertise u. Too Small u. Established Brand
Project Execution Strategy 4 (APM p. 238) u. Benefits of Outsourcing: u. Lowers Manufacturing Costs u. Capital Expenditure u. Lower Overhead Costs u. Business Opportunities u. Follow the Sun
Project Execution Strategy 5 (APM p. 238) u. Problems of Outsourcing: u. Simplify Design u. Long Production Runs u. Lead Time u. Quality Control
Project Execution Strategy 6 (APM p. 238) u. Problems of Outsourcing: u. Customer Link u. Copyright u. Foreign Culture u. Communication