1. General Information on the Action ADRI UP at a glance: q Action Nr.

1. General Information on the Action ADRI UP at a glance: q Action Nr. : 2015 -EU-TM-0310 -M; q Call for proposal: CEF Transport 2015; q Priority: Motorways of the Sea; q Nature of the Action: upgrading of an existing MOS link; q MS Involved: Italy and Greece; q Budget: 22, 750, 000 €. cofinancing 7, 130, 500 €. ) (CEF q Duration: 01. 03. 2016 – 20. 12. 2020 q % ASR 2017 Financial Progress: 11% 3

2. The relevance of the Adriatic Ionian Maritime Corridor: EU and international value, Freight

2. The relevance of the Adriatic Ionian Maritime Corridor: EU and international value, Freight and Passenger Traffic EU LEVEL INTERNATIONAL LEVEL Extension under proposal of the MED and the ORIENT-EAST MED Core Network Corridors Under the EU-China Platform carried on by DG Move and the EU Member States and neighboring countries, 5 infrastructural projects on 7 rely in the Adriatic-Ionian Region and one more project is currently under appraisal Increase of the regional relevance as one of the main entry-exit point for EU and EU-external trade 4

2. The relevance of the Adriatic Ionian Maritime Corridor: EU and international value, Freight

2. The relevance of the Adriatic Ionian Maritime Corridor: EU and international value, Freight and Passenger Traffic Source: MOS Detailed Implementation Plan by EU MOS Coordinator, 2016 data. 5

2. The relevance of the Adriatic Ionian Maritime Corridor: EU and international value, Freight

2. The relevance of the Adriatic Ionian Maritime Corridor: EU and international value, Freight and Passenger Traffic First EU countries for gross weight of goods transported in SSS Source: Eurostat 2017 EU countries EU 28 United Kingdom Netherlands Italy Spain Germany France Sweden Belgium Greece Passengers embarked/desambarked in EU ports per MS - Non cruise – in thousands Source: Eurostat 2017 Total* (million of tonnes) 1, 810, 80 313, 5 286, 2 272, 2 196, 6 174, 1 169, 3 151, 5 131, 1 98, 1 EU countries 2015 EU 28 395. 373 Italy 66. 129 Greece 65. 295 Denmark 41. 280 Sweden 29. 357 Germany 28. 862 Italy and Greece, the two MS involved in ADRI UP Action, are amongst the major EU countries for freight and passenger traffic in SSS 6

2. The relevance of the Adriatic Ionian Maritime Corridor: EU and international value, Freight

2. The relevance of the Adriatic Ionian Maritime Corridor: EU and international value, Freight and Passenger Traffic The main flows of cargo RO-RO units in the ports of Adriatic-Ionian Region Source: Eurostat (2016), AAGR Average Annual Growth Rate (AAGR) The Adriatic-Ionian Corridor is amongst the most utilized ones within the MED (around 10, 2 Mil. tonnes of Ro-Ro traffic) with important improvement margins in terms of capacity and frequency 7

3. ADRI UP Action: Objectives and consortium General Objective: Development and upgrading of the

3. ADRI UP Action: Objectives and consortium General Objective: Development and upgrading of the Mo. S corridor in the Eastern Mediterranean Area, specifically of the Mo. S link Trieste-Ancona-Igoumenitsa, by boosting port’s and RRT’s infrastructures in Trieste, Fernetti, Ancona and Igoumenitsa. The Action will contribute to the integration of the Mo. S corridor in the freight supply chains, increasing EU trade competitiveness in the South Mediterranean area, through the connection of 4 TEN-T Core Network Corridors. SCANMED BAC ORIENTEAST MED 8

3. ADRI UP Action: Objectives and consortium Specific Objectives q Increase of passenger and

3. ADRI UP Action: Objectives and consortium Specific Objectives q Increase of passenger and freight traffic flows; q Improvement of quality of logistic services; q Provision of new services in terms of cargo storage and processing; q Improvement of the hinterland connections at the three ports, enhancing “networking” and intermodality; q Removal of the existing bottlenecks; q Promote use of railway network, improvement of the rail infrastructure and the logistics facilities to supports’ intermodal traffic; q Ensure, also by adjusting links, economic development opportunities for the entire area; q Improvement of the environmental conditions in the Adriatic area through the reduction of road traffic congestion; q Support of sustainable intermodal transport and enhancing modal shift to maritime and rail transport modes; 9

3. ADRI UP Action: Objectives and consortium Partners: 3 Greek and 4 Italian partners

3. ADRI UP Action: Objectives and consortium Partners: 3 Greek and 4 Italian partners ü Igoumenitsa Port Authority – Coordinator ü Ancona Port Authority ü Trieste Port Authority ü Region of Epirus ü Industrial Park of Thesprotia S. A. ü Interporto di Trieste S. p. A. ü Italian Ministry of Infrastructures and Supporting partners: Ø Interporto Marche S. p. A. Ø Anek Lines Ø Superfast Ferries Ø Minoan Lines Ø Alternative Tasimacilik A. s Ø Kombiverkehr Ø Marche Region and the city of Ancona Transport – implementing body Rete Autostrade Mediterranee 10

4. ADRI UP Action: Activities Activity 1 • Construction of Igoumenitsa Freight Village (IFV)

4. ADRI UP Action: Activities Activity 1 • Construction of Igoumenitsa Freight Village (IFV) Activity 2 • Construction of road link between the IFV and Egnatia Odos highway Activity 3 • Studies for the upgrading of railway infrastructure in the Port of Ancona Activity 4 • Technical and environmental studies for the new RO/PAX terminal of the Port of Ancona Activity 5 • Functional and technical restructuring of Pier VI in the Port of Trieste Activity 6 • Integration of the maritime link in the Baltic-Adriatic & Mediterranean Corridors in the dryport of Fernetti Activity 7 • Project Management & Dissemination 11

4. ADRI UP Action: Activities Activity 1 Construction of Igoumenitsa Freight Village The aim

4. ADRI UP Action: Activities Activity 1 Construction of Igoumenitsa Freight Village The aim of this activity 1 is the construction of the Igoumenitsa Freight Village (IFV), located in Grika (part of the hinterland area of the Igoumenitsa port), 17 km away from the port of Igoumenitsa, adjacent to the Thesprotia Industrial Park (BIOPATHE). The main characteristics of the Freight Village are: Ø Distance to the Igoumenitsa Port: 17 km Ø Total area: 54. 7 ha (547 Km 2) Ø Public services complex: 0. 48 ha (4. 8 Km 2) Ø Area dedicated to warehouses: 17. 6 ha (176 Km 2) 12

4. ADRI UP Action: Activities Activity 1 Construction of Igoumenitsa Freight Village 13

4. ADRI UP Action: Activities Activity 1 Construction of Igoumenitsa Freight Village 13

4. ADRI UP Action: Activities The aim of activity 2 is to upgrade the

4. ADRI UP Action: Activities The aim of activity 2 is to upgrade the connexion between the Freight Village and the Egnatia-Odos axis. The construction works will focus on the links Activity 2 Construction of Road Link between IFV & Egnatia connecting the IFV with Egnatia Motorway. It will include the following elements: Ø Re-construction of the motorway intersection with the local road network; Ø Widening of traffic lanes; Ø Level intersections will be constructed at the local network to facilitate the traffic flows towards/from the freight village. 14

4. ADRI UP Action: Activities Activity 2 Construction of Road Link between IFV &

4. ADRI UP Action: Activities Activity 2 Construction of Road Link between IFV & Egnatia 15

4. ADRI UP Action: Activities Activity 3 Studies for the upgrading of railway infrastructures

4. ADRI UP Action: Activities Activity 3 Studies for the upgrading of railway infrastructures in the Port of Ancona will develop the intermediate and final designs of the works for upgrading the existing railway infrastructure inside the port commercial terminal. The five railway tracks will be extended from 260 -300 m to 550 m. The studies cover the following elements: Ø Extension of railway tracks to 550 m. The railway terminal is currently located in the area dedicated to temporary storage of containers and to the loading/unloading operations; Ø Redesign of the existing road infrastructure. Currently 700 m long, the road network will be adapted to the new terminal layout and high volume of vehicles; Ø Replacement of the customs entrance to allow the extension of the railway tracks. Ø Reorganization of the container yard to allow the extension of the railway tracks. The storage areas will be reorganized but it is not expected a reduction of the available space. 16

4. ADRI UP Action: Activities Activity 3 Studies for the upgrading of railway infrastructures

4. ADRI UP Action: Activities Activity 3 Studies for the upgrading of railway infrastructures in the Port of Ancona 17

4. ADRI UP Action: Activities Port of Ancona will carry on the development of

4. ADRI UP Action: Activities Port of Ancona will carry on the development of the technical and environmental studies for of the new RO/PAX terminal. Activity 4 Technical & environmental studies for the new RO/PAX terminal in the Port of Ancona Main planned features: Ø Total surface estimated in 113. 355 m 2; Ø Six new quays, 200 -350 m long; Ø Passenger terminal; Ø Parking yards and internal roads; Ø Road and railways connections to the national networks; Ø Facilities (energy, water, sewage, optical fibre, maintenance); 18

4. ADRI UP Action: Activities Activity 4 Technical & environmental studies for the new

4. ADRI UP Action: Activities Activity 4 Technical & environmental studies for the new RO/PAX terminal in the Port of Ancona 19

4. ADRI UP Action: Activities Activity 5 Functional & Technical restructuring of Pier VI

4. ADRI UP Action: Activities Activity 5 Functional & Technical restructuring of Pier VI in the Port of Trieste 20

4. ADRI UP Action: Activities Activity 5 Functional & Technical restructuring of Pier VI

4. ADRI UP Action: Activities Activity 5 Functional & Technical restructuring of Pier VI in the Port of Trieste 21

4. ADRI UP Action: Activities Activity 6. 1 Electrification of the rail yard, in

4. ADRI UP Action: Activities Activity 6. 1 Electrification of the rail yard, in order to boost the link of “Interporto di Trieste” with the electric-powered line Villa Activity 6 Integration of the maritime link in the Baltic-Adriatic & Mediterranean Corridors in the dryport of Fernetti Opicina – National border. The goal is obtaining a seamless logistic flow and stopping the use of polluting dieselpowered locomotives. Activity 6. 2 Logistics facilitiess to support intermodality The activity consists in new warehouse facilities for the organization of the cargo flows and the preparation of intermodal units for delivery: • 800 m 2 shed next to the existing warehouses • a new warehouse of 3, 000 m 2 for various goods adjacent to the railway embankment beam rails north side. 22

4. ADRI UP Action: Activities Activity 6 Integration of the maritime link in the

4. ADRI UP Action: Activities Activity 6 Integration of the maritime link in the Baltic-Adriatic & Mediterranean Corridors in the dryport of Fernetti A zoom of the line (the red line) defining the railway tracks that are not yet electrified. The works of Subactivity 6. 1 consist in the electrification of the highlighted segment. 23

4. ADRI UP Action: Activities Activity 6 Integration of the maritime link in the

4. ADRI UP Action: Activities Activity 6 Integration of the maritime link in the Baltic-Adriatic & Mediterranean Corridors in the dry port of Fernetti Subactivity 6. 2: the new warehouse. 24

4. ADRI UP Action: Activities Dissemination Plan Activity 7 Project management and dissemination Promotional

4. ADRI UP Action: Activities Dissemination Plan Activity 7 Project management and dissemination Promotional material Smart communication tools (website, newsletter, partner’s social media channels) Articles in local and national press, publications on other media Participation & organization of relevant meetings, fairs, conferences and seminars 25

4. ADRI UP Action: Activities A fundamental Institutional Initiative and amplifying tool in which

4. ADRI UP Action: Activities A fundamental Institutional Initiative and amplifying tool in which ADRI UP Project has been presented and elevated as best practice in the Region, in terms of cross border Mo. S links and in terms of improvement of the accessibility and connectivity in ports and between ports and hinterland: Activity 7 Project management and dissemination The EU Strategy for the Adriatic and Ionian Region (EUSAIR) In particular, the “PILLAR 2: Connecting the Region”, coordinated by Italy (Focal Point RAM) and Serbia, focuses on 3 topics: 1)Maritime Transport 2)Intermodal connections to the hinterland 3)Energy Networks 26

4. Conclusion Will contribute to foster the Mo. S concept as i) mean of

4. Conclusion Will contribute to foster the Mo. S concept as i) mean of connection among MED, BAC, SCAN-MED and Orient-East Med CNC’s; ii) mean of efficient and intermodal connection of the ports with their hinterland areas; iii) sustainable mode of transport promoting modal shift; Will ensure project visibility, and compliance with the priorities stated in the II° Pillar of the Mo. S DIP and in the framework of the EU Strategy for Adriatic Ionian Region (EUSAIR) Will highlight the key role of CEF Transport contribution to the port’s accessibility improvement as well as to the enhancement of the trade competitiveness in the Adriatic. Ionian intermodal corridor, creating investment opportunities in the involved areas Will enhance the private logistic operators business, mostly of them already included as supporting partners of the Action 27

Many Thanks for your attention! 28