Adding New Volumes in Geant 4 Baseline Geometry
Adding New Volumes in Geant 4 Baseline Geometry Status of Agreement AA 366/10 Apr 25, 2019 Besik Kekelia Georgian Technical University 1
WP 1: “Adding New Volumes in Geant 4 Baseline Geometry” To -do List 1. 2. 3. 4. 5. 6. 7. Flexible Chains (sec 11) Flexible Chains (sec 15) GAP Outer Services JD Services (sec 13) GAP Middle Services CALO Services Platforms in missing Sectors Status of Agreement AA 366/10; Apr 25, 2019 Current Project Moved to WP 2 2
WP 1: “Adding New Volumes in Geant 4 Baseline Geometry” Deliverables: 1. Technical reports of Simplification 2. XML code 3. Technical reports of Integration Conflicts Checking Detailed Model Simplified model Volume (m 3) 0. 2562 Volume (m 3) 0. 256 Mass (kg) 2’ 049 Mass (kg) 2’ 048 Material Stainless Steel Density (kg/m 3) 8000 Status of Agreement AA 366/10; Apr 25, 2019 3
Flexible Chains (sec 11 -15) Geant 4 Geometry Flexible Chain sec 9 As Built Geometry Flexible Chain sec 11 Status of Agreement AA 366/10; Apr 25, 2019 Flexible Chain sec 15 4
Flexible Cain sec 11 - Current Detailed Model Simplified model Volume (m 3) 0. 518 Mass (kg) 4’ 193. 92 Material Stainless Steel/Cooper Density (kg/m 3) 8’ 000/8960 Diff: 0 Kg Status of Agreement AA 366/10; Apr 25, 2019 5
Flexible Cain sec 11 - Current XML code of Flexible Chain sec 11 Status of Agreement AA 366/10; Apr 25, 2019 6
Flexible Cain sec 11 - Current There are Integration Conflict Between Flexible chain(sec 11) and Calorimeter. Saddle Clash = 14. 71 mm Flexible Chain sec 11 Status of Agreement AA 366/10; Apr 25, 2019 Calorimeter Saddle 7
Upcoming - GAP Outer Services Status of Agreement AA 366/10; Apr 25, 2019 8
Upcoming - JD Services (sec 13) JD Services sec 13 Geant 4 Geometry As Built Geometry Status of Agreement AA 366/10; Apr 25, 2019 9
Upcoming - GAP Middle Services Moved to WP 2 Status of Agreement AA 366/10; Apr 25, 2019 10
Upcoming - CALO Services Geant 4 Geometry As Built Geometry Status of Agreement AA 366/10; Apr 25, 2019 11
Upcoming - Platforms in missing Sectors Geant 4 Status of Agreement AA 366/10; Apr 25, 2019 12
Thank you for your Attention Besik Kekelia Georgian Technical University Besik. kekelia@cern. ch
- Slides: 13