AD 13 LM LAND MANAGEMENT Development Control Planning

  • Slides: 15
Download presentation
AD 13 LM LAND MANAGEMENT Development Control/ Planning Control

AD 13 LM LAND MANAGEMENT Development Control/ Planning Control

Development Control Use of development control tools such as zoning, plot ratio, height control

Development Control Use of development control tools such as zoning, plot ratio, height control Evaluate the compatibility of the project with the surrounding existing developments

Development control tools Building setback Provision of greenery Covered shelter for pedestrians Distance between

Development control tools Building setback Provision of greenery Covered shelter for pedestrians Distance between buildings Vehicular access and car park provisions Quantum of use Envelope guidelines (landed property)

Development control tools Green mark Building height Minimum plot size for Good Class Bungalows:

Development control tools Green mark Building height Minimum plot size for Good Class Bungalows: 1, 400 sm Minimum plot size for bungalows: 400 sm

Green mark This is a green building rating system to evaluate a building for

Green mark This is a green building rating system to evaluate a building for its environmental impact and performance. Developers are encouraged to build green, sustainable, smart buildings which are more - climate responsive, - energy efficient and - have healthier indoor environments which have access to natural light and good ventilation.

Urban designers & Urban planners Urban design deals with the large-scale organization and design

Urban designers & Urban planners Urban design deals with the large-scale organization and design of the city, with the massing and organisation of buildings and the space between them, but not with the design of the individual buildings. The site has been already been allocated as part of the larger planning process Key areas: Singapore River, Orchard Road shopping corridor, Marina Bay

Urban designers and urban planners Urban planning: The planners, on the other hand, must

Urban designers and urban planners Urban planning: The planners, on the other hand, must typically consider the entire city. In fact the planners often look beyond the city and understand how the city functions as part of a larger region.

URA’s role Urban planning and design Conservation Development services Place management

URA’s role Urban planning and design Conservation Development services Place management

URA’s role Urban planning and design Conservation Development services Place management

URA’s role Urban planning and design Conservation Development services Place management

Key growth areas Marina Bay Jurong Lake District Kallang Riverside Paya Lebar Central Developments

Key growth areas Marina Bay Jurong Lake District Kallang Riverside Paya Lebar Central Developments in the above growth areas will be subject to detailed guidelines and more stringent control

Developments in growth areas will be subject to: More detailed design guidelines which will

Developments in growth areas will be subject to: More detailed design guidelines which will help to guide the shape and form of the area’s development. More stringent development control to ensure the growth area is development on a holistic rather than a piecemeal basis Longer developer approval process due to the need to examine in detail the impact of each development on the area.

Place management Managing public spaces – a key element of urban design – to

Place management Managing public spaces – a key element of urban design – to ensure that they are lively, exciting places for people to visit and socialise.

Development Approval Process 2 types of planning approvals: q Outline Planning Permission q Planning

Development Approval Process 2 types of planning approvals: q Outline Planning Permission q Planning Permission

Outline Planning Permission v v q To test out a proposed land use, plot

Outline Planning Permission v v q To test out a proposed land use, plot ratio, building form or building height of a property before deciding whether to proceed with a formal application. This is especially when the property owner wants to know whether their proposal can be accepted in cases where: The proposed intensity or height is beyond approved control parameters The proposed development does not conform with the Master Plan land use specified Fee: 50% of a formal permission application

Planning Permission q ² ² Formal planning application for: Building Plan approval TOP Fire

Planning Permission q ² ² Formal planning application for: Building Plan approval TOP Fire Safety certificate CSC Documents (submission by QP) Refer to URA website www. ura. gov. sg Section 1: Development Control Submission Requirements Section 2: Planning Requirements q