Activits SPS pour BEICS Systmes dAlarmes YETS 2017
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS 2017 -2018 Nicolas Broca / Pierre Durand on behalf of AS Team 11/10/2017 EDMS: 1851960 Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11 th October 2017 BE/ICS/AS activities 1
Sommaire • ODH DETECTION (Nicolas Broca) • • Work for SPS Crab Cavity Test Stand FIRE DETECTION (Pierre Durand) • • Fire Detection and Evacuation Maintenances Sprinkler Maintenances Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11 th October 2017 BE/ICS/AS activities 2
ODH Detection for SPS Crab Cravity Test Stand Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11 th October 2017 BE/ICS/AS activities 3
ODH Detection for SPS Crab Cavity Test Stand Conceptual Design (integration ongoing) • Installation of 18 ODH detectors and 23 Flashing lights panels in: • BA 6 lift area, 2 detectors + 2 flashs/sirens • TA 6 tunnel and technical gallery, 7 detectors + 7 flashs • TS 6+ from DCUM 6405, 6 detectors + 10 flashs • TS 6 - to DCUM 6000, 4 flashs Planning to Validate & Resources • 2 control racks to setup 17 days of work – 2 FTE contract FSU GS 04 • Step 1, VIC scheduled on December 21 st • Step 2, Installation of equipment's – 10 days • EN/EL pull our cables in parallel BA 6 lift area 2 ODH + 2 flashs/sirens • Step 3, Cabling of equipment's – 5 days • Step 4, Tests and commissioning – 2 days • Step 5, HSE acceptance test – ½ day TA 6 7 ODH + 7 flashs TS 6+ 6 ODH + 10 flashs Nicolas Broca / Pierre Durand BE-ICS TS 64 flashs YETS 2017/2018 Coordination Meeting, 11 th October 2017 BE/ICS/AS activities 4
ODH Detection for SPS Crab Cavity Test Stand Planning Proposal (to validate with SPS coord, EN/EL and CC project) • Installation of equipment's – from December 19 th to January 15 th • Cabling of equipment's – from January 16 th to January 22 nd • Depend on EN/EL campaign progress • Tests and commissioning – from January 29 th to January 30 thnd • HSE acceptance test – TBD Needs and Impacts • EN/HE to help positioning racks in BA 6 • EN/EL to pull our cable asap • Handling co-activity in CC area, shifted work • Technical commissioning require to activate ODH flash • • Warning message in acces point sufficient or shifted work? HSE acceptance test require to activate evacuation siren • No acces to PA 6 for half day (4 to 6 hours) Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11 th October 2017 BE/ICS/AS activities 5
Fire Detection Maintenances Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11 th October 2017 BE/ICS/AS activities 6
Maintenance Fire detection & Evacuation Title Location Détection Incendie et évacuation des systèmes existants SPS souterrain et TT, partout Duration Planning Impact Needs PLAN Maintenance annuelle (exigence légale) BA 1 - SFDIN-00258, SESEV-00020 BA 2 - SFDIN-00254, SESEV-00021 BA 3 - SFDIN-00262, SESEV-00022 BA 4 - SFDIN-00256 et 286, SESEV-00023 et 108 BA 5 - SFDIN-00259, SESEV-00024 BA 6 - SFDIN-00260, SESEV-00_025 BA 7 - SFDIN-00261, SESEV-00026 Détection Incendie et évacuation des systèmes existants SPS surface: BA’s, BBs, etc. 5 semaines 1 équipe E 095 Début YETS Test de sirènes tôt le matin ou le soir – sans personne dans la zone concernée (VIC à réaliser, prévoir une journée pour l’ensemble du SPS ) Maintenance annuelle (exigence légale) BA 1 - SFDIN-00258, SESEV-00020 BA 2 - SFDIN-00254, SESEV-00021 BA 3 - SFDIN-00262, SESEV-00022 BA 4 - SFDIN-00256 et 286, SESEV-00023 et 108 BA 5 - SFDIN-00259, SESEV-00024 BA 6 - SFDIN-00260, SESEV-00025 BA 7 - SFDIN-00261, SESEV-00026 Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11 th October 2017 BE/ICS/AS activities 7
Maintenance SPRINKLER Title Systèmes Sprinklers existantes Maintenance bi-annuelle Location Duration Planning Impact SPS BA’s et shafts 1/jour par BA Viansone Securiton YETS En dehors de la maint. détection incendie Needs PLAN En dehors maint. eau incendie - CV BA 1 – SXSPR-00001 BA 2 - SXSPR-00002 BA 3 - SXSPR-00003 BA 4 - SXSPR-00004 BA 5 - SXSPR-00005 BA 6 - SXSPR-00006 BA 7 - SXSPR-00007 Nicolas Broca / Pierre Durand BE-ICS YETS 2017/2018 Coordination Meeting, 11 th October 2017 BE/ICS/AS activities 8