ACQUATICS FACILITY STUDY City of Vincennes Department of
- Slides: 31
ACQUATICS FACILITY STUDY City of Vincennes Department of Parks & Recreation
Concerns and Problems with Rainbow Beach • Overall image is poor, facility is tired and no longer an attraction. The facility lacks vitality. • Visitors are being lost to other venues. • The condition of the bathhouse is substandard. • Without shade, the oversized concrete pool deck is oppressive in the summer heat. • Pool mechanical system is antiquated and is past its life expectancy. • The concrete deck all around the pools has an irregular surface at expansion joints and settlement cracks. • Water from both the competition and wading pools is circulated through a single circulation pump violating current swimming pool codes. • Maintaining chemical balance for this pool is difficult. • It is reported that the pool loses approximately 1”-2” of water overnight due to leaks in the pool system located under the concrete pool shell. City of Vincennes – Aquatic Facility Study
Recommendations 1. Slides and / or Diving Boards 2. Play Apparatus / Structure for all ages 3. Zero Depth Entry 4. Competition / Recreation Combination – Uniqueness of 50 Meter Pool 5. Upgraded Bathhouse 6. Improved Concessions 7. ADA Accessibility 8. Variety of Experiences – Water Basketball, Water Volleyball, Etc. 9. Shade Structures and Lounge Seating 10. Sound System and Wi-Fi 11. Planned Activities and Programs City of Vincennes – Aquatic Facility Study
Pool Amenities City of Vincennes – Aquatic Facility Study
Slides City of Vincennes – Aquatic Facility Study
Zero Depth Entry City of Vincennes – Aquatic Facility Study
Shade Structures City of Vincennes – Aquatic Facility Study
Play Apparatus City of Vincennes – Aquatic Facility Study
Spray Parks City of Vincennes – Aquatic Facility Study
Recreation/Competition Combination City of Vincennes – Aquatic Facility Study
Bathhouse, Locker Facilities and Party Facilities City of Vincennes – Aquatic Facility Study
Options for Rainbow Beach City of Vincennes – Aquatic Facility Study
Option A: Addition of a spray park to the existing facility City of Vincennes – Aquatic Facility Study
Option A: Addition of a spray park to the existing facility Description and Cost 0 • Existing Recreation Pool and Bathhouse to Remain…………. . . . . …. . . . • Remove existing Wadding Pool and Deck……………………………. …. $ 10, 000 • Create New Splash Park……………. . ……………………………… $ 140, 000 • Provide Associated Site Improvements…………………. …. . $ 85, 000 $ 22, 000 Construction Range of Magnitude Budget………………. …. ……. . $ 257, 000 • Add new deck around the existing pool………………………………. ……. $ ? ? ? Shade Structures, Pavement, Fencing, Etc. • Contractor General Conditions/Overhead & Profit……………………. . City of Vincennes – Aquatic Facility Study
Option B: Renovation of the existing facility City of Vincennes – Aquatic Facility Study
Option B: Renovation of the existing facility Description and Cost • Minor Renovations to Existing Bathhouse. ………………. …. . . . . $ 100, 000 • Renovation Existing 10 Lane 50 Meter Lap Pool………………. . …………………. . . $ 1, 800, 000 Shade Structures………………………. . … $ 810, 000 • Provide New Water Slide……………………………………. . . . $ 175, 000 -$300, 000 • New Water Features/Play Apparatus………………. . $ 165, 000 • Contractor General Conditions/Overhead & Profit. ……………………. . …. $ 305, 000 • Infill Diving Well, Create New Slide Well, Create Zero Depth Entry, New Pool Filtration & Chemical Systems, Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & Construction Range of Magnitude Budget………. …………………. . … $ 3, 355, 000 -$3, 480, 000 City of Vincennes – Aquatic Facility Study
Option B. 1: Renovation of the existing facility City of Vincennes – Aquatic Facility Study
Option B. 1: Renovation of the existing facility Description and Cost • Minor Renovations to Existing Bathhouse…………………. …. . . . . $ 100, 000 • Renovation Existing 10 Lane 50 Meter Lap Pool………………. . …………………. . $ 1, 800, 000 Shade Structures…………………………………………. . . $ 810, 000 • Provide New Water Slide……………………………………. . . $ 175, 000 -$300, 000 • New Water Features/Play Apparatus. ……………………………. . $ 165, 000 • Add Spray Park and Associated Site Improvements……………………. $ 160, 000 • Contractor General Conditions/Overhead & Profit…………………. . …… $ 321, 000 • Infill Diving Well, Create New Slide Well, Create Zero Depth Entry, New Pool Filtration & Chemical Systems, Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & Construction Range of Magnitude Budget……………………. … $ 3, 531, 000 -$3, 656, 000 City of Vincennes – Aquatic Facility Study
Option C: Construction of a replacement facility City of Vincennes – Aquatic Facility Study
Option C: Construction of a replacement facility Description and Cost • Minor Renovations to Existing Bathhouse………………. …. . . . . $ 100, 000 • Create New Pool………………………………. . . . . $ 1, 250, 000 Shade Structures, etc……………………………. . . $ 740, 000 • Provide New Water Slide……………………………. . . . . $ 175, 000 -$300, 000 • New Water Features/Play Apparatus………………. . . $ 165, 000 • Contractor General Conditions/Overhead & Profit…………………. . . $ 243, 000 • Eight Lane – 25 Yard Lap Pool, Zero Depth Entry, Slide Well, New Pool Filtration & Chemical Systems, Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & Construction Range of Magnitude Budget………………. . . . . $ 2, 673, 000 -$2, 798, 000 City of Vincennes – Aquatic Facility Study
Option C. 1: Construction of a replacement facility City of Vincennes – Aquatic Facility Study
Option C. 1: Construction of a replacement facility Description and Cost • Minor Renovations to Existing Bathhouse………………. …. . . . . $ 100, 000 • Create New Pool………………………………. . ……………… $ 1, 250, 000 Shade Structures, etc……………………………. . $ 740, 000 • Provide New Water Slide……………………………. . . . . $ 175, 000 -$300, 000 • New Water Features/Play Apparatus…. . …………………. . $ 165, 000 • Add Spray Park and Associated Site Improvements………………… $ 160, 000 • Contractor General Conditions/Overhead & Profit………………… $ 259, 000 • Eight Lane – 25 Yard Lap Pool, Zero Depth Entry, Slide Well, New Pool Filtration & Chemical Systems, Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & Construction Range of Magnitude Budget………………. . . . . $ 2, 849, 000 -$2, 974, 000 City of Vincennes – Aquatic Facility Study
Option C. 2: Construction of a replacement facility City of Vincennes – Aquatic Facility Study
Option C. 2: Construction of a replacement facility Description and Cost • Minor Renovations to Existing Bathhouse………………. …. . . $ 100, 000 • Create New Pool………………………………. . ……… $ 2, 300, 000 Shade Structures, etc……………………………. . $ 810, 000 • Provide New Water Slide……………………………. . . $ 175, 000 -$300, 000 • New Water Features/Play Apparatus…. . …………………. . $ 165, 000 • Add Spray Park and Associated Site Improvements……………. . $ 160, 000 • Contractor General Conditions/Overhead & Profit…………………. . $ 371, 000 • Eight Lane – 50 Meter Lap Pool, Zero Depth Entry, Slide Well, New Pool Filtration & Chemical Systems, Piping & Equipment • Demolition, New Equipment Building, MEP, Pool Deck, Fencing & Construction Range of Magnitude Budget………………. . $ 4, 081, 000 -$4, 206, 000 City of Vincennes – Aquatic Facility Study
Option C. 3: Construction of a replacement facility City of Vincennes – Aquatic Facility Study
Option C. 3: Construction of a replacement facility Description and Cost $ 2, 300, 000 Shade Structures, etc……………………………. . $ 810, 000 • Provide New Water Slide……………………………. . . $ 175, 000 -$300, 000 • New Water Features/Play Apparatus………………. . $ 165, 000 • Add Spray Park and Associated Site Improvements………………. . $ 160, 000 • Add New Bathhouse with Concessions………………………. $ 625, 000 • Contractor General Conditions/Overhead & Profit…………………. . $ 423, 000 • Create New Pool………………………………. . ………… • Eight Lane – 50 Meter Lap Pool, Zero Depth Entry, Slide Well, New Pool Filtration & Chemical Systems, Piping & Equipment • New Equipment Building, MEP, Pool Deck, Fencing & Construction Range of Magnitude Budget………………. . . $ 4, 658, 000 -$4, 783, 000 City of Vincennes – Aquatic Facility Study
Cost Comparison City of Vincennes – Aquatic Facility Study
Cost Comparison of Other Facilities Baker Park Pool New Castle, Indiana Year Built Pool S. F. Original Pool Cost 2012 Pool Cost Description 2007 7, 546 $999, 000 $1, 158, 000 25 yard pool, zero depth entry, small participatory feature, slide City of Vincennes – Aquatic Facility Study
Cost Comparison of Other Facilities Rochelle-Landers Pool Evansville, Indiana Year Built Pool S. F. Original Pool Cost 2009 7, 966 $1, 152, 000 2012 Pool Cost $1, 258, 000 Description 25 yard pool, zero depth entry, large participatory play feature, tot slide, medium sized slide, spray park features in zero depth entry City of Vincennes – Aquatic Facility Study
Cost Comparison of Other Facilities Bethel Park Aquatic Center Indianapolis, Indiana Year Built Pool S. F. Original Pool Cost 2012 Pool Cost Description 2011 6, 691 $1, 146, 000 $1, 180, 000 25 yard pool, zero depth entry, large participatory play feature, “run-out” slide City of Vincennes – Aquatic Facility Study
Questions?
- Uss vincennes case study
- Ekurhuleni energy department
- San luis obispo county building department
- City of palm coast water department
- Gabrielle langston
- Tuba city fire department
- City of atlanta department of public works
- Stockton planning commission
- City of los angeles department of recreation and parks
- City of houston design manual
- City of hamilton public works department
- Nyc department of youth and community development
- City of cupertino planning department
- Pueblo city county health department
- Pasadena city college police department
- North vancouver city fire department
- City of houston finance department
- Pros of latin american city model
- Cbd inner city suburbs
- Is mexico city a primate city
- Labov department store study
- Freiburg sustainable city case study
- What is case series
- Retrospective cohort study vs prospective cohort study
- Method study in management
- Study less study smart
- Phytogeography of india
- Distinguish between motion study and time study
- Differentiate between time study and motion study
- Southeastrans facility portal
- Tpf editor
- Juvenile detention centers in arizona