ACEC Conference Dwayne Weston Chief, Design Branch Walla District September 09, 2016 US Army Corps of Engineers BUILDING STRONG®
Agenda n n n Overview Previous A&E Projects Current/Future Focus How/When/Why to use an A&E Contract Status BUILDING STRONG SM
Our Projects Ice Harbor Lock & Dam Little Goose Lock & Dam Lower Granite Lock & Dam Lower Monumental Lock & Dam Dworshak Dam Mc. Nary Lock & Dam Mill Creek Dam (Bennington Lake) Lucky Peak Dam BUILDING STRONG SM
Walla District n Multi-faceted, well balanced Civil Works District Mission & Business Lines n n n Navigation Hydropower Environmental Stewardship Flood Risk Management Recreation Engaged Globally in GWOT (not as many individuals as in prior years) BUILDING STRONG SM
Previous AE Projects n n n Structural & Mechanical Instrumentation (several sites) Dworshak Fish Hatchery Circular Tank Feasibility Study Hydraulic Modeling – Fork River Structural Gate Hydraulic Steel Structures (HSS) inspections (several sites) Value Engineering Studies (various projects) Lower Granite Waste Water Treatment Plant (WWTP) Design BUILDING STRONG SM
Previous AE Projects (continued) n n n Mc. Nary Potable Water Design Levee Inspections Spill Prevention, Control and Countermeasure (SPCC) plans (6 sites) Lower Granite Juvenile Fish Facility (JFF) Phase 1 a & 1 b design Port of Benton Geotechnical Exploration BUILDING STRONG SM
Previous AE Projects (continued) n n n Lower Granite Barge Moorage Design Dworshak Regulating Outlet (RO) Valve Upgrades Mc. Nary Thrust Bearing Assessment Ice Harbor Downstream Gate Machinery Room Upgrade design Numerous surveys (land hydrographic) BUILDING STRONG SM
Current/Future Focus Areas n n n Project Operation and Maintenance Projects Aging Infrastructure – Navigation Locks DSAC (Dam Safety Action Classification System) Spillway Weirs (juvenile fish passage) Configuration and Operation Plans for fish passage (COPs) Powerhouse Reliability Improvements BUILDING STRONG SM
Potential Upcoming Projects n n n n Groundwater Monitoring Spillway Gates Design Levee Pump Stations Design Upgrade Potable Water System & Water Tank Mechanical Boiler/Heat Exchange Replacement Prototype Spillway Passive Integrated Transponder (PIT) Tag Monitoring System Fish Pump Replacement Gate Repair Pit Upgrades BUILDING STRONG SM
How/when/why for AE work HOW: n AE firms submit SF 330 s in response to Fed. Biz. Ops announcements n District awards Indefinite Delivery, Indefinite Quantity (IDIQ) Contract to AE firms (5 years in duration) n Types are Multidiscipline, Survey (land & hydro), Cost Engineering and Instrumentation n Can use other district’s AE contracts or share (capacity) of our contracts n Task orders are issued against those contracts BUILDING STRONG SM
How/when/why for AE work WHEN/WHY: n For each project, Workload Group decides if the work will be performed in -house or by outsourcing. n Outsourcing includes using other districts, AE firms or using our Design. Build contracts. n Group looks at capacity, capability, maintaining or growing in-house experience, project schedule and project costs. n Note: Almost all survey work is done by an AE BUILDING STRONG SM
Existing A-E Contracts (IDIQ) TYPE FIRM SIZE TIME STATUS Cost Engineering (large) Project Time & Cost $150 M total Base with 4 Option Yrs Option Year 4 Cost Engineering (large) MOCA $50 M total Base with 4 Option Yrs Option Year 4 Cost Engineering (small business) Legis Consultants $20 M total Base with 4 Option Yrs Option Year 4 Cost Engineering (small business) RCECM $20 M total Base with 4 Option Yrs Option Year 4 Survey (primary Hydro)(large) David Evans $10 M total Base with 4 Option Yrs Base Year Survey (primary Hydro)(small) Terra. Sond $10 M total Base with 4 Option Yrs Base Year BUILDING STRONG®
Existing A-E Contracts (IDIQ) TYPE FIRM SIZE TIME STATUS Multi-Discipline Design Services(large) Jacobs Engineering $10 M total Base with 4 Options Yrs Option Year 4 Multi-Discipline Design Services(large) INCA/Anderson $10 M total -Perry Base with 4 Options Yrs Option Year 4 Multi-Discipline Design Services(large) CH 2 M Hill $10 M total Base with 4 Options Yrs Option Year 4 Multi-Discipline Design Services(small) Mc. Millen $5 M total Base with 4 Options Yrs Expired Jun 2016 Multi-Discipline Design Services(small) Harbor Engineering $5 M total Base with 4 Options Yrs Expired Sep 2016 Land Survey (small) Rogers $5 M total Base with 4 Options Yrs Option Year 4 BUILDING STRONG®
Anticipated Future A-E Contracts (IDIQ) TYPE SIZE Structural and Mechanical Instrumentation, Monitoring and $5 M total Analysis (1 firm)(Unrestricted) Multidiscipline (2 small business and 3 unrestricted) $5 M total for each small, $9. 5 M for each unrestricted TIME STATUS Base with 4 Options Yrs In source selection BUILDING STRONG®
Anticipated Future A-E Contracts (IDIQ) TYPE Cost Engineering (5 contracts) (3 unrestricted and 2 small business) Land Survey (1 small business SIZE TIME STATUS $100 M, $45 M, $25 M) (unrestricted) $7. 5 M (for each small business) Base with 4 Options Yrs Goal is to advertise in Sep/Oct 2016 timeframe. $5 M total Base with 4 Options Yrs Goal is to advertise in Oct-Nov 2016 timeframe BUILDING STRONG®
Contact Info AE Questions Mark Jones – 509 -527 -7219 Bob Meyer – 509 -527 -7627 Small Business Development James Glenn – 509 -527 -7202 Federal Business Opportunities (Fed. Biz. Opps)(www. fbo. gov) For Walla, use “W 912 EF” to see our postings BUILDING STRONG SM