ACCU Report News and User Issues Darin Acosta

  • Slides: 15
Download presentation
ACCU Report News and User Issues Darin Acosta (Non-Member State representative) U. S. LHC

ACCU Report News and User Issues Darin Acosta (Non-Member State representative) U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta 1

Advisory Committee of CERN Users � ACCU advises the Director General on the practical

Advisory Committee of CERN Users � ACCU advises the Director General on the practical measures to be taken and administrative internal arrangements to be made by the CERN Management for the utilization of the CERN facilities for research. This concerns in particular the working conditions and the arrangements for technical support to the CERN Users for their activity at the CERN Laboratory. ◦ Quality of life issues at the lab � Committee chair has been Catherine Vander Velde, but likely to be succeeded by Gerjan Bobbink (Dutch delegate) after formal vote in December (he’s the only candidate…) � Committee membership is 1 -2 appointed representatives from each member state, 4 representatives from nonmember states, and 2 CERN staff members LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta �U. S. http: //cern. ch/ph-dep-ACCU/ 2

ACCU Meetings In Past Year � Dec. 7, 2012 (98 th meeting) � March

ACCU Meetings In Past Year � Dec. 7, 2012 (98 th meeting) � March 6, 2013 (99 th meeting) � June 4, 2013 (100 th meeting) � Sept. 11, 2013 (101 st meeting) � Agendas and detailed meeting minutes: ◦ http: //indico. cern. ch/category. Display. py? categ. Id=1058 � Plus see my notes emailed to US LUO shortly after each meeting U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta 3

Housing News �A long term waiting list is now online through the web booking

Housing News �A long term waiting list is now online through the web booking ◦ See tab if unsuccessful in getting a Hostel reservation. ◦ Can only enter list 20 days or more in advance. �B 38 renovation will follow last year’s survey ◦ 80 rooms with toilet and shower (58 CHF), 88 rooms with only washbasin (27 CHF), and 28 shared rooms (14 CHF). �Reminder that washers and driers are available ◦ See reception for card and soap LHC Users Association Meeting, Nov. 8, 2013 �U. S. CERN Shuttle to airport ACCU Report ~ Darin Acosta now stops at Hostel 4

Restaurant News �Novae saw significant increase in sales after renovating B 40 cafeteria area

Restaurant News �Novae saw significant increase in sales after renovating B 40 cafeteria area �Various vending machines placed around CERN for food and other incidentals �Planning to increase capacity of Prevessin cafeteria �The “Kiosk 33” cafeteria area by the CERN tram stop is deemed a failure – not enough visitors. Will be terminated after summer �Payment with credit cards: still working on it U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta 5

Winter Weather � CERN PH Cars: ◦ Winter tires were NOT installed on new

Winter Weather � CERN PH Cars: ◦ Winter tires were NOT installed on new CERN cars last winter. Definitely not advised to drive on icy/snowy roads. ◦ Future cars will have proper winter tires ◦ Current CERN car users have the option to request tire change, BUT a 500 CHF fee is charged � CERN grounds ◦ Last winter was challenging for CERN maintenance ◦ Some incidents with people slipping and falling last winter in high pedestrian traffic areas. ◦ Probably can do better in those areas. To their credit, the crews were good at clearing a path from Gate E for pedestrians walking from St. Genis U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta 6

Bicycle/Pedestrian Access to CERN �Gate C: ◦ An automatic turnstile has been installed to

Bicycle/Pedestrian Access to CERN �Gate C: ◦ An automatic turnstile has been installed to vineyards behind B 40/42 ◦ Open from 6 am to 10 pm, but only weekdays �Gate D, French/Swiss border: ◦ Bicycles currently must cross several times the busy Route de Meyrin to reach St. Genis from Entrance B ◦ Special gate for bicycles to safely reach bike path to St. Genis requires high-level diplomatic solution… �Prevessin: ◦ A protected 3 m wide bike lane from small roundabout to Prevessin site is planned, possible U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta start in 2014 7

CERN Bikes �To rent a bike at CERN, visit building 124 R 001 for

CERN Bikes �To rent a bike at CERN, visit building 124 R 001 for the bike and car pool. �A deposit is required ◦ 100 CHF cash or 400 CHF by TEAM account �Demand for bikes is very high during summer �New policy: 1 CHF/day charge from June. Sept. �Summer usage of bikes: ◦ 733 (2010), 588 (2011), 796 (2012), 717 (2013) �There is also a (free) bike sharing program. Bikes are parked outside CERN by the Reception. Pick up an 2013 RFIDACCUcard from U. S. LHC Users Association Meeting, Nov. 8, Report ~ Darin Acosta 8

Health Insurance � CERN has been investigating inexpensive insurance options for users with coverage

Health Insurance � CERN has been investigating inexpensive insurance options for users with coverage for accidents at work and outside based on positive feedback from a recent survey ◦ UNIQA Accidenta coverage by itself is not considered adequate � Complicated because CERN is not the direct employer of users � Identified one potential company: Allianz ◦ Covers user and family, any age, citizenship, residence, length of association, no medical questionnaire ◦ Worldwide coverage ◦ 100% reimbursement of medical expenses, ambulance, hospitalization with no deductible ◦ Non-urgent medical care is not covered! ◦ 1. 9 euro (2. 36 CHF) per day and person U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta 9

Users Office News � Changes in procedures for 2013: ◦ http: //ph-dep-usersoffice. web. cern.

Users Office News � Changes in procedures for 2013: ◦ http: //ph-dep-usersoffice. web. cern. ch/ph-dep. Users. Office/New. Procedures. Jan 2013. html ◦ Two documents required: �Home institution declaration, Registration Form and Contract � Options for preferred long name on registration is now implemented � End of contract announcements unified between Users Office and IT: now 28 days before expiration � Forwarding of email will stop 6 months after contract expiration � Switzerland is now introducing biometry for Visas. Requires a personal visit to Swiss embassy. Will be valid for 5 years. � Validity of French residence cards to become the contract end date plus 1 month � TEAM leaders please ensure that users return residence documents at the end of their stay U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta 10

CERN Code of Conduct � CERN users are reminded of the code of conduct

CERN Code of Conduct � CERN users are reminded of the code of conduct established in 2010 ◦ http: //cern. ch/codeofconduct � CERN also has an independent Ombudsperson ◦ Vincent Vuillemin ◦ Anyone suspecting harassment is encouraged to contact the CERN Ombudsperson earlier, not later. The ombuds is completely independent and confidential, and can offer advice, etc. Informal. ◦ 104 cases seen in 2011 -12 � The Harassment Investigation Panel (HIP) is a formal body that can take administrative steps in a harassment case. ◦ Independent of Ombudsperson: https: //espace. cern. ch/HIP/default. aspx ◦ Circular OC 9 defines procedure for harassment cases U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta 11

Miscellaneous �Fitness room at CERN: ◦ Despite this being a personal goal of mine

Miscellaneous �Fitness room at CERN: ◦ Despite this being a personal goal of mine and several other U. S. commuters interested in maintaining a healthy lifestyle while traveling, this was rejected by the DG. Investing money in the current fiscal climate “sends the wrong message”. U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta 12

New Student Orientation �I prepared information in the form of slides from various places

New Student Orientation �I prepared information in the form of slides from various places (including ACCU) as a quick reference guide to help your students (and mine!) relocating to CERN from U. S. : ◦ https: //www. usluo. org/cern-guide 2/New. Student. Orientation. At. CERN%281%29. pdf ◦ Preparation before the trip (visas), process to get CERN account and ID, how to get around, emergency numbers, what to expect, … ◦ Please send criticism and suggestions! U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta 13

U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta

U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta 14

Summary �Your CERN user concerns and input are very welcome! ◦ Email: Darin. Acosta@cern.

Summary �Your CERN user concerns and input are very welcome! ◦ Email: Darin. Acosta@cern. ch �Please let me, or my successor, know if you have any matters to raise to ACCU �Next ACCU meeting: Dec. 4, 2013 ◦ Update on child care options ◦ Actually looking for someone to attend the meeting on my behalf as this conflicts with our finals week… U. S. LHC Users Association Meeting, Nov. 8, 2013 ACCU Report ~ Darin Acosta 15