Accompanying Measures Technical Trainings Integrated Solid Waste Management

  • Slides: 6
Download presentation
- Accompanying Measures / Technical Trainings Integrated Solid Waste Management Kutaisi – Accompanying Technical

- Accompanying Measures / Technical Trainings Integrated Solid Waste Management Kutaisi – Accompanying Technical Training – 4 th Training “Municipal Waste Management Planning“ Learning from WM plan reviews (in particular the Sachkhere draft) provided by Jan Reichenbach, International Expert for Solid Waste Management

- Accompanying Measures / Technical Trainings Past homework (the Sachkhere example) • Create WMP

- Accompanying Measures / Technical Trainings Past homework (the Sachkhere example) • Create WMP work group ( - [17]), begin WMP process ( ) • Find example WM plan to become your orientation ( [WM plan Bonisi]) • Start create format for your WM plan - outline / list of content ( ) - visions/objectives, priorities addressed by your WM plan ( ) - limitations and challenges (ø) - chapter on legal references/framework ( ) (relevant documents/stipulations only, no copy & paste of entire text!! ) • Collect data on SWM status quo, and as much as possible on quantities ( ) • Collect information relevant for future development dynamics (ø) • Draft chapters with status information ( ) - coverage, territorial data, status quo of collection, disposal, equipment, costs ( ) • Finalize chapter drafts for status part ( Mar. /Apr. ’ 17) WMP training 4 th Training, March 22. /23. , 2017 2

- Accompanying Measures / Technical Trainings Feedback by other municipalities (Look on achievements) •

- Accompanying Measures / Technical Trainings Feedback by other municipalities (Look on achievements) • Collection/compilation of status information No achievements reported up until Feb. 2017 Khoni (���� ) No proof on compiled data documents up until Feb. 2017 Baghdati (������� ), Oni (��� ) • Status information on finance No proof on compiled data other than this up until Feb. 2017 Ambrolauri M. (����� ), Tskaltubo (���� ), Kharagauli (������� ) • Draft WM plan Draft chapters presented: Kutaisi (������� ), Sachkhere (������� ) just delivered: Chiatura (������� ), Lentekhi (������� ), Ambrolauri town (�. ����� ), Tsageri (������ ) WMP training 4 th Training, March 22. /23. , 2017 3

- Accompanying Measures / Technical Trainings Feedback by other municipalities • Some issues municipalities

- Accompanying Measures / Technical Trainings Feedback by other municipalities • Some issues municipalities should take along in the WMP process Ambrolauri town (�. ����� ): airport development - infrastructure measure waste generation impact pioneer spot to exercise waste separation from the start Ambrolauri Municipality (����� ): „municip. could go well together with the town” - goes towards ‘measures for cooperation with other municipalities’ (Art. 13 waste code) Oni (��� ) / Lentekhi (������� ) / Tkibuli (������� ): „ten times more people in summer season“ - needs instruments for waste avoidance and to make tourists contribute to the costs of waste management Tsageri (������ ) / Vani (���� ) / Zestaphoni (����� ): Population decreases significantly - waste generation impact review and optimization of service/container provision WMP training 4 th Training, March 22. /23. , 2017 4

- Accompanying Measures / Technical Trainings Brief evaluation of Sachkhere draft General principles of

- Accompanying Measures / Technical Trainings Brief evaluation of Sachkhere draft General principles of structuring WM plan are understood Includes very helpful additional components (e. g. list of terms) Focus and relevance of information must be enhanced Important elements at document outset are not sufficiently apparent (e. g scope of WM plan) or still missing • Instead too many repetitions yet • Critical statements/figures often lack an explanation (or sufficiently clear substantation how they were derived) • Too much a retrospective style is adopted, • • meaning of information for future developments and planning does not come out enough • • • Bit of a copy/paste approach can be seen / some references are missing Certain data inconsistencies must be cleared and overcome Statements need to be improved with regard to measurable quality Status and planning information sometimes intermingle Good basis worth to continue with WMP training 4 th Training, March 22. /23. , 2017 5

- Accompanying Measures / Technical Trainings Let‘s continue with the full (translated) document and

- Accompanying Measures / Technical Trainings Let‘s continue with the full (translated) document and a look onto the comments. . WMP training 4 th Training, March 22. /23. , 2017 6