Accelerator Division Status Duane Newhart All Experimenters MeetingLab
Accelerator Division Status Duane Newhart All Experimenters’ Meeting/Lab Status Meeting 02 July 2018
Accelerator Operations Summary From: June 25, 2018 (0000 hours) To: July 02, 2018 (0000 hours) Calendar Week # 26 2 9/7/2021 Nu. MI Weekly Integrated Intensity Beam Hours To Nu. MI 1. 93 E 19 protons 158. 2 hours BNB Weekly Integrated Intensity Beam Hours To BNB 7. 84 E 18 protons 157. 8 hours Muon Weekly Integrated Intensity Beam Hours To Muon 4. 18 E 18 protons 119. 0 hours MTest Weekly Integrated Intensity Beam Hours To MTest 1. 59 E 13 protons 43. 8 hours MCenter Weekly Integrated Intensity Beam Hours To MCenter 2. 10 E 12 protons 44. 7 hours Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
Nu. MI Operation 3 9/7/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
BNB Operation 4 9/7/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
Muon Operation 5 9/7/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
Complex Status • Booster Neutrino Beamline (BNB) • LINAC – Taking beam – Running well • Switchyard • Booster – Meson Test taking beam – MCenter began on Wednesday – Running well • MI/RR – Running well • Muon Campus – G-2 taking beam – Beam studies on Tuesday • Nu. MI – Monitoring Nu. MI target (TA-02) helium leak • General – Summer Shutdown starts July 9 • Beam off on July 7 for cooldown 6 9/7/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
PIP-II Injector Test & FAST/IOTA Status • PIP-II Injector Test – Shutdown for Cryogenic Transfer Line (CTL) installation – Continuing to qualify cavities for SSR 1 at MDB • FAST/IOTA • Checkout of the FAST beamline has begun. – All quad and trim magnets in the 50 and 300 Me. V lines are on. – The RF Group started warmup of the klystron filaments to all 4 stations. • ORC to begin cooldown has been approved. – Expect the Cave to become ODH 1 on Tuesday. – Pumpdown of the CC 1, CC 2, and Cryomodule insulating vacuum systems has begun. • Beam operations are schedule to begin in July. 7 9/7/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
CMTS 1 Status • LCLSII Cryomodule F 1. 3 -08 – Testing complete • Unit test (all 8 cavities at ~16 MV/m) plus magnet coils powered to 20 A is in progress at this time • Removal this week • LCLSII Cryomodule F 1. 3 -10 – Installation this week • Testing in 2 weeks 9 9/7/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
Power Outages 10 9/7/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
Power Outages 11 9/7/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
Power Outages 12 9/7/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
Power Outages 13 9/7/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
Schedules and Links • Schedule can be accessed from the Operations Department Home Page – Schedules -> Operations Schedule • Direct link to schedule – http: //www-ad. fnal. gov/ops/schedule. html 14 9/7/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
- Slides: 13