Accelerator Division Status Duane Newhart All Experimenters MeetingLab
Accelerator Division Status Duane Newhart All Experimenters’ Meeting/Lab Status Meeting 03 April 2017
Accelerator Operations Summary From: March To: April 27, 2017 (0000 hours) 03, 2017 (0000 hours) Calendar Week # 13 Nu. MI Weekly Integrated Intensity Beam Hours To Nu. MI 2 12/13/2021 1. 86 E 19 protons 154. 1 hours BNB Weekly Integrated Intensity Beam Hours To BNB 9. 77 E 18 protons 155. 4 hours NMuon Weekly Integrated Intensity Beam Hours To NMuon 4. 25 E 16 protons 155. 3 hours MTest Weekly Integrated Intensity Beam Hours To MTest 9. 04 E 14 protons 106. 4 hours MCenter Weekly Integrated Intensity Beam Hours To MCenter 3. 00 E 12 protons 58. 0 hours Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
Nu. MI Operation 4 12/13/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
BNB Operation 5 12/13/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
Complex Status • Booster Neutrino Beamline (BNB) • LINAC – Running well • Switchyard • Booster – MTest, Mcenter, Sea. Quest – Running well • General • MI/RR – Slipstacking 6+6 – BV 852 access • Nu. MI – Focusing on staying above 641 k. W with Switchyard running 6 12/13/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting – Downtime Planned • Late April planned • Interlock Safety System tests are coming due. Opportunistic for now. – Did Linac and Booster on Friday – More to come
PIP-II Injector Test & FAST Status • PIP-II Injector Test • FAST – Commissioning • Beam studies ongoing • Reinstalled Fast Faraday Cup – Measure longitudinal properties • Install new chopper module this week – Extra machine protection – Install more of MEBT 8 12/13/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting – 300 Me. V beamline construction continues: • The LCW manifolds were disconnected from the quads in the 300 Me. V line and the quad tops were craned off to facilitate beamtube installation. • Assembly of the vacuum and TPM stands has begun. • The proton source has an electrical ORC review at 13: 00 today. • Vacuum certification of components continues.
CMTS 1 Status • LCLSII Prototype Cryo Module – Waiting on delivery – Cryo module testing • Early April 9 12/13/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting
Schedules and Links • Schedule can be accessed from the Operations Department Home Page – Schedules -> Operations Schedule • Direct link to schedule – http: //www-ad. fnal. gov/ops/schedule. html 10 12/13/2021 Duane Newhart | All Experimenters’ Meeting/Lab Status Meeting