Accelerator Division Status Daniel Johnson All Experimenters MeetingLab
Accelerator Division Status Daniel Johnson All Experimenters’ Meeting/Lab Status Meeting 13 November 2017
Accelerator Operations Summary From: November To: November 06, 2017 (0000 hours) 13, 2017 (0000 hours) Calendar Week # 45 2 12/19/2021 Nu. MI Weekly Integrated Intensity Beam Hours To Nu. MI 1. 74 E 15 protons 15. 1 hours BNB Weekly Integrated Intensity Beam Hours To BNB 1. 10 E 19 protons 140. 9 hours Muon Weekly Integrated Intensity Beam Hours To Muon 0. 00 E 00 protons 0. 0 hours MTest Weekly Integrated Intensity Beam Hours To MTest 1. 72 E 13 protons 25. 1 hours MCenter Weekly Integrated Intensity Beam Hours To MCenter 0. 00 E 00 protons 0. 0 hours Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
Nu. MI Operation 3 12/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
BNB Operation 4 12/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
Muon Operation 5 12/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
Complex Status • LINAC • Switchyard – Investigating LRF 3 MARX trips – Beam established – Meson Test Operation • Booster – Tuning continues • Muon Campus • MI/RR – Tunnel work wrapping up – Startup studies – RR beam scrubbing – Quad moves • Transport Gate moved • Power leads covered – Paperwork and startup this week • General • Nu. MI – V 108 -4 Replaced – Target Scans Completed – Prepare for full operation – Tuesday Eve • Booster Neutrino Beamline (BNB) – Increasing intensity – Ran at 5 Hz 6 12/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
PIP-II Injector Test & FAST Status • PIP-II Injector Test • FAST – Performed 24 hour run • 10 m. A high power operation • 5 ms pulse at 20 Hz to a prototype absorber • Collected more data prior to shutdown – Shutdown started Nov 13 for ~2 weeks • Install a Differential Pumping Insert (DPI) • Test isolation of two vacuum regions with different requirements 7 12/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting – Commissioning of the 300 Me. V beamline – 258 Me. V electron beam through SRF linac • Propagated it point of injection to IOTA. • Milestone: 150 Me. V injection energy of IOTA. – Gradually increasing electron beam energy toward 300 Me. V – Turning off December 1 st, 2017
CMTS 1 Status • LCLSII Prototype Cryo Module – F 1. 3 -06 • Testing complete • Warmup in progress • Next cryomodule for testing being installed next week 8 12/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
Schedules and Links • Schedule can be accessed from the Operations Department Home Page – Schedules -> Operations Schedule • Direct link to schedule – http: //www-ad. fnal. gov/ops/schedule. html 9 12/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
- Slides: 9