Accelerator Division Status Daniel Johnson All Experimenters’ Meeting/Lab Status Meeting 30 April 2018
Accelerator Operations Summary From: April 23, 2018 (0000 hours) To: April 30, 2018 (0000 hours) Calendar Week # 17 2 9/19/2021 Nu. MI Weekly Integrated Intensity Beam Hours To Nu. MI 1. 51 E 19 protons 127. 9 hours BNB Weekly Integrated Intensity Beam Hours To BNB 6. 97 E 18 protons 131. 7 hours Muon Weekly Integrated Intensity Beam Hours To Muon 4. 31 E 18 protons 127. 9 hours MTest Weekly Integrated Intensity Beam Hours To MTest 5. 32 E 14 protons 96. 9 hours MCenter Weekly Integrated Intensity Beam Hours To MCenter 0. 00 E 12 protons 0. 0 hours Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
Nu. MI Operation 3 9/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
BNB Operation 4 9/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
Muon Operation 5 9/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
Complex Status • LINAC • Switchyard – Laser Notcher operational • Booster – Tuning continues • MI/RR – Tuning continues – MI 52 vacuum bursts – Meson Test operating • Muon Campus – G-2 operating • General • Residual Gas Analyzer (RGA) Scans • Residual Fluorinert? • Nu. MI – ~640 k. W with SY – >720 k. W without SY – Lower now with vacuum issues • Booster Neutrino Beamline (BNB) – Stable operation 6 9/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
PIP-II Injector Test & FAST/IOTA Status • PIP-II Injector Test • FAST/IOTA – Starting Up • All RF components operating in CW mode • Up to 5 m. A, 3. 5 ms, 20 Hz – Upgrading MPS to increase pulse width • Studies have gone smoothly – Continuing to look at longer pulse operation – Lattice Measurements • May/June Cryo work shutdown – Staging cryo piping in preparation 7 9/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting – IOTA RF cavity work continues – Injection line magnet power supplies are being connected to their controllers – Instrumentation is phasing BPM cables – There was an ORC done for the dipole bend supply – Safety system testing last Friday – Checkout of the ring correctors has started
CMTS 1 Status • LCLSII Cryomodule F 1. 3 -09 – Module performed well – Warmed Up – Cryo plant repairs on schedule • Pressure tested circuits & passed • Plant assembly this week • LCLSII Cryomodule F 1. 3 -08 – Weeks away 8 9/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
MI-8 Domestic Water Repair • Pipe looks a little rough – 3” hole • Repair clamp • Anode bag 9 9/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting
Schedules and Links • Schedule can be accessed from the Operations Department Home Page – Schedules -> Operations Schedule • Direct link to schedule – http: //www-ad. fnal. gov/ops/schedule. html 10 9/19/2021 Daniel Johnson | All Experimenters’ Meeting/Lab Status Meeting