A SOLUTION TO WASTE DISPOSAL Managing Solid Waste

  • Slides: 15
Download presentation
A SOLUTION TO WASTE DISPOSAL

A SOLUTION TO WASTE DISPOSAL

Managing Solid Waste Disposal in a faster, cheaper and cleaner while benefiting the environment

Managing Solid Waste Disposal in a faster, cheaper and cleaner while benefiting the environment REDUCING waste to landfill by disposal at source 2020

Our Solution We Break into 2 phases Phase Black. HOLETM Introducing a decentralized waste

Our Solution We Break into 2 phases Phase Black. HOLETM Introducing a decentralized waste disposal solution so that waste generated can be dispose in a quick, clean & cheap manner Phase Waste-2 -Energy Generated Waste to be converted into renewable energy which can be channel to remote using our technology

Black. HOLE SELF POWERED • ZERO FUEL is required for waste decomposition 100 ton/day

Black. HOLE SELF POWERED • ZERO FUEL is required for waste decomposition 100 ton/day Multiple Capacity ( 24 hours) : • 2 ton • 5 ton • 10 ton • 50 ton • 100 ton Patented #9518733 ( 151 Country) Technology : United States of America Manufacturing & Assembly : Malaysia Core Magnet Manufacturing : Bangalore, India <>850 Celsius Depending on type of waste , the temperature has been captured between 350 to 850 degrees Material CAN • MSW such as paper , plastic , packaging , food , landscaping waste, CANNOT • Cannot decompose metals, solid , ceramics , glasses

Benefits of the Solution Clean • Waste can be DISPOSE at SOURCE Mobile Cheap

Benefits of the Solution Clean • Waste can be DISPOSE at SOURCE Mobile Cheap • The unit can be EASILY MOVED and placed in strategic locations • NO CAPEX • Lower OPEX • SAVINGS to SWcorp Reduce • Output is REDUCED to about 2 % • Prevent illegal dumping Ease • Waste containing dry and wet waste can be mix together.

Black. HOLE vs INCINERATOR BLACKHOLE INCINERATOR Plasma Heat decomposition with Flame combustion which requires

Black. HOLE vs INCINERATOR BLACKHOLE INCINERATOR Plasma Heat decomposition with Flame combustion which requires a lot of controlled oxygen supplied thru magnetic heat and energy valve Technology BLACKHOLE INCINERATOR Does not require fuel or electricity to decompose the waste Require average of 40 liter/hour of diesel for combustion which results in high operating cost BLACKHOLE INCINERATOR Due to controlled oxygen in the flow technique , dioxin bonds are broken which prevents harmful emission Secondary combustion chamber is required where additional diesel is needed to burn off the dioxin Method Emission

Process

Process

Mobile Model – 2 ton Machine Mobile 2 Ton Can be easily transported using

Mobile Model – 2 ton Machine Mobile 2 Ton Can be easily transported using our open top container ( 20 Lx 10 Wx 12 H) Maximum Weight : 3 ton ( with load) Suitable to be used during events, function Waste can be disposed at source without the need wait for collection Operated by Alam Avani Sdn Bhd

PHASE 2 : Waste – 2 - ENERGY Combining our patented technology , our

PHASE 2 : Waste – 2 - ENERGY Combining our patented technology , our solution is able to generate up to 25 KWH of Electricity ( from 2 ton ) which can be either sold back to the government or provide electricity to rural area’s which would help the upbringing of the community Key Benefits Energy Generation doesn’t depend on calorific value of the waste Any type of waste can generate electricity Energy Generation is consistent with any volume Segregation is not required No additional fuel Operational cost is low Minimal Wear & tear

Financial Proposal to SWCorp ECOKarls /Alam Avani Sdn Bhd SWCorp Agreement Period *Negotiated terms

Financial Proposal to SWCorp ECOKarls /Alam Avani Sdn Bhd SWCorp Agreement Period *Negotiated terms between 5 years to 12 years Charges per day *Negotiated terms between RM 1200 to RM 1800 * Based on ton from 2 ton to 15 ton First 3 months ( Emission Monitoring & Control. Ensuring ZERO EMISSION ) NO COST, NO COMMITMENT from SWCorp for 3 months Current Cost : RM 2100 per day ( 15 ton X RM 140 ) Alam Avani : RM 1600 ( 15 ton per day ) SAVINGS RM 180, 000 per annum Saving calculation: RM 500 x 30 Hari x 12 bulan All cost including technology , infrastructure readiness and operation will be undertaken by Alam Avani NO upfront CAPEX or FUNDING from SWCorp WTE After 6 months 25 Kw. H ( Infrastucture cost to be bourned by Alam Avani Sdn Bhd ) 10 % of Feed-in-Tariff to be shared back to SWCorp Day to day operation and disposal. Bottom ash will be disposed by Alam Avani ( monthly )) Minimal involvement from Waste Collector

Ash Analysis( TCLP )

Ash Analysis( TCLP )

Emission Report

Emission Report

Emission Report

Emission Report

Thank You 2016

Thank You 2016