A High Eta Forward Muon Trigger Tracking detector

  • Slides: 34
Download presentation
A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma for

A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma for Duccio Abbaneo, Stephane Bally, Hans Postema, Antonio Conde Garcia, Jean Paul Chatelain, Gerard Faber, Leszek Ropelewski, Serge Duarte Pinto, Marco Villa, Gabriel Croci, Matteo Alfonsi, Miranda Van Stenis, Sunil Kumar, Krishna P, Archana Sharma CERN Geneva Switzerland Stefano Bianco, Stefano Colafranceschi, Luigi Benussi, Franco Fabbri, Davide Piccolo, Giovanna Saviano LNF Frascati, Italy Nicola Turini, Eraldo Oliveri, Guido Magazzu Universita' Degli Studi di Siena INFN, Sezione di Pisa, Italy Andrey Marinov, Michael Tytgat, Nicolas Zaganidis Gent University, Gent, Belgium Marcus Hohlmann and Kondo Gnanve Dept. of Physics and Space Sciences Florida Institute of Technology Melbourne, FL 32901 USA Yong Ban, Haiyun Teng, Jingxin Cai Peking University Beijing China Archana. Sharma@cern. ch 12 th Topical Seminar on Innovative Particle and Radiation Detectors (IPRD 10) 7 - 10 June 2010 Siena, Italy

RD 51 Mini Week July 19 -21, 2010 2

RD 51 Mini Week July 19 -21, 2010 2

RD 51 Mini Week July 19 -21, 2010

RD 51 Mini Week July 19 -21, 2010

CONSTRUCTION OF LARGE PROTOTYPE RD 51 Mini Week July 19 -21, 2010

CONSTRUCTION OF LARGE PROTOTYPE RD 51 Mini Week July 19 -21, 2010

RD 51 Mini Week July 19 -21, 2010

RD 51 Mini Week July 19 -21, 2010

Velocity field PROBLEMS. . … ric t e m Fiel d ym s a

Velocity field PROBLEMS. . … ric t e m Fiel d ym s a is Reducing inlets diameters (1 mm) the velocity field is more uniform but slower in the sector 3 and 4

RD 51 Mini Week July 19 -21, 2010

RD 51 Mini Week July 19 -21, 2010

RD 51 Mini Week July 19 -21, 2010

RD 51 Mini Week July 19 -21, 2010

CMS Prototype GEM - Stack 9

CMS Prototype GEM - Stack 9

CMS Prototype GEM - Stack 10

CMS Prototype GEM - Stack 10

CMS Prototype GEM - Test Box Large Drift Electrode Sample under test Jean-Paul Chatelain

CMS Prototype GEM - Test Box Large Drift Electrode Sample under test Jean-Paul Chatelain

Ongoing Drift Electrode Tests RD 51 Mini Week July 19 -21, 2010

Ongoing Drift Electrode Tests RD 51 Mini Week July 19 -21, 2010

All I/V scans RD 51 Mini Week July 19 -21, 2010

All I/V scans RD 51 Mini Week July 19 -21, 2010

Honeycomb GEM studies without the honeycomb between drift and first gem 14

Honeycomb GEM studies without the honeycomb between drift and first gem 14

counts Analysis of GEM spectrum ‘X displacement’ <adc channel> mm

counts Analysis of GEM spectrum ‘X displacement’ <adc channel> mm

Moving the GEM (under x rays) along x, y direction with 0, 25 mm

Moving the GEM (under x rays) along x, y direction with 0, 25 mm steps

CMS single mask GEM 1 Marco Villa

CMS single mask GEM 1 Marco Villa

Single GEM Electrodes TOP GEM 1 Top – Left Bottom - Right GEM 2

Single GEM Electrodes TOP GEM 1 Top – Left Bottom - Right GEM 2 GEM 3 Siena June 2010 18 BOTTOM

…and cross section pictures (1) TOP Sample 1 Sample 2 Siena June 2010 19

…and cross section pictures (1) TOP Sample 1 Sample 2 Siena June 2010 19 BOTTOM

…and cross section pictures (2) TOP Sample 3 Sample 4 Siena June 2010 20

…and cross section pictures (2) TOP Sample 3 Sample 4 Siena June 2010 20 BOTTOM

Preparing the experimental setup Drift 3. 05 mm GEM 1 Anode Siena June 2010

Preparing the experimental setup Drift 3. 05 mm GEM 1 Anode Siena June 2010 2. 15 mm • GEM active area: 10 x 10 cm 2 • Gas mixture: Ar/CO 2 70/30 • Gas flow: ~ 5 l/h • Water content: ~ 100 ppm H 2 O • Radiation source: Cu X–ray tube 21

Taking spectra • Ed = 2 k. V/cm • Ei = 3 k. V/cm

Taking spectra • Ed = 2 k. V/cm • Ei = 3 k. V/cm • DV GEM = 480 V • Rate ~ 32 Hz/mm 2 • Energy resolution @ 8. 04 ke. V ~ 19. 6 % FWHM/peak Siena June 2010 22

Measuring the gain curve • Ed = 2 k. V/cm • Ei = 3

Measuring the gain curve • Ed = 2 k. V/cm • Ei = 3 k. V/cm • Rate ~ 180 k. Hz/mm 2 • Spark voltage ~ 530 V • Max gain ~ 1080 Siena June 2010 23

42 cm x 990 cm RD 51 Mini Week July 19 -21, 2010 24

42 cm x 990 cm RD 51 Mini Week July 19 -21, 2010 24

Serge FERRY-4/06/2010 LGEM PROCESS by single mask method 1 Base material 50 µm polyimide

Serge FERRY-4/06/2010 LGEM PROCESS by single mask method 1 Base material 50 µm polyimide foil copperclad 2 Photoresist lamination, masking, exposure, development 3 Chemical etching of copper Top 4 Polyimide etching in 2 steps 5 Electrochemical etching of copper Bot + over-etched 6 Polyimide etching to transform hole geometry 7 Photoresist lamination, masking, exposure, development to define electrodes 8 Chemical etching of copper Top and Bot, Cleaning and electrical test -The LGEM are actually in step 5.

CMS High Eta Upgrade Studies Test Beam Plan 2010 Chambers for June: (SEE Stefano’s

CMS High Eta Upgrade Studies Test Beam Plan 2010 Chambers for June: (SEE Stefano’s talk tomorrow) CMS Triple GEM prototype 10 x 10 cm Honeycomb Triple GEM Single Mask GEM 1. Measure Efficiency for perpendicular tracks 2. Measure Efficiency for inclined tracks with tracking 3. Optimization of time resolution 4. Tests with Front End electronics for mips 5. Space and time resolution October 1. Gas Studies 2. Magnetic Field Operation 3. Large Prototype test RD 51 Mini Week July 19 -21, 2010 26

The setup • • • Tracking: Standard GEMs chambers: T 1, T 2, T

The setup • • • Tracking: Standard GEMs chambers: T 1, T 2, T 3 Data-taking: GEMs chambers have been tested: s l i “Timing chamber” a t e d r Y o f “Honeycomb chamber ” R k A l a N t I s M ’ I “Single mask chamber” o L n E a f R e t P S Gas mixtures used: ee S 1. Ar(70%) + CO 2(30%) 2. Ar(45%) + CO 2(15%) + CF 4(40%) Mixture] RD 51 Mini Week July 19 -21, 2010 [LHCb 27

Beam Test June 2010 – Preliminary Online Results Summary

Beam Test June 2010 – Preliminary Online Results Summary

Summary Results for Ar-CO 2 70 -30 Efficiency scan Eff. /Gain E R M

Summary Results for Ar-CO 2 70 -30 Efficiency scan Eff. /Gain E R M I L P Timing GEM RD 51 Mini Week July 19 -21, 2010 A IN Y R

Summary Results for Ar-CO 2 70 -30 RMS of the arriving time vs Gain

Summary Results for Ar-CO 2 70 -30 RMS of the arriving time vs Gain E R M I L P Timing GEM RD 51 Mini Week July 19 -21, 2010 A IN Y R

Summary Results for Ar-CO 2 -CF 4 15 -45 -40 and gaps 3/2/2/2 mm

Summary Results for Ar-CO 2 -CF 4 15 -45 -40 and gaps 3/2/2/2 mm Efficiency scan vs Gain E R M I L P Timing GEM RD 51 Mini Week July 19 -21, 2010 A IN Y R

Summary for the last Eff scan with new spacers 3/1/2/1 mm and LHCb gas

Summary for the last Eff scan with new spacers 3/1/2/1 mm and LHCb gas E R M I L P Timing GEM RD 51 Mini Week July 19 -21, 2010 A IN Y R

Honeycomb GEM Data analysis continues E R M I L P RD 51 Mini

Honeycomb GEM Data analysis continues E R M I L P RD 51 Mini Week July 19 -21, 2010 A IN Y R

STATUS AND OUTLOOK 1. Prototype (standard, honeycomb, single mask) tests in lab, beam continue

STATUS AND OUTLOOK 1. Prototype (standard, honeycomb, single mask) tests in lab, beam continue 2. Beam tests and analysis 2010 – continue 3. Detail mechanical design for mock up and proto ~ final 4. Definition of readout, electronics and its mechanical support - ongoing Services and routing HV, Gas, LV, cooling - ongoing 5. Mockup realization of detector Done, some details missing 6. Production of prototype – expected to be completed by end of June 7. Tests of prototype 8. Feasibility / simulation studies of integration with CMS trigger and. Week tracking – to 2010 be done (not yet started) RD 51 Mini July 19 -21,