3 GPP TSG SA Meeting 86 Sitges Spain

  • Slides: 5
Download presentation
3 GPP TSG SA Meeting #86 Sitges, Spain, 10 -13 December 2019 SP-191296 SA

3 GPP TSG SA Meeting #86 Sitges, Spain, 10 -13 December 2019 SP-191296 SA 2 Rel-17 Prioritization © 3 GPP 2012 Puneet Jain SA 2 Chairman, Intel TSG SA#86 Sitges, Spain, December 10 - 13, 2019 © 3 GPP 2019 1

WIDs – IN (Sep, 2020) Target Study Completion Total TUs Available for Rel 17

WIDs – IN (Sep, 2020) Target Study Completion Total TUs Available for Rel 17 work FS_5 GSAT_ARCH FS_e. NA_ph 2 FS_e. NPN FS_MUSIM FS_enh_EC FS_5 G_Pro. Se FS_5 MBS FS_e. NS_ph 2 FS_e. V 2 XARC_ph 2 FS_IIo. T 5 G_AIS Dec-19 Mar-20 Jun-20 Mar-20 Jun-20 Mar-20 Total TU Requested in 2020 (Study + Normative) 4 13. 2 + 9. 3 11 + 6 5+2 8+7 15 + 8. 5 18 + 12 4+3 4+2 6 + 5. 5 2 Total TU after down scoping in 2020 (Study + Normative) Jan, 20 #136 AH Feb, 20 #137 Apr, 20 #138 May, 20 #139 (last meeting for study ) Aug, 20 #140 13. 5 14. 5 19 22 25 4 (1 + 3) 8. 9 (5 + 3. 9) 1 10. 25 (6. 5 + 4. 25) 2 6 (4. 5 + 1. 5) 1 © 3 GPP 2012 10. 5 (5. 5 + 5) 1 15. 5 (9 + 6. 5) 2 20. 4 (12. 4 + 8) 2 6 (4 + 2) 1 3. 5 (2 + 1. 5) 6 (4 + 2) 1 2 1 2 2 2 1. 5 1 1 2 2. 5 1. 5 2 3 1. 5 1 1 1+2 2 1 2 3 3 1 1 1 2 2. 25 1. 5 3 2 2 2 1. 5 2 1 2. 5 1 2 3 4. 75 TU Available for IN* items Comment (4. 5 overflow) (8. 4 overflow) NOTE: TU allocation per meeting is shown as an example. Each WID be allocated at minimum requested TUs but TU allocation per meeting may change. TSG SA#86 Sitges, Spain, December 10 - 13, 2019 © 3 GPP 2019 2

WIDs – IN (Dec, 2020) Target Study Completi on Total TUs Available for Rel

WIDs – IN (Dec, 2020) Target Study Completi on Total TUs Available for Rel 17 work FS_5 GSAT_ARCH FS_e. NA_ph 2 FS_e. NPN FS_MUSIM FS_enh_EC FS_5 G_Pro. Se FS_5 MBS FS_e. NS_ph 2 FS_e. V 2 XARC_ph 2 FS_IIo. T 5 G_AIS Dec-19 Mar-20 Jun-20 Mar-20 Jun-20 Mar-20 Total TU Requested in 2020 (Study + Normative) 4 13. 2 + 9. 3 11 + 6 5+2 8+7 15 + 8. 5 18 + 12 4+3 4+2 6 + 5. 5 2 Total TU after down scoping in 2020 (Study + Normative) Jan, 20 #136 AH Feb, 20 #137 13. 5 14. 5 4 (1 + 3) 8. 9 (5 + 3. 9) 10. 25 (6. 5 + 4. 25) 6 (4. 5 + 1. 5) 10. 5 (5. 5 + 5) 15. 5 (9 + 6. 5) 20. 4 (12. 4 + 8) 6 (4 + 2) 3. 5 (2 + 1. 5) 6 (4 + 2) 2 Total TU Available for IN* items 1 1 1© 3 GPP 2012 1 1 1 2 2 5. 5 6. 5 Apr, 20 #138 May, 20 #139 Aug, 20 #140 Oct, 20 #141 Nov, 20 #142 19 22 25 1 1 2 3 1. 5 1 3 3 1. 5 1 1 1 2. 5 1. 5 2 3 2 1 2 2 3 1 1. 5 1 1 1 2 2. 25 7. 5 5. 5 9 4. 5 8. 25 3 2. 5 3 1 1 1 NOTE: TU allocation per meeting is shown as an example. Each WID be allocated at minimum requested TUs but TU allocation per meeting may change. TSG SA#86 Sitges, Spain, December 10 - 13, 2019 © 3 GPP 2019 3

Way Forward (to be updated) Reduce 2 TUs from FS_5 MBS study phase. Determine

Way Forward (to be updated) Reduce 2 TUs from FS_5 MBS study phase. Determine whether FS_e. NS_ph 2, FS_e. V 2 XARC_ph 2 needs to be down scoped. Agree that FS_e. NPN, FS_5 G_Pro. Se and FS_5 MBS will be granted 1 Qtr exception. • Agree that at maximum 1 Qtr exception will be granted. Determine additional Available TU to be allocated to which IN* item. • There is scope to add only 1 IN* item unless further down scoping of IN items is undertaken. © 3 GPP 2012 TSG SA#86 Sitges, Spain, December 10 - 13, 2019 © 3 GPP 2019 4

Thank You! © 3 GPP 2012 TSG SA#86 Sitges, Spain, December 10 - 13,

Thank You! © 3 GPP 2012 TSG SA#86 Sitges, Spain, December 10 - 13, 2019 © 3 GPP 2019 5