24 27 Sep 2018 Fahud Lekhwair Hazard Hunt

  • Slides: 15
Download presentation
24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud & Lekwhair Hazard Hunt

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud & Lekwhair Hazard Hunt 24 th – 27 th September 2018 MSEM Partnership in HSE 2018 Top 9 HSE exposures Hazard Hunt

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt GOOD PRACTICES LOTO procedure being

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt GOOD PRACTICES LOTO procedure being followed and implemented in the right way Fahud & Lekwhair Good housekeeping Lifting equipments being inspected and certified Ladder is blocked, so indicating that (DO NOT USE) as in Tag-out Handrails installed and Zebra lines clearly marked at SAS

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud Engagement coaching moments

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud Engagement coaching moments

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud Fire Extinguisher Sign Board

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud Fire Extinguisher Sign Board without the Extinguisher its self (Natih Station) No Fall Protection (Double Push Bar) at the Fixed Ladder

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud No excavation sign/ no

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud No excavation sign/ no barricading/ Unsafe access/ in-secured ladder, Tripping , Slipping & Falling hazard Sharp object – missing mushroom cap

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud Equipment uncovered/unsaf eguarded Missing

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud Equipment uncovered/unsaf eguarded Missing LOTO procedure – untagged isolated valve Pipelines (Flow Direction) is Unlabelled Isolated/Not Operated Valves (As per HSE Advisor) but no Lock-out/Tag-out

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud Potentiality for Dropped/falling objects

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud Potentiality for Dropped/falling objects – Natih gathering station Dropped/falling objects (missing scaffold plate) from platform

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud Potentiality for Dropped/falling objects

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Fahud Potentiality for Dropped/falling objects – Natih gathering station Using wrong lifting equipments/accessories, missing taglines Improper Material is Used Tripping Hazard

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Lekwhair Over stacked SAS warehouse,

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Lekwhair Over stacked SAS warehouse, no detectors, no water sprinkles, emergency exit not functioning Unsafe storage of batteries – Galfar has left this behind. SAS to meet with Galfar to have this safely disposed

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Lekwhair Poor housekeeping – Galfar

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Lekwhair Poor housekeeping – Galfar has left this behind. SAS to meet with Galfar to have this safely managed Tripping & falling hazard

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Lekwhair unlabeled confined space entry

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Lekwhair unlabeled confined space entry Unsecured cylinders

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Lekwhair Unlabeled bottles/containers. Occupational health

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Lekwhair Unlabeled bottles/containers. Occupational health hazard

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Lekwhair (Mathkhor) Chemical storage area

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Lekwhair (Mathkhor) Chemical storage area – missing/not in use containment

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Summary • • The program

24 -27 Sep 2018 Fahud & Lekhwair Hazard Hunt Summary • • The program was well received and supported by the site team. kick off meeting (HH background, objective & deliverables) was attended by ONE 21 L, ONO 9 L, ONO 1 L, ONE 21 F, ONO 9 F, ONO 1 F and main contractors’ representatives (AL Haditha, Najd Al Ahliya, Sayh Al Saryah and STS). The program TOR were clearly highlighted to all and a very positive feedback was received. No significant observations/ findings were noted during the site visits. Majority were repeated , very minor and few of them were tackled/corrected on spots. A total of 9 hazard hunt coaching sessions were conducted to 95 participants from both PDO and Contractors on various aspects/techniques of hazards hunting.