2021 International Horticultural Expo Preparatory Report Yangzhou People’s Government

2021 International Horticultural Expo Preparatory Report Yangzhou People’s Government

Basic Information • Name:International Horticultural Exposition 2021 Yangzhou • Short as:Expo 2021 Yangzhou •

Basic Information • Name:International Horticultural Exposition 2021 Yangzhou • Short as:Expo 2021 Yangzhou • Category:B • Theme: Green City, Healthy Life • Opening:April 2021 • Closing:October 2021 • Duration: 180 days • Site Location :Zaolinwan, Yangzhou, Jiangsu • Area: 320 ha

1 Progress update 1 Planning 2 construction 3 Transport system 4 supporting facilities 5

1 Progress update 1 Planning 2 construction 3 Transport system 4 supporting facilities 5 Publicity 6 Participant Invitation

1. Planning Area: 320 ha, Eastern and Western Parts Eastern Part: 200 ha, International

1. Planning Area: 320 ha, Eastern and Western Parts Eastern Part: 200 ha, International pavilions & pavilions for cities from other provinces of China Master Plan is undergoing in full swing Western Part: 120 ha, 10 th Jiangsu Expo To be adjusted for Expo 2021

2. Construction Western Part: The 10 th Jiangsu Horticultural Expo Duration: 1 month (28.

2. Construction Western Part: The 10 th Jiangsu Horticultural Expo Duration: 1 month (28. 09 -28. 10, 2018) Visitors: over 1 million. Construction: 5 sections • Entrance Section • Forested Activity Section • Horticultural Exposition Section • Tableland Sightseeing Section • Lakefront Leisure Section 4 building or garden areas Ø Main Pavilion Ø Folk Culture Village Ø Yuan Ye Garden Ø 13 city gardens

2. Construction Western Part: The 10 th Jiangsu Horticultural Expo Main pavilion

2. Construction Western Part: The 10 th Jiangsu Horticultural Expo Main pavilion

2. Construction Western Part: The 10 th Jiangsu Horticultural Expo Yuanye Garden: designed by

2. Construction Western Part: The 10 th Jiangsu Horticultural Expo Yuanye Garden: designed by famous Chinese Academician Mr Meng Zhaozhen according to the concepts from a famous Chinese ancient landscape architecture book

2. Construction Western Part: The 10 th Jiangsu Horticultural Expo City Gardens

2. Construction Western Part: The 10 th Jiangsu Horticultural Expo City Gardens

2. Construction Greening and landscaping along roads connecting the expo site 20, 000 shaped

2. Construction Greening and landscaping along roads connecting the expo site 20, 000 shaped trees 24, 000 m 2 bushes 5, 800 m 2 annuals and perennials 2, 200 m 2 aquatic plants 5 km greenways 15 landscape spots with pavilions, terraces and towers

3. Transport connecting Yangzhou to Shanghai and beyond: • The Lianyungang-Huai’an-Yangzhou-Zhenjiang high-speed railway is

3. Transport connecting Yangzhou to Shanghai and beyond: • The Lianyungang-Huai’an-Yangzhou-Zhenjiang high-speed railway is constructing in full swing and planned to operate in 2020. • The Yangzhou-Nanjing intercity railway has almost finished design and is expected to construct before end of 2019.

3. Transport Inside transport: Roads surrounding the expo site has been improved. The Yizheng

3. Transport Inside transport: Roads surrounding the expo site has been improved. The Yizheng Highspeed Railway Station, 3 km east of the expo site, is under progress of renovation Construction of the integrated transportation hub is launched.

远景住宿配套分布设想: 合� 600 合� 300 青��寨片区 高档型 中档型 低档型 100 100 合� 600 天�湖片区

远景住宿配套分布设想: 合� 600 合� 300 青��寨片区 高档型 中档型 低档型 100 100 合� 600 天�湖片区 高档型 中档型 低档型 0 0 600 4. Supporting facilities 光�水� 高档型 中档型 低档型 0 300 0 �林水�北�配套区 · 合� 高档型 中档型 低档型 1900 400 600 900 �山体育公园 高档型 中档型 低档型 0 100 500 合� 1700 合� 3000 合� 2000 �山体育小�配套区 高档型 中档型 低档型 100 300 1600 两园北�配套区 高档型 中档型 低档型 200 300 1200 两园南�配套区 高档型 中档型 低档型 200 400 2400 合� 300 芍�园 高档型 中档型 低档型 0 100 200 片区 床位数(床) 高档型 中档型 0 0 0 300 100 天�湖片区 光�水� 青��寨片区 芍�园 �山体育公园 合� 600 300 300 600 低档型 600 0 100 200 500 �山体育小�配套区 2000 100 300 1600 �林水�北�配套区 1900 400 600 900 两园北�配套区 两园南�配套区 其他村庄民宿 �� 1700 3000 400 11100 200 50 1050 300 400 50 2250 1200 2400 300 7800 酒店高中低类型比例约为 1: 2. 1: 7. 4 Catering and Accommodation facilities: • Expo Village: construction undergoing in full swing • Expo Hotel: Major construction completed • Tongshan Hill Town: A supporting tourist project for Expo 2021, including Commercials, accommodations, catering, etc is progressing on schedule for opening of the expo.

5. Benefits of the provincial expo • Most of the Infrastructures well prepared: roads,

5. Benefits of the provincial expo • Most of the Infrastructures well prepared: roads, parking lot, catering, etc • Working Team well trained from aspects of expo operation and publicity

6. Publicity Projects Signing Ceremonies Photography Competition Horticultural Dreamer Program Lecture on Expo in

6. Publicity Projects Signing Ceremonies Photography Competition Horticultural Dreamer Program Lecture on Expo in universities.

6. Publicity webpage on AIPH website official account on Weibo, We. Chat and official

6. Publicity webpage on AIPH website official account on Weibo, We. Chat and official website: Linked with major media

6. Publicity Promotions abroad: • Official visits to over 10 countries, including: Turkey Philippine

6. Publicity Promotions abroad: • Official visits to over 10 countries, including: Turkey Philippine Indonesia Myanmar • Cooperation with World Historic and Cultural Canal Cities (WCCO)

7. Business and international participants invitation Business Invitation launched Participants invitation: • Orleans, France,

7. Business and international participants invitation Business Invitation launched Participants invitation: • Orleans, France, officially announced the participation Intention of participation: • Yangon of Myanmar • Taguig of Philippine • Yogyakarta of Indonesia • Kent of America, etc.

2 Next Steps 1. Planning of the Expo site, especially the eastern part at

2 Next Steps 1. Planning of the Expo site, especially the eastern part at a high starting point 2. Accelerating surrounding supporting infrastructure. 3. Enhancing publicity 4. Speeding up participants and business invitation

II Next Steps 1. Planning High Standard High Starting Point High Requirement • Initiate

II Next Steps 1. Planning High Standard High Starting Point High Requirement • Initiate the global tenders for the master plan and design • Accelerating regulatory plan, special plans and major pavilions design, as well as • Infrastructure, supporting facilities and public greening and landscaping.

2. Accelerating surrounding supporting infrastructure. • Accelerate the construction of key projects: • Nanjing-Yangzhou

2. Accelerating surrounding supporting infrastructure. • Accelerate the construction of key projects: • Nanjing-Yangzhou Intercity Railway • Yangzhou-Ma’anshan Railway • North-Yangtze Highspeed Railway • Longtan River Channel • Wufengshan River Channel • National G 328 Yizheng Part Extension • Tongshan Characteristic Town • Landscape upgrade and ecological renovation surrounding area

3. Enhancing publicity Domestic Promotion: • Setting special column and page on major medias

3. Enhancing publicity Domestic Promotion: • Setting special column and page on major medias • Road shows in major cities • Countdown activities, etc. International Promotion: • Integrating the promotion of the expo into all official overseas visits of high level officials of Yangzhou government. • Planning special promotions national and international events in major

4. Speeding up business and international participants invitation • Establishing a special division for

4. Speeding up business and international participants invitation • Establishing a special division for international participation. • Making working plan, brochures, videos, exhibitors' manual, invitation letters. • Making use of major international economic and cultural activities, including participating in AIPH meetings, to promote the expo and invite overseas participants • Organizing domestic participants invitation