2018 NAVSEA Standard Specifications for Ship Repair and Alteration Committee (SSRAC) Meeting 30 JULY – 03 AUG 2018 Preliminary Outbrief *As of 02 AUG 2018
Environmental/Safety/Health (ESH) • 35 total proposals – 09 Adopted – 08 Adopted/Modified – 15 Not adopted – 3 Other ESH Subcommittee Action Other 8% Adopted 26% Highlights: I. No highlights Not Adopted 43% Adopted/ Modified 23% 2
Hull/Preservation • 137 Total Proposals – 27 Adopted – 43 Adopted/Modified – 60 Not Adopted – 7 Other Hull/Preservation Subcommittee Action Other 5% Adopted 20% Highlights: I. Removed 2 (G) checkpoints from NSI 009 -32 and a (V) checkpoint from NSI 009 -06. II. Reduced number of required chloride/conductivity readings by half for nonskid. III. Eliminated requirement for feathering unless directed by the SUPERVISOR. IV. Increased MAX profile on ACEs to reduce number of required DFSs. Not Adopted 44% Adopted/ Modified 31%
Machinery/QA • 25 Total Proposals – 5 Adopted – 7 Adopted/Modified – 9 Not Adopted – 4 Other Highlights: I. 009 -04 • Removed restriction on paperless QA records for paint. • Removed statement that discouraged KTR preinspections. • Removed requirement for KTRs to provide SSPC audit reports to the RMC eliminating 2 reports. II. Other 16% Adopted 20% 009 -09 • Reinstated requirement for submission of completed PCPs exclusive of Work Item completion. –Avoids additional cost due to post work completion discovery. –Avoids potential schedule impact. III. Machinery/QA Subcommittee Action 009 -13 • Cleaned up language from merger of 009 -13 and 009 -14. • Removed (V) checkpoint to “verify correct indication” – verified during optest. Not Adopted 36% Adopted/ Modified 28%
4 -E/Phraseology • 91 Total Proposals – 26 Adopted – 17 Adopted/Modified – 22 Not Adopted – 26 Other 4 -E/Phraseology Subcommittee Action Other 29% Adopted 28% Highlights: I. II. Incorporated Master Specification Work Templates Refined definitions of material types Not Adopted 24% Adopted/ Modified 19%
Piping/Boiler • 39 Total Proposals – 31 Adopted – 02 Adopted/Modified – 06 Not Adopted – 00 Other Highlights: I. PB reviewed 25 checkpoints, approved the elimination of 21, modified one, and maintained three checks. II. Didn’t recommend adopting 6 proposals but 3 of them were duplicates that were adopted. III. Reviewed and provided recommendations on 6 4 E proposals. Piping/Boiler Subcommittee Action Not Adopted 15% Adopted/ Modified 5% Adopted 79%
Electrical/Electronics • 37 Total Proposals – 14 Adopted – 13 Adopted/Modified – 9 Not Adopted – 1 Other Highlights: ex. . I. Electrical/Electronics Subcomiitte Action Other 3% Not Adopted 24% Deleted a total of 8 of 16 (V) Checkpoints and 7 of 13 (G) Checkpoints! Adopted/ Modified 35% Adopted 38%
General (non-trade-specific issues) • 46 Total Proposals – 3 Adopted – 15 Adopted/Modified – 22 Not Adopted (4 duplicates) – 6 Other No proposals from other groups General Subcommittee Action Other 13% Adopted 6% Highlights: I. II. Excellent industry engagement and support 009 -81 (Compartment Closeout; accomplish) Modified checkpoint requirement with impact of approximately 15 checkpoints and associated reports per availability. II. 009 -60 (Schedule and Associated reports for Availabilities over 9 Weeks in Duration, Provide and Manage) incorporated Critical Path analysis, eliminated a significantly burdensome and duplicative weekly report. III. Addressed the incorporation of Small Boat concerns. Adopted/ Modified 33% Not Adopted 48%
Steering Committee Action • 410 Total Proposals – 115 Adopted – 105 Adopted/Modified – 141 Not Adopted – 43 Other (i. e. , open action items) Highlights: I. II. 21 Action Items 48 Checkpoints deleted • 10 (V) deleted • 38 (G) deleted III. 2 Reports deleted IV. Small boats, small crafts, service crafts incorporated into NSIs Other 11% Adopted 28% Not Adopted 35% Adopted/ Modified 26%