2017 Exploration Production Summer Standards Meeting June 27

  • Slides: 13
Download presentation
2017 Exploration & Production Summer Standards Meeting June 27, 2017

2017 Exploration & Production Summer Standards Meeting June 27, 2017

Subcommittee on Oil Well Cements (SC-10) Tuesday June 27, 2017: General Meeting o WG

Subcommittee on Oil Well Cements (SC-10) Tuesday June 27, 2017: General Meeting o WG on Comparison of Atmospheric vs Pressurized Slurry Conditioning for Cements n Develop a technical report on recommended testing parameters when atmospheric conditioning is adequate and when HPHT conditioning is necessary. The product of the work should be a procedure to be incorporated into API RP 10 B-2 for use by field labs in evaluating Fluid Loss, Free Fluid & Rheology.

Methodology

Methodology

Participating Labs

Participating Labs

Forward Plan winter meeting o Finish out data collection. o Review raw lab data.

Forward Plan winter meeting o Finish out data collection. o Review raw lab data. o Repeat test considering standard deviation of results(will wait on item one). o Evaluate a less stable slurry to evaluate FF(pending).

Testing Matrix

Testing Matrix

Progress 6 -27 -17 o Free fluid testing is 88% completed. o Fluid loss

Progress 6 -27 -17 o Free fluid testing is 88% completed. o Fluid loss testing is 90% completed. o Rheology testing is 70% completed.

Preliminary Results (FL)

Preliminary Results (FL)

Preliminary Results (FF)

Preliminary Results (FF)

Preliminary Results Rheology

Preliminary Results Rheology

Preliminary Results Rheology

Preliminary Results Rheology

Preliminary Results Rheology

Preliminary Results Rheology

Forward Plan summer meeting o Finish out data collection. o Repeat test considering standard

Forward Plan summer meeting o Finish out data collection. o Repeat test considering standard deviation of results(will wait on item one). o Evaluate a less stable slurry to evaluate FF. o Consider 120˚F for next temperature on FL testing.