2004 Renovation Work – Shatin Stable Bend
Stable Bend Section
Stable Bend Section Original profile built in 1989 (15 yrs old) Not included in any previous reconstruction projects Profile has aged substantially and was not performing up to standard Area used frequently for feature races – HK Cup, HK Vase, APQEII, HK Derby
Aging of Stable Bend Drainage is lowered substantially To reduce the effect of organic matter accumulation, the Club has modified its maintenance procedures over the past 7 years to include more intense coring and sand topdressing, but performance of Stable Bend is still inferior due to its age
Comparison of Stable Bend and Other Sections – Drainage Rates
Comparison of Stable Bend and Other Sections – Organic Matter Content
Comparison of Stable Bend and Other Sections - summary Drainage Rates Saturated (mm/hr) Unsaturated (mm/hr) Organic matter content Stable bend 34 97 4. 40% other sections 54 236 2. 75% % deviation -59% -143% +60%
Old VS Reconstructed profiles The existing profile has been designed to meet similar drainage rate and hardness as the current performance rates of the remainder of the Shatin track
Renovation works Remove turf layer
Renovation works Excavate top organic layer (90 -100 mm) Dilute organic rich sand with fresh sand (3: 2)
Renovation works Lay 50 mm thick fresh sand mesh
Renovation works Lay 50 mm thick diluted organic layer
Renovation works Re-lay turf surface
2004 Renovation Work – Shatin Stable Bend Questions & Answers Thank you