200 MHz and 800 MHz LLRF cost estimate (no budget code yet) Complete series

200 MHz and 800 MHz LLRF cost estimate (no budget code yet) Complete series production and spares for 800 MHz: • 70 k. CHF (covered by consolidation 69318) • 1. 5 FTE (2015 -2016) 200 MHz LLRF (six cavity controllers; budget can be split between CONS, LIU) • move to new platform suggested (need CS Section + CO group input on this) • 1. 2 MCHF (2015 -2019) • 10 FTE • does not include slip-stacking for ions (separate estimate in progress) nor new beam control • • • detailed estimate available for hardware and firmware suggestion to enter this detailed estimate into the EVM/WBS system includes LLRF cabling for six cavities (200 k. CHF) does not include software effort nothing spent yet on the 200 MHz LLRF

BA 2 transverse feedback system (69040, 2015: 40% committed) Protons (105 k. CHF, 2015)

BA 2 transverse feedback system (69040, 2015: 40% committed) Protons (105 k. CHF, 2015) • connection to OASIS system: 5 k. CHF • instrumentation: 70 k. CHF (currently using borrowed instruments from HIE-Isolde) • version 2 of analog board and spares (improved mixer): 15 k. CHF • Issue with scrubbing doublet, solution being studied • spares for digital board (m. DSPU): 15 k. CHF Ions: • tests with ions planned for 2015 Pb ion run to decide on exact clocking scheme • decide when we need damper during the cycle (study needed for use during slip-stacking) • Budget: 100 k. CHF in each 2018 and 2019 for ions

BA 3 High Bandwidth damper system (69040, 2015: 40% committed) 2015: (90 k. CHF)

BA 3 High Bandwidth damper system (69040, 2015: 40% committed) 2015: (90 k. CHF) • collaboration follow-up and travel: 15 k. CHF • electronics development (closed orbit suppression): 25 k. CHF • slot-line kicker manufacturing: 50 k. CHF • power amplifiers (R&K): 60 k. CHF 2016: (395 k. CHF) • collaboration follow-up: 15 k. CHF • slot-line kicker manufacturing and test: 150 k. CHF • power amplifiers: 90 k. CHF • electronics: 70 k. CHF • 60 k. CHF if we install slot-line • 20 k. CHF electronics and cabling if we install slot-line • new pick-up dropped ? • re-scope as part of the 2016 review (some cost 2017 + possible) 1133 k. CHF of cost for HBTD is 2017 + Reminder: total 69040: 844 k. CHF charged, 876 k. CHF committed