17 th RDMS Conference Russia and Dubna Member
17 th RDMS Conference Russia and Dubna Member States CMS Collaboration I. Golutvin 20 Years of RDMS CMS Introductory talk 7 August, Dubna I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 1
October 1990 Aachen Carlo Rubbia and Giorgio Brianti reported on the possibility to build in the LEP tunnel a 16 Te. V p-p machine with 1034 luminosity. • The final design of 14 Te. V LHC was approved by CERN Council in December 1994 • The Construction was started in November 2000 I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 2
October 1990 Aachen Michel Della Negra with UA 1 colleagues Karsten Eggert and Martti Pimiä proposed concept of LHC Experiment based on super conducting solenoid with a strong magnetic field “Compact Muon Solenoid”. I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 3
March 1992 Evian • The main Concept of the CMS Detector shown in Expression of Interest in Evian, 1992 I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 4
1 October 1992 • CMS Letter of Intent • CERN/LHCC 92 -3 The design goals of CMS were defined as follows: 1) a very good and redundant muon system, 2) the best possible electromagnetic calorimeter (ECAL) consistent with 1), 3) a high quality central tracking to achieve 1) and 2), 4) a hermetic hadron calorimeter 5) a financially affordable detector. The design of CMS was based on leading detector technologies developed by CMS members 5 I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014
27 September 1994 Dubna • Formally RDMS was established 27 September 1994 in Dubna I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 6
December 1994 • Approval of the CMS Technical Proposal by CERN Council. I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 7
October 1995 • Session of the Scientific Policy Committee of Russian National Program of Fundamental Nuclear Physics, Arzamas-16, Sarov I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 8
December 1995 RDMS CMS Project CMS Document 96 -85, 1995 I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 9
15 March 1996 • Interim Mo. U CMS RRB-D 96 -6 I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 10
22 May 1996 • Decree of RF Government on Annual Funding for 10 years starting from 1997, № 818 -p I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 11
14 June 1996 • Protocol RF – CERN on participation in LHC Project I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 12
14 April 1997 • Protocol JINR – CERN on participation in LHC Project I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 13
29 April 1998 • Mo. U, CMS Document 1998 -053 on CMS Construction I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 14
2008 End of CMS Construction Total RDMS Contribution for Construction of the CMS Detector, according to the Mo. U and CERN-RF Protocol I. Golutvin Mo. U RDMS RF: Mo. U RDMS DMS: Cost-to-Completion: In-kind 1, 500 crystals 12, 047 k. CHF 6, 794. 6 k. CHF 2, 211. 5 k. CHF 1, 657 k. CHF RDMS Grant Total 22, 710. 1 k. CHF 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 15
30 March 2010 • LHC and CMS Start-up at 7 Te. V I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 16
4 July 2012 • Higgs Boson discovery I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 17
July 2013 I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 18
March 2013 • End of Run 1 • Beginning of CMS Phase 1 Upgrade • RDMS responsibilities are defined in Agreement between RDMS and CMS management on 25 October 2013 I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 19
Agreement on RDMS Responsibilities I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 20
Agreement on RDMS Responsibilities I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 21
March 2015 • Expected Run 2 CMS Start-up • at 13 Te. V and designed Luminosity I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 22
Future LS 2 LS 3 starting in 2018 (July) LHC: starting in 2023 Injectors: in 2024 30 fb-1 (Extended) Physics Shutdown => 18 months + 3 months BC => 30 months + 3 months BC => 13 months + 3 months BC Beam commissioning Technical stop Year End Technical Stop: (E)YETS Run 2 YETS EYETS LS 2 Run 3 PHASE 1 YETS 300 fb-1 YETS LS 3 Run 4 PHASE 2 LS 4 Run 5 LS 5 3’ 000 fb-1 I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 23
Main Objectives for Future • Study of the Brout-Engelert-Higgs mechanism is still a main focus • Search for Supper Symmetry signals • CMS Phase 2 Upgrade at HL-LHC • I would wish to all of us a success ! I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 24
Conference Sessions today • The overview of CMS physics results in Run 1 • CMS physics plan for Run 2. • CMS Upgrade Phase 1 for designed energy and luminosity with participation of RDMS. I. Golutvin 20 Years of RDMS. Introductory talk, Dubna, 7 August, 2014 25
- Slides: 25