1. Status of ST 1 2. Status of integration of ST 1 and ST

1. Status of ST 1 2. Status of integration of ST 1 and ST 2 Peyrej @ ipno. in 2 p 3. fr Jean Peyré Badesi - May 2006 IPNO-RDD-Jean Peyré 1

1. Status of ST 1 Peyrej @ ipno. in 2 p 3. fr 2.

1. Status of ST 1 Peyrej @ ipno. in 2 p 3. fr 2. Status of integration of ST 1 and ST 2 IPNO-RDD-Jean Peyré 2

Status of ST 1 • • Peyrej @ ipno. in 2 p 3. fr

Status of ST 1 • • Peyrej @ ipno. in 2 p 3. fr • 9 tracking Quadrants (Q 1 to Q 9) of ST 1 are now constructed till end of March Gain homogeneity, Gas leakage, Mechanical tension on wires and Dark current are within defined standards Only on one quadrant (Q 2), mean mechanical tension on wires is two high (70 g instead of 60 g). About 2 wires are breaking per 6 months. The wires have to be changed and stretched at nominal tension of 60 g IPNO-RDD-Jean Peyré 3 Badesi - Sardinia - May 2006

Status of ST 1 Quadrants are being equipped now with electronic exit boards before

Status of ST 1 Quadrants are being equipped now with electronic exit boards before final mounting at CERN (waiting for MANU cards) Peyrej @ ipno. in 2 p 3. fr • IPNO-RDD-Jean Peyré 4 Badesi - Sardinia - May 2006

1. Status of ST 1 2. Status of integration of ST 1 and ST

1. Status of ST 1 2. Status of integration of ST 1 and ST 2 a) Tests of installation for supports Peyrej @ ipno. in 2 p 3. fr b) Tests of installation for Monitoring System c) Gas d) Cooling IPNO-RDD-Jean Peyré 5

Integration of ST 1 and ST 2 Real FASS Ø Preassembly in Orsay in

Integration of ST 1 and ST 2 Real FASS Ø Preassembly in Orsay in 2005/2006 of the whole support structure Ø CERN sept 2006 Peyrej @ ipno. in 2 p 3. fr Dummy FASS Ø Design of supports for Station 1 & 2 by IPNO Ø Integration/Cooling and Construction of supports for Station 1 & 2 by IPNO-RDD-Jean Peyré 6 Badesi - Sardinia - May 2006

Integration of ST 1 and ST 2 Rails ST 1 & ST 2 Dummy

Integration of ST 1 and ST 2 Rails ST 1 & ST 2 Dummy FASS Peyrej @ ipno. in 2 p 3. fr IN 2 P 3 HAll Supports ST 1/ST 2 IPNO-RDD-Jean Peyré 7 Badesi - Sardinia - May 2006

Integration of ST 1 and ST 2 Peyrej @ ipno. in 2 p 3.

Integration of ST 1 and ST 2 Peyrej @ ipno. in 2 p 3. fr Mounting of Structure with crane IPNO-RDD-Jean Peyré 8 Badesi - Sardinia - May 2006

Integration of ST 1 and ST 2 Peyrej @ ipno. in 2 p 3.

Integration of ST 1 and ST 2 Peyrej @ ipno. in 2 p 3. fr Mounting of dummy absorber with crane IPNO-RDD-Jean Peyré 9 Badesi - Sardinia - May 2006

Integration of ST 1 and ST 2 Peyrej @ ipno. in 2 p 3.

Integration of ST 1 and ST 2 Peyrej @ ipno. in 2 p 3. fr Mounting of real Quadrants for ST 1 IPNO-RDD-Jean Peyré 10 Badesi - Sardinia - May 2006

1. Status of ST 1 2. Status of integration of ST 1 and ST

1. Status of ST 1 2. Status of integration of ST 1 and ST 2 a) Tests of installation for supports Peyrej @ ipno. in 2 p 3. fr b) Tests of installation for Monitoring System c) Gas d) Cooling IPNO-RDD-Jean Peyré 11

Assembly tests for mounting ST 1/ST 2 • The aim of this test is

Assembly tests for mounting ST 1/ST 2 • The aim of this test is to study all problems related to the mounting of: 1. Rails 2. Supports for Station 1 & Station 2 3. Hanging and positioning quadrants of Station 1 & Station 2 Peyrej @ ipno. in 2 p 3. fr • An other purpose is to imagine and realise the tools needed for achieving this job without electrical crane from cavern in a volume isolated from the cavern where only 2 or 3 persons can work at the same time IPNO-RDD-Jean Peyré 12 Badesi - Sardinia - May 2006

Assembly tests ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Fixation

Assembly tests ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Fixation of hanging hooks for manual cranes Special Scaffold Adapted to the FASS IPNO-RDD-Jean Peyré 13 Badesi - Sardinia - May 2006

Assembly tests ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Hanging

Assembly tests ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Hanging the rails IPNO-RDD-Jean Peyré 14 Badesi - Sardinia - May 2006

Assembly tests ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Lifting

Assembly tests ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Lifting the rails to the ceiling of the FASS IPNO-RDD-Jean Peyré 15 Badesi - Sardinia - May 2006

Assembly tests ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Rails

Assembly tests ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Rails fixed to the ceiling of the FASS IPNO-RDD-Jean Peyré 16 Badesi - Sardinia - May 2006

Assembly tests ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Hanging

Assembly tests ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Hanging and fixing the supports ST 1 & ST 2 All tools and accessories will be certified by APAVE as requested by CERN Special accessory for hanging supports IPNO-RDD-Jean Peyré 17 Badesi - Sardinia - May 2006

Assembly tests ST 1/ST 2 Hanging and fixing the supports ST 1 & ST

Assembly tests ST 1/ST 2 Hanging and fixing the supports ST 1 & ST 2 RAILS Peyrej @ ipno. in 2 p 3. fr WAGGONS Support fixed Lifting support IPNO-RDD-Jean Peyré 18 Badesi - Sardinia - May 2006

Assembly tests ST 1/ST 2 Hanging and fixing the quadrants of ST 1 Peyrej

Assembly tests ST 1/ST 2 Hanging and fixing the quadrants of ST 1 Peyrej @ ipno. in 2 p 3. fr Fixations of Quadrant Weights for balance IPNO-RDD-Jean Peyré 19 Badesi - Sardinia - May 2006

Assembly tests ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Hanging

Assembly tests ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Hanging and fixing the quadrants of ST 2 Fixations of Quadrant IPNO-RDD-Jean Peyré 20 Badesi - Sardinia - May 2006

1. Status of ST 1 2. Status of integration of ST 1 and ST

1. Status of ST 1 2. Status of integration of ST 1 and ST 2 a) Tests of installation for supports Peyrej @ ipno. in 2 p 3. fr b) Tests of installation for Monitoring System c) Gas d) Cooling IPNO-RDD-Jean Peyré 21

Test of monitoring Platforms IPN Lyon Peyrej @ ipno. in 2 p 3. fr

Test of monitoring Platforms IPN Lyon Peyrej @ ipno. in 2 p 3. fr Platform for Monitoring System IPNO-RDD-Jean Peyré 22 Badesi - Sardinia - May 2006

Test of monitoring Platforms IPN Lyon Peyrej @ ipno. in 2 p 3. fr

Test of monitoring Platforms IPN Lyon Peyrej @ ipno. in 2 p 3. fr Tests in Orsay of the Monitoring system 11 th and 12 th of May on real size dummy FASS IPNO-RDD-Jean Peyré 23 Badesi - Sardinia - May 2006

1. Status of ST 1 2. Status of integration of ST 1 and ST

1. Status of ST 1 2. Status of integration of ST 1 and ST 2 a) Tests of installation for supports Peyrej @ ipno. in 2 p 3. fr b) Tests of installation for Monitoring System c) Gas d) Cooling IPNO-RDD-Jean Peyré 24

Peyrej @ ipno. in 2 p 3. fr Where is gas, Cooling? IPNO-RDD-Jean Peyré

Peyrej @ ipno. in 2 p 3. fr Where is gas, Cooling? IPNO-RDD-Jean Peyré 25 Badesi - Sardinia - May 2006

Peyrej @ ipno. in 2 p 3. fr Where is gas, Cooling? Dipole Magnet

Peyrej @ ipno. in 2 p 3. fr Where is gas, Cooling? Dipole Magnet IPNO-RDD-Jean Peyré 26 Badesi - Sardinia - May 2006

Peyrej @ ipno. in 2 p 3. fr Where is gas, Cooling? Quadrants ST

Peyrej @ ipno. in 2 p 3. fr Where is gas, Cooling? Quadrants ST 2 IPNO-RDD-Jean Peyré 27 Badesi - Sardinia - May 2006

Peyrej @ ipno. in 2 p 3. fr Where is gas, Cooling? Quadrants ST

Peyrej @ ipno. in 2 p 3. fr Where is gas, Cooling? Quadrants ST 1 IPNO-RDD-Jean Peyré 28 Badesi - Sardinia - May 2006

Peyrej @ ipno. in 2 p 3. fr Where is gas, Cooling? Supports ST

Peyrej @ ipno. in 2 p 3. fr Where is gas, Cooling? Supports ST 1 & ST 2 IPNO-RDD-Jean Peyré 29 Badesi - Sardinia - May 2006

Where is gas, Cooling? Peyrej @ ipno. in 2 p 3. fr Gas pipes

Where is gas, Cooling? Peyrej @ ipno. in 2 p 3. fr Gas pipes Cooling pipes IPNO-RDD-Jean Peyré 30 Badesi - Sardinia - May 2006

Where is gas, Cooling? Low Voltage Boxes Peyrej @ ipno. in 2 p 3.

Where is gas, Cooling? Low Voltage Boxes Peyrej @ ipno. in 2 p 3. fr CROCUS Boxes Gas pipes IPNO-RDD-Jean Peyré 31 Badesi - Sardinia - May 2006

Gas connections for ST 1 Serto technology GAS INPUT Tuyau Inox sur chambre f

Gas connections for ST 1 Serto technology GAS INPUT Tuyau Inox sur chambre f 8 Union double Serto 2 Douilles d’appui Serto SO 51021 -8 Union double réduite Serto Tuyau Inox f 6 SO 51021 -8 -6 SO 50003 -8 -5 Connection between Quadrants and Gas tubes inside the FASS Tuyau Inox sur chambre f 8 STATION 1 Tuyau Sertoflex f 8 GAS OUTPUT Réduction Serto 2 Douilles d’appui Serto SO 51821 -A 12 -8 Union double Serto SO 51021 -12 Peyrej @ ipno. in 2 p 3. fr SO 50003 -8 -5 Tuyau Inox f 12 Tuyau Sertoflex f 8 IPNO-RDD-Jean Peyré 32 Badesi - Sardinia - May 2006

Special requirements for ST 2 Peyrej @ ipno. in 2 p 3. fr From

Special requirements for ST 2 Peyrej @ ipno. in 2 p 3. fr From 2 nd to 12 th of may, our colleagues from SINP came to Orsay to test the mounting of ST 2. Here are our main commun conclusions: 1. Special care must be taken to verify the size of real chambers 2. SINP has to study and construct the tools for lifting quadrants of ST 2 3. Low Voltage Bus Bars are in contact with metallic supports and plateform of alignment systems. SINP has in charge the modification of the bus bars to avoid those problems 4. SINP has in charge the connection of gas tubes to the general gas system IPNO-RDD-Jean Peyré 33 Badesi - Sardinia - May 2006

1. Status of ST 1 2. Status of integration of ST 1 and ST

1. Status of ST 1 2. Status of integration of ST 1 and ST 2 a) Tests of installation for supports Peyrej @ ipno. in 2 p 3. fr b) Tests of installation for Monitor System c) Gas d) Cooling IPNO-RDD-Jean Peyré 34

Cooling for ST 1/ST 2 Simulation 2002 IPNO – Model ST 1 Air outlet

Cooling for ST 1/ST 2 Simulation 2002 IPNO – Model ST 1 Air outlet Peyrej @ ipno. in 2 p 3. fr Additional Air outlet Gap 40 mm Air inlet By François Launay IPNO-RDD-Jean Peyré 35 Badesi - Sardinia - May 2006

Cooling for ST 1/ST 2 Simulation 2002 IPNO – Air Velocity Gap 0 mm

Cooling for ST 1/ST 2 Simulation 2002 IPNO – Air Velocity Gap 0 mm Gap 40 mm Additional Air outlet Peyrej @ ipno. in 2 p 3. fr Air stopped By François Launay IPNO-RDD-Jean Peyré 36 Badesi - Sardinia - May 2006

Cooling for ST 1/ST 2 Simulation 2002 IPNO - Air Temperature Gap 0 mm

Cooling for ST 1/ST 2 Simulation 2002 IPNO - Air Temperature Gap 0 mm Gap 40 mm Additional Air outlet Peyrej @ ipno. in 2 p 3. fr ~64°C ~38°C By François Launay IPNO-RDD-Jean Peyré 37 Badesi - Sardinia - May 2006

Cooling for ST 1/ST 2 TOP OUTLET ST 1 Peyrej @ ipno. in 2

Cooling for ST 1/ST 2 TOP OUTLET ST 1 Peyrej @ ipno. in 2 p 3. fr ST 2 Design issued from previous simulations IPNO-RDD-Jean Peyré BOTTOM INLET 38 Badesi - Sardinia - May 2006

Cooling for ST 1/ST 2 Bottom – Blowing Air 207 m 3/h On each

Cooling for ST 1/ST 2 Bottom – Blowing Air 207 m 3/h On each outlet, special grids are fixed for settling airflow 210 m 3/h 207 m 3/h 37 m 3/h Cooling Quadrants Cooling CROCUS 184 m 3/h 3 184 m /h 184 m 3/h Peyrej @ ipno. in 2 p 3. fr 37 m 3/h Air output speed of 3 -4 m/s 37 m 3/h 2500 m 3/h IPNO-RDD-Jean Peyré 39 Badesi - Sardinia - May 2006

Cooling for ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Top

Cooling for ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Top – Inhaling Air IPNO-RDD-Jean Peyré 40 Badesi - Sardinia - May 2006

Cooling for ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Top

Cooling for ST 1/ST 2 Peyrej @ ipno. in 2 p 3. fr Top – Inhaling Air IPNO-RDD-Jean Peyré 41 Badesi - Sardinia - May 2006

Cooling for ST 1/ST 2 Top – Inhaling Air 2500 m 3/h Air output

Cooling for ST 1/ST 2 Top – Inhaling Air 2500 m 3/h Air output speed of 3 -4 m/s On each output, special grids are fixed for settling airflow Cooling CROCUS 158 m 3/h 37 m 3/h Peyrej @ ipno. in 2 p 3. fr 164 m 3/h 443 m 3/h 20 m 3/h IPNO-RDD-Jean Peyré Cooling Quadrants 158 m 3/h 376 m 3/h 15 m 3/h 164 m 3/h 37 m 3/h 443 m 3/h 20 m 3/h 37 m 3/h Special pipes for Hot spots 42 Badesi - Sardinia - May 2006

Installation at CERN Schedule 2006 September 36 37 38 October 39 40 41 42

Installation at CERN Schedule 2006 September 36 37 38 October 39 40 41 42 November 43 44 45 46 47 48 Installation- Rails Installation- Supports * Installation- Cooling To be discussed Peyrej @ ipno. in 2 p 3. fr Installation - Quadrants *: Amec Spie IPNO-RDD-Jean Peyré 43 Badesi - Sardinia - May 2006

Peyrej @ ipno. in 2 p 3. fr Many Thanks to all participants IPNO-RDD-Jean

Peyrej @ ipno. in 2 p 3. fr Many Thanks to all participants IPNO-RDD-Jean Peyré 44 Badesi - Sardinia - May 2006