1 Hi-Lumi RFD CM Project P 455 at TRIUMF Bob Laxdal June 19, 2020

1 Hi-Lumi RFD CM Project P 455 at TRIUMF Bob Laxdal June 19, 2020 2019 -04 -08 Hi-Lumi “Chrisis” PSM Discovery, accelerated TRIUMF Hi-Lumi Technical Coordinator

Our status – § TRIUMF is now transitioning to new CV -19 protocols –

Our status – § TRIUMF is now transitioning to new CV -19 protocols – technical staff coming on site – work on CM work is ramping up – we have one CM in the pipeline before we start Hi-Lumi TCM-0 § We continue with remote design work including project planning § Student engaged in fixture/handling design – cavity support frame 2

TRIUMF Project milestones- updated In principle we would like to get to Gate 3

TRIUMF Project milestones- updated In principle we would like to get to Gate 3 before standard procurements. The prototype TCM 0 could be considered in a Gate 3 A. Still need to complete Addendum 5 – delayed due to COVID Project Milestone Proposed date Hi-Lumi input Gate 1 Dec 2019 Conceptual design review, preliminary scope def’n Gate 2 Feb 2020 June 2020 Final scope def’n, detailed budget Gate 3 A TCM 0 May 2020 Oct 2020 TCM 0 design review, released drawings and specifications Tech review Aug. 2021 Launch long lead procurements Gate 3 B TCM 1 -4 Final design review, released drawings and specifications Dec. 2021 3

Summary 4 • • • CV-19 update • Technical staff now coming back to

Summary 4 • • • CV-19 update • Technical staff now coming back to work in stages • Some delays in current CM assembly (another project) Tooling and handling fixtures • Student working on cavity support tooling for clean room and cold test MOU-Addendum • Last few comments being accepted by both sides