1 CHAMBER PRODUCTION AT CERN 904 RPC UPGRADEMEETING
1 CHAMBER PRODUCTION AT CERN 904 RPC UPGRADE-MEETING, 15. JAN. 2014 DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY, KOREA
Content 1. Status of 904 site 2. Plan 3. Data Analysis 4. Plan 2
1. Status of 904 site v 3 Last week, we did below… 1) Received New RE 4/2 Gaps( 16 BO ) at 13. Dec. 2013 2) Visual Test – 1 gap has a small bubble on the HV side –ref) page No. 4 3) Leak Test – still ongoing – Fig. 1 4) Dark current test - 3 TN, 3 TW, 3 BO 5) Closed RE 4/2 Chamber & connected ground-cable – Fig. 2 6) Prepared HV cable connector – Fig. 3 <Fig. 1 > <Fig. 2 > <Fig. 3 >
1. 1 Visual Test result v RE 4/2 BO 86 HV – side ≈ 5 cm bubble 4
2. Plan v Leak Test v Dark-current test for RE 4/2 Gaps v New Build 2 -RE 4/2 Chambers v Cosmic-ray test for 2 -RE 4/2 Chambers 5
3. Data Analysis 6
3. Data Analysis 7 CMSSW Release Global Tag Single. Mu/Run 2012 A 22 Jan 2013 -v 1/AOD CMSSW_5_3_7_patch 5 FT_R_53_V 18: : All Single. Mu/Run 2012 B 22 Jan 2013 -v 1/AOD CMSSW_5_3_7_patch 5 FT_R_53_V 18: : All Single. Mu/Run 2012 C 22 Jan 2013 -v 1/AOD CMSSW_5_3_7_patch 5 FT_R_53_V 18: : All
3. 1 Ntuple < Eta > < Pt >
3. 1 Ntuple – For Trigger < Iso. Mu 24_eta 2 p 1 >
3. 2 Results – For IDIso R u n 2 0 1 2 A
3. 2 Results – For IDIso R u n 2 0 1 2 A
3. 2 Results – For IDIso R u n 2 0 1 2 A
3. 2 Results – For STA R u n 2 0 1 2 A
3. 2 Results – For STA R u n 2 0 1 2 A
3. 2 Results – For STA R u n 2 0 1 2 A
3. 2 Results – For Tracking R u n 2 0 1 2 A
3. 2 Results – For Tracking R u n 2 0 1 2 A
3. 2 Results – For Tracking R u n 2 0 1 2 A
3. 2 Results – For Trigger R u n 2 0 1 2 A
3. 2 Results – For Trigger R u n 2 0 1 2 A
3. 2 Results – For Trigger R u n 2 0 1 2 A
4. Plan
- Slides: 22